Sec. 19-24.2. - Same—Improvement procedure.

The posting of a surety or cash bond covering the cost of construction of all improvements required by these regulations and included in the submissions of final subdivision plans shall be a condition for the approval of subdivision plans requiring physical improvements. However, any subdivider who desires to proceed with the immediate construction of required improvements without posting a surety or cash bond may do so, providing the procedure outlined in section 19-24.2(8) is followed. (1) Bonding company. Surety bonds submitted to the commission as provided herein shall be accepted by the commission only if said surety bonds have been issued by a bonding company licensed to do business in the State of Connecticut. Surety or cash bonds shall be conditioned upon the completion, within one year from the date of approval of the final subdivision plan, of all improvements shown on said plan. Form, sufficiency and manner of execution of either cash or surety bonds shall be approved by the corporation counsel's office prior to acceptance by the commission, and any such bond shall not expire without written approval of the commission upon satisfactory completion of improvements. (2) Modification of improvements. If at any time during the construction of the required improvements unforeseen conditions make it necessary or preferable to modify the location or design of such required improvements, the subdivider shall notify the commission or its duly authorized representative, who shall either approve or disapprove the subdivider's request subject to the approval of the director of public works. If the subdivider does not or cannot notify the commission beforehand, he may, at his own risk, proceed with such modifications, provided that such modifications are within the spirit and intent of the commission's approval of the subdivision plan, and subject to commission ratification at a later date. Such representative, when issuing an authorization under this section, shall notify the commission at its next regular meeting, and such action shall be incorporated into the official minutes. (3) Inspection of improvements. The commission shall request the director of public works to have inspections made to assure that all specifications and requirements are met during the construction of any required improvement which the commission feels should be inspected. Such inspection should be performed while said improvements are in the process of construction. It shall be the duty of the subdivider to notify the secretary of the commission at least 48 hours prior to the time when such improvements are to commence and when they are to be completed. Said director of public works shall, after completion of construction, certify to the commission that all required improvements have been constructed as required by the commission. In addition, the subdivider shall furnish a set of "as built" engineering drawings in accordance with section 19-24.2(9), herein. (4) Inspection of streets. In the case of any new street or change in any existing street, the work shall be inspected at the following stages of construction: (a) After necessary erosion and sediment control measures are implemented; (b) After completion of rough grading; (c) After drainage and all other underground facilities, when applicable, have been installed, but prior to backfilling; and (d) After completion of gravel base course. The subdivider shall not proceed to work on any stage subsequent to stage A above, until such inspection shall have been made and until the preceding stage has been approved by the director of public works. (5) Additional improvement work. If, during the course of construction of any new street or any other improvements required by the commission in connection with the approval of the subdivision plan, it shall appear that additional work is required owing to unforeseen conditions, such as, but not limited to, springs, ancient drains, wetlands, watercourses, side-hill drainage from cuts, bedrock, or other conditions which were not apparent at the time of the approval by the commission, the commission may require such additional work to be done and may require additional surety. (6) Bond reduction. When any divisible portion of the required improvements has been satisfactorily completed, the subdivider may apply for a reduction in the amount of the bond, which reduction may be granted by the commission when written certification from the director of public works has been received that the pertinent requirements of these subdivision regulations have been fully satisfied. For each requested reduction after the second one, there shall be an application fee of $25.00 to defray costs incurred by the city to process such requests. (7) Proper installation of improvements. If the director of public works (as provided in section 19-24.2(3) of these regulations) shall find, upon inspection of the improvements performed before the expiration date of the surety bond, that any of the required improvements have not been constructed in accordance with plans and specifications submitted by the subdivider as part of the subdivision plan, said director of public works shall so report to the commission. The commission shall then notify the subdivider and, if necessary, the bonding company and take all necessary steps to preserve the city's rights under the terms of the surety bond. (8) Immediate construction of improvements. Any applicant who desires to proceed with the immediate construction of improvements instead of posting a surety bond shall comply with the following procedures. He shall submit to the commission, in writing, a request that the deadline for commission action be extended for one year from the date of official submission of the subdivision plan, stating therein his desire to proceed forthwith with the construction of the required improvements and stating his intention to comply with the erosion and sediment control requirements established in section 19-27.11 of these regulations prior to construction (erosion and sediment control requirements include posting a bond for said erosion and sediment control measures), and stating his intention to conform with the final subdivision plan improvements, as approved by the commission, and stating that he will comply with the requirements in these regulations pertaining to the inspection of improvements and that he will comply with the design and construction standards specified in the regulations, and that upon completion of the work he will submit "as built" engineering drawings in accordance with section 19-24.2(9) herein. The commission may thereupon approve said one-year extension of the deadline for action on the application, and upon approval of the final subdivision plan improvements, as proposed by the subdivider, that construction of required improvements only may proceed, but no lots shall be sold until said procedure as required by these regulations is followed and all required materials are received by the commission. (9) "As built" improvements. Upon completion of the work the subdivider shall submit to the commission "as built" engineering drawings of all improvements actually constructed. Said drawings shall be certified by a civil engineer registered in the State of Connecticut, shall be drawn on reproducible material and shall show all improvements in the same detail as required for the approved subdivision plan including, but not limited to, the following: (a) The final plans and profiles of all streets and utilities; (b) The exact location of all storm drainage facilities with the existing inverts and top of frames; (c) The invert elevations of manholes, the "as-built" grades, the wyes, chimneys and/or laterals, ties to cleanouts if installed and any other pertinent information required by the city engineer for all sanitary sewers; (d) The location of all monuments as installed; (e) As-built plans shall make use of final plans as a base. Where changes occur, revised material shall be shown and voided material crossed out. Any unauthorized changes shall require additional work by the contractor at his own expense. In no case shall a street be accepted until as-built drawings are received and found to be acceptable; and (f) Unauthorized changes shown on as-built plans are limited as follows: Grades shall not change by more than 0.2 foot; catchbasins shall be within ten feet of proposed locations and curbs shall be within 0.5 foot of proposed location. Drives shall have a minimum width of ten feet with flares meeting the requirements of standard ramps. Where changes in excess of these amounts occur, the commission shall require reconstruction upon receipt of a written report from the director of public works indicating they would produce a detrimental result. (10) Responsibility of surety. If the required improvements have not been completed within the required time, the commission shall put the surety on notice that it is the responsibility of the surety to complete the required improvements. The commission shall set a reasonable time for completion upon failure of which the required work may be completed by the city and the surety required to pay for same. The commission shall see to it that improvements are completed as soon as practicable.

(Ord. No. 626, § 4.3, 7-10-72; Ord. No. 801, 12-2-75; Ord. No. 946, 2-4-80; Ord. No. 948, 3-3-80; Ord. No. 1054, §§ A, B, 5-6-85)