For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-27.11 — Soil erosion and sediment control plan

Code of Ordinances of the City of Norwich, Connecticut (Codified through Ordinance No. 1871, enacted April 21, 2025. (Supp. No. 26)) · Norwich Code of Ordinances § 19-27.11

Corpus is an independent public-information project, not the official City of Norwich website. Stable reference: corpuslaw.us/code/de01c74e-6bcc-4b33-a230-130abf4ffcc5

Sec. 19-27.11. - Soil erosion and sediment control plan.

(1) A soil erosion and sediment control plan shall be submitted for any development when the disturbed area of such development is cumulatively more than one-half acre. (2) Exemptions. A lot proposed to be developed for a single-family dwelling that is not part of a subdivision of land shall be exempt; this exemption is applicable to the land being disturbed solely for the dwelling and necessary amenities such as a septic system. (3) A soil erosion and sediment control plan shall be submitted to and certified by the commission on the city plan or its designated agent. A designated agent shall be an official from the engineering or planning departments. If the development of the lots within the proposed subdivision are not to be developed by the developer of the subdivision, a soil erosion and sediment control plan shall be submitted prior to the issuance of the building permit by the developer of the lot. It shall be noted on the subdivision plan that the developer of each lot shall submit and have certified by the designated agent of the commission a soil erosion and sediment control plan. In all other cases and for all other soil and erosion control measures for the subdivision, i.e., for street construction, said soil erosion and sediment control plan shall be submitted and shall be certified by the commission. (4) To be eligible for certification, a soil erosion and sediment control plan shall contain proper provisions to adequately control accelerated erosion and sedimentation and reduce the danger from stormwater runoff on the proposed site based on the best available technology. Such principles, methods and practices necessary for certification are found in the current Connecticut Guidelines for Soil Erosion and Sediment Control, as amended. Alternative principles, methods and practices may be used with approval of the commission or its designated agent. (5) Said soil erosion and sediment control plan shall include, but not be limited to, the following: (a) A narrative describing: 1. The development; 2. The schedule for grading and construction activities including: a. Start and completion dates; b. Sequence of grading and construction activities; c. Sequence for installation and/or application of soil erosion and sediment control measures; d. Sequence for final stabilization of the project site; 3. The design criteria for proposed erosion and sediment control measures and stormwater management facilities; 4. The construction details for the proposed soil erosion and sediment control measures (and stormwater management facilities); 5. The operations and maintenance program for proposed soil erosion and sediment control measures (and stormwater management facilities). (b) A site plan map at a sufficient scale (1:40) to show: 1. Location of the proposed development and adjacent properties; 2. The existing and proposed topographic conditions including soil types, wetlands, watercourses and water bodies; 3. The existing structures on the project site, if any; 4. The proposed area of alterations, including cleared, excavated, filled or graded areas and proposed structures, utilities, roads and, if applicable, new property lines; 5. Location of and design details for all proposed soil erosion and sediment control measures (and stormwater management facilities); 6. The sequence of grading and construction activities; 7. The sequence for installation and/or application of soil erosion control measures; 8. The sequence for final stabilization of the development site. (c) Any other information deemed necessary and appropriate by the commission or designated agent. (6) Minimum acceptable standards. (a) Plans for soil erosion and sediment control shall be developed in accordance with these regulations using the principles as outlined in chapters 3 and 4 of the current Connecticut Guidelines for Soil Erosion and Sediment Control, as amended. Soil erosion and sediment control plans shall result in a development that: 1. Minimizes erosion and sedimentation during construction; 2. Is stabilized and protected from erosion when completed; 3. Does not cause off-site erosion and/or sedimentation. (b) The minimum standards for individual measures are those in the current Connecticut Guidelines for Soil Erosion and Sediment Control, as amended. The commission on the city plan may grant exceptions when requested by the applicant if technically sound reasons are presented. (c) The appropriate methods from chapter 9 of the current Connecticut Guidelines for Soil Erosion and Sediment Control, as amended, shall be used in determining peak flow rates and volumes of runoff unless an alternative method is approved by the commission on the city plan. (7) Issuance or denial of certification. (a) The commission on the city plan shall either certify that the soil erosion and sediment control plan, as filed, complies with the requirements and objectives of this regulation or deny certification when the development proposal does not comply with these regulations. (b) Nothing in these regulations shall be construed as extending the time limits for the approval of any application under G.S. chs. 124, 124A or 126. (c) Prior to certification, any plan submitted to the municipality may be reviewed by the county soil and water conservation district which may make recommendations concerning such plan, provided such review shall be completed within 30 days of the receipt of such plan. (d) The commission may forward a copy of the development proposal to the conservation commission or other review agency or consultant for review and comment. (8) Conditions relating to soil erosion and sediment control. (a) The estimated costs of measures required to control soil erosion and sedimentation, as specified in the certified plan, may be covered in a performance bond or other assurance acceptable to the commission. (b) Site development shall not begin unless the soil erosion and sediment control plan is certified and those control measures and facilities in the plan scheduled for installation prior to site development are installed and functional. (c) Planned soil erosion and sediment control measures and facilities shall be installed as scheduled according to the certified plan. (d) All control measures and facilities shall be maintained in effective condition to ensure the compliance of the certified plan. (9) Inspection. Inspections shall be made by designated agent(s) during development to ensure compliance with the certified plan and that control measures and facilities are properly performed or installed and maintained. The commission may require the permittee to verify through progress reports that soil erosion and sediment control measures and facilities have been performed or installed according to the certified plan and are being operated and maintained.

(Ord. No. 1054, § E, 5-6-85)

Ask a question about Norwich law

Corpus searches the Norwich sections it holds and shows the ones that match, with their citations. Free, no sign-in.