For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-40 — Computation of industrial user charges

Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Code of Ordinances § 25-40

Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/966b52c0-01b8-4668-817e-26bdc49756be

Sec. 25-40. - Computation of industrial user charges.

(a) The user charges to be determined for all permitted manufacturing or other producers of waste water to which this chapter applies, except for dry industries, will be computed by the use of the following formula: UC = V [X + Y (BOD) + Z (TSS)]. UC | = | User charge (in dollars) for each billing period. V | = | Volume in ccf discharged to the City sanitary sewer system during the billing period. X | = | Cost per ccf of waste water treated. Y | = | Cost to remove one mg/l of BOD per ccf. Z | = | Cost to remove one mg/l of TSS per ccf. (b) Those industries defined herein as dry industries, or industries producing wastes containing both BOD and TSS or less than two hundred fifty (250) mg/l, will pay a sewer service charge as established and revised from time to time by the WPCA. (c) When either BOD or TSS in a discharged waste water is more than two hundred fifty (250) mg/l, the formula in subsection (a) will be used, but in no event will either be used at less than two hundred fifty (250) mg/l in the computations. (d) When an industry produces both domestic and process waste water with one connection to the sewer system, the waste water so delivered will be considered as industrial waste water and the user charge computations will be in compliance with (a) and (b) above, based on the combined volume, BOD and TSS content. (e) A permittee may reduce his user charge rate by greater removals in pretreatment or plant operation procedure, but once the pretreatment or plant procedure is established to obtain a uniform or lower rate, written consent from the general manager to increase the delivered strength shall be required, and charges for a higher rate based on tests by the WPCA may be made without other notice to the permittee. (f) Monthly billing or quarterly billing for industrial waste water disposal will be accomplished, using the established procedures.

(Ord. of 10-4-82)

Ask a question about New Haven law

Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.