§ 18-56 — Bonding and insurance
Code of Ordinances of the City of New London, Connecticut (Codified through November 4, 2024. (Supp. No. 26)) · New London Code of Ordinances § 18-56
Corpus is an independent public-information project, not the official City of New London website. Stable reference: corpuslaw.us/code/29cb2e20-ade4-4d7d-9730-8013ad072bc4
Sec. 18-56. - Bonding and insurance.
(a) Before a permit is granted, the applicant will be required to provide the public works department with a permit bond. This is required to ensure the faithful performance of the work contemplated. The bond shall be issued by an approved surety company licensed in the state, a passbook in the name of the City of New London or a letter of credit issued with the City of New London as beneficiary. It shall be for a minimum of ten thousand dollars ($10,000.00), or an amount equal to the estimated cost of restoring the ground, reconstructing the sidewalk, resetting the curb, and laying of the pavement; if any, and the compliance with the provisions of this article as hereinafter set forth, said cost to be estimated by the contractor, and approved by the director of public works or their appointed representative, to ensure the proper restoration of the ground, reconstructing the sidewalk, resetting the curb, and laying of the pavement, if any, and the compliance with the provisions of this article requiring the control of dust, mud, and erosion, and the protection of the public by barricades, lights, temporary ramps, railings, covers, roadways, walks and approaches as required by the city. (b) The bond shall be kept in force for the duration of the work, and in the case of excavations for a period of one year after final inspection of the work. In lieu of a separate deposit for each permit, the applicant may make an annual cash deposit in an amount four (4) times the amount required for the separate deposit herein required, which shall cover all permits issued to such applicant during a period of one year following the making of such deposit. All bonds shall continue in force until one year after final acceptance of satisfactory completion of work. (c) The contractor shall produce evidence satisfactory to the city of insurance as will protect him/her from claims set forth below which may arise out of or result from the contractor's execution of the work, whether such execution be by himself/herself or by a subcontractor or by anyone directly employed by any of them, or by anyone for whose acts any of them may be liable. (1) Claims under workmen's compensation, disability benefit and other similar employee benefit acts. (2) Claims for damage because of bodily injury, sickness, disease or death of any person other than his/her employee. (3) Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. (d) Certificates of insurance acceptable to the city shall be filed with the public works department prior to the issuance of a permit for the work. These certificates shall contain a provision that coverages afforded under the policies shall not be cancelled unless thirty (30) days' prior written notice has been given to the public works department. (e) The contractor shall procure and maintain, at their own expense, liability insurance as hereinafter specified: Bodily injury liability insurance, including wrongful death, and property damage insurance in the minimum amount of one million dollars ($1,000,000.00) each occurrence, two million dollars ($2,000,000.00) aggregate; products or completed operations insurance in the minimum amount of one million dollars ($1,000,000.00) each occurrence, two million dollars ($2,000,000.00) aggregate; professional liability insurance, including errors and omissions, in the minimum amount of two million dollars ($2,000,000.00) each occurrence; Special risk insurance covering underground explosion and collapse hazard in the minimum amount of one million dollars ($1,000,000.00); automobile liability insurance in the minimum amount of one million dollars ($1,000,000.00) combined single limit for each accident. (f) The contractor shall procure and maintain, at their own expense, during the permit time, in accordance with the laws of the State of Connecticut, workers' compensation insurance, including occupational disease provision, for their employees at the site of the project, and in case any work is sublet, the contractor shall require such subcontractor similarly to provide workmen's compensation insurance, including occupational disease provision for all the latter's employees, unless such employees are covered by the protection afforded by the contractor. In case any class of employees engaged in hazardous work is not protected under workmen's compensation statutes, the contractor shall provide and shall cause each subcontractor to provide adequate and suitable insurance for the protection of his/her employees not otherwise protected. (g) The contractor shall provide the city with a certificate of insurance designating the city public works department, and the City of New London and its agents as additional insured. (h) The contractor will indemnify and hold harmless the city, its public works department, and its agents and employees from and against all claims, damages, losses, and expenses, including attorney's fees, arising out of or resulting from the performance of work pursuant to or within the scope of this article, provided that any such claims, damage, loss or expense attributable to bodily injury, sickness, disease or death or injury to or destruction of tangible property, including the loss of use resulting therefrom, is caused in whole or in part by any negligent or willful act or omission of the contractor, any subcontractor or anyone for whose acts any of them may be liable. Additional policies of owner's protective liability and builder's risk coverage on larger projects may also be required in addition to the above hold-harmless clause at the discretion of the director of public works or their appointed representative, the limits of such insurance to be determined by the director of public works or their appointed representative. (i) In any and all claims against the City of New London, its engineering department, the director of public works or any of their agents or employees, by any employee of the contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the contractor or any subcontractor under workmen's compensation acts, disability benefit acts, or other employee benefits acts.
(Ord. No. 06-15-15-2, § 1)
Ask a question about New London law
Corpus searches the New London sections it holds and shows the ones that match, with their citations. Free, no sign-in.