§ 18-57 — Performance standards
Code of Ordinances of the City of New London, Connecticut (Codified through November 4, 2024. (Supp. No. 26)) · New London Code of Ordinances § 18-57
Corpus is an independent public-information project, not the official City of New London website. Stable reference: corpuslaw.us/code/9b465b3b-7b6c-4a69-a05b-d2be57fec482
Sec. 18-57. - Performance standards.
(a) The contractor shall give written notice to the director of public works or inspector of their intent to begin work at least two (2) business days prior to commencement of work. (b) The contractor shall comply with all requirements of the "Call Before You Dig" regulations of the State of Connecticut. (c) Excavations shall be made in open cut. Requests for tunneling require the public works director's special permission and under such additional conditions as he/she may impose. All excavated material shall be compactly piled and shall not interfere with public travel to any greater extent than necessary. (d) Trench box and/or sheeting shall be utilized as required by Occupational Safety and Health Administration (OSHA) regulations to maintain safe working conditions in and around the area of the excavation and additionally as directed by the director of public works or their appointed representative to protect the roadway or adjacent properties. (e) During the progress of the work, the contractor shall conduct his/her operations and maintain the area of his activities so as to minimize the creation of and dispersion of dust. It may be necessary to use sprinkling or sweeping of streets or application of calcium chloride for effective dust control; the city inspector may require such measures during the course of construction. (f) Blasting shall be performed by persons qualified to do so by the State of Connecticut only after obtaining a permit from the fire marshal. All blasting shall be conducted with all possible care to avoid injury to persons and property. Blasting shall be done only with such quantities and strengths of explosives and in such manner as will break the rock to approximately the intended line and grade. Care should be taken to prevent injury to existing pipes or other structures or property above ground or below ground. The rock shall be covered with mats where required so as to prevent damage or injury to property or persons. Sufficient warning shall be given to all persons in the vicinity of the work before a charge is exploded. (g) All excavations shall be dewatered as necessary to maintain a dry work environment. Discharge locations for dewatering equipment shall be approved by the city inspector with measures employed to prevent erosion and siltation. (h) The contractor shall notify the director of public works or city inspector as required and set forth in the permit. The contractor shall not close any work until the inspector has inspected and approved each phase of the work, as necessary. (i) The pavement surface shall be disrupted only within the area requiring excavation. (j) Where an excavation involves or affects a public sidewalk, the adjacent street may not be excavated concurrently. Where a sidewalk is excavated or impeded by any such work, a temporary sidewalk shall be constructed or provided which shall be safe for pedestrian travel and convenient for users, and which shall be barricaded and otherwise protected from vehicular traffic. Where a portion of any street other than the sidewalk is excavated, the sidewalk must be made safe and passable. (k) The area to be excavated shall be saw-cut in a clean straight line with ninety-degree angles at the point of intersection. (l) All edges shall have a clean vertical face. Any structures within the construction site shall be leveled to the adjacent surfaces. (m) The permittee shall backfill and compact all excavations. Backfilling materials and methods shall conform to standard detail regulations as established and promulgated by the city. All shall be backfilled and compacted, or suitably covered to the satisfaction of the director of public works or city inspector at the end of each workday, unless suitable alternatives have been approved by the director of public works or the city inspector. (n) Temporary patching shall be provided immediately upon backfilling and closing of the excavation opening. Temporary patch materials and methods shall conform to standard detail regulations as established and promulgated by the city under this article. (o) The permittee shall be responsible for the cost of repairs due to settlement or use of improper backfill material or defective work. Improper backfill shall be re-excavated and temporarily patched in accordance with this article's provisions. (p) If a temporary or permanent patch fails within one year of completion, the permittee will be notified and will repair the same within twenty-four (24) hours of notification. Upon failure to comply with this provision, the director of public works or their appointed representative may direct the repair to be done and will bill the permittee. The permittee shall be liable for the full expense of such work, and such expense to be paid within forty-five (45) days of billing. Delinquent payments will be charged against the surety bond. (q) Any opening or excavation made without a permit shall be immediately filled and temporarily patched, and a permit immediately obtained. If a permit is unobtainable, the city or its contract representative shall permanently patch such temporary opening or excavation in accordance with this article's provisions. The person making such excavation, and the property owner on whose behalf such excavation is made, shall be liable for the full cost thereof, plus the costs provided for in section 18-54. Penalties for violations of this article may be assessed in accordance with section 18-60. (r) If no work is performed, all permits shall be voided within three (3) months of issuance. If a permit is voided, the permit fee that is included in the portion of the Code that contains all fees shall be forfeited.
(Ord. No. 06-15-15-2, § 1)
Ask a question about New London law
Corpus searches the New London sections it holds and shows the ones that match, with their citations. Free, no sign-in.