Sec. 18-58. - Restoration of damage.

(a) After all damaged pavement has been removed and all edges have a clean-cut vertical face, a temporary pavement patch two (2) inches thick of hot-mix asphalt shall be spread and rolled to form a smooth surface with the existing roadway. During the time of year in which the asphalt plants are shut down, a two-inch course of cold-mix asphalt may be used in lieu of the hot-mix asphalt. (b) The contractor shall be responsible for the cost to repair any and all damages to curbs, sidewalks, roads, property of the City of New London, and adjacent private property caused by the contractor, his/her agents, employees, subcontractors, and their agents or employees. All repairs to damage shall be done to the complete satisfaction of the director of public works or city inspector. (c) After installation of the temporary patch, the contractor shall perform any work to correct or maintain the temporary patch, complete any unfinished work and, within six (6) months of the installation of the temporary patch and after a ninety-day settling period, install the permanent patch. The permanent patch is to conform to the city public works department's standard details, available in the building department and public works department offices. (d) The contractor shall be responsible for the cost of repairing any trench settlement for a period of one year from the date of final acceptance. (e) The contractor shall fine grade, loam, seed and protect any unpaved area disturbed by his/her activity on the site in accordance with the specifications of the city. (f) The contractor shall maintain all erosion control measures required in functional condition until stabilization of all erodible areas. (g) The public works director may require the contractor to compensate the city for or make repairs to any areas not in the immediate vicinity of the construction that have been damaged by the activities of the contractor or as a result of his activities.

(Ord. No. 06-15-15-2, § 1)