For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-3 — Same—Preparation of plans, maps, by city engineer

Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Code of Ordinances § 25-3

Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/83b7bd84-d48a-488a-a4f3-f21bccef7da8

Sec. 25-3. - Same—Preparation of plans, maps, by city engineer.

Before any public sewer and/or storm sewer shall be contracted for or built, the city engineer shall cause to be prepared the necessary plans for the work and profile showing grades of the street and sewer and/or storm sewer, the depth of such sewer and/or storm sewer below the surface of the street, and the height above mean sea level, as established by the United States Coast and Geodetic Survey and used as the city datum. And when such sewer and/or storm sewer is completed, the city engineer shall cause a map to be prepared, showing the location and size of the sewer and/or storm sewer and the location of the manholes, basins, culverts, branches for house connections, and other appurtenances. The city engineer shall also cause a map to be prepared showing the situation, dimensions, and ownership of all lands adjoining the street in which said sewer or storm sewer is laid, as provided in the portion of this Code dealing with assessments.

(Ord. of 10-4-82)

Ask a question about New Haven law

Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.