For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-30 — Quantity determination

Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Code of Ordinances § 25-30

Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/c5241e16-e366-4209-8b7d-76face6e0693

Sec. 25-30. - Quantity determination.

(a) Unless otherwise provided, the quantity of waste water delivered to the city sewers will be construed as being the same as the water delivered to the producer by the company water system. If it is ascertained that the water meter has inaccurately measured the amount of water delivered to the permittee, then and in that event the sanitary sewer charge established herein shall be adjusted in the same manner as adjustments are made to the water bill. (b) Should the producer evaporate or otherwise dispose of water delivered by the company water system other than to the city sewer system, the industrial waste producer may avail himself of the provisions of section 25-15 and section 25-16. (c) Under the provisions of section 25-15, it shall be the obligation of the permittee to conduct a test on the flow measuring equipment as follows: meters measuring four and five-tenths (4.5) ccf or greater per day shall be tested at least once every twelve (12) months; meters measuring four and forty-nine-one-hundredths (4.49) ccf or less per day shall be tested at least once every four (4) years. The test shall be used to determine the meter accuracy and the results thereof shall be furnished in writing to the general manager. It shall also be the permittee's responsibility to notify the general manager within a reasonable time in advance so that the general manager may, if he chooses, have a witness present during such test. If, upon any such test, the percentage of accuracy is found to be within the accuracy tolerance established by the manufacturer's specifications, such measuring equipment shall be determined to have correctly measured the quantity delivered to the sewer system. If, however, upon any such test, the percentage of accuracy is found to be in excess of the accuracy tolerance specified by the manufacturer's specifications, then such measuring equipment shall be immediately adjusted to register correctly the quantity delivered to the sewer system. The billings to such permittee shall be adjusted for a period extending back to the time when the inaccuracy began, if such time is ascertainable, or for a period extending back one-half of the time elapsed since the date of the last test or the date of the last adjustment, if the time is not ascertainable. (d) Any producer for which the water supply is from private wells shall install, operate and maintain at its expense such meters or other devices as are necessary to determine quantity discharge to the sewer system. Such meters shall be approved by the general manager. (e) In the event none of the above provisions are applicable, all producers for which the water supply is from other than the company, shall furnish to the WPCA either a certified meter reading of water delivered to its plant or company or a copy of the billing from the water supplier. In this event, the permittee's charges will be calculated and the same conditions will apply as if the company were the supplier of water to the permittee.

(Ord. of 10-4-82)

Ask a question about New Haven law

Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.