§ 19-27.5 — Same—Storm drainage
Code of Ordinances of the City of Norwich, Connecticut (Codified through Ordinance No. 1871, enacted April 21, 2025. (Supp. No. 26)) · Norwich Code of Ordinances § 19-27.5
Corpus is an independent public-information project, not the official City of Norwich website. Stable reference: corpuslaw.us/code/26850f85-b6c6-4db4-9a61-408a08505b77
Sec. 19-27.5. - Same—Storm drainage.
Adequate surface and subsurface storm drainage facilities shall be installed within the subdivision by the subdivider to carry existing watercourses and to drain the proposed streets and streets which may reasonably be expected to be constructed at some future date on adjoining property which normally drains across the area of the proposed subdivision, and to suit the existing conditions of grade, runoff, drainage area and discharge. No natural watercourses shall be altered or obstructed in such a way as to reduce natural runoff capacity of surface water unless substitute means of runoff are provided. No storm drainage facilities shall be constructed unless the design of such facilities has been approved by the director of public works. (1) Design. All storm drainage facilities shall be designed and constructed in accordance with pertinent specifications of the department of public works and of the Connecticut Highway Department. (2) Pipe size. All storm sewer pipe sizes are to be determined by actual design with due consideration to the avoidance of problems which may arise from the concentration of stormwater runoff from or onto adjacent development or undeveloped properties in the drainage area whether on-site or off-site. The minimum size of storm drains shall be 12 inches. (3) Slope. The minimum slope for storm sewers shall be sufficient to give a mean velocity of three feet per second when pipe is flowing half full. The maximum slope for storm sewers shall be designed to give a mean velocity of not exceeding 15 feet per second when pipe is flowing half full. (4) Catchbasins. Catchbasins shall be constructed at all changes of pipe sizes. Unless otherwise authorized by the director of public works, no gutter shall run for more than 350 feet without provision for removal of water by a curb-inlet catchbasin, leadoff or other approved method. On slopes of less than five percent closer spacing of catchbasins may be required. (5) Underdrains. Where excessive ground water or watercourses or wetlands are encountered in the roadway, the city engineer may require that suitable underdrains be installed and connected to the nearest drainage facility for that portion of land involved in the subdivision. (6) Cover. No drainage main shall be constructed with less than three feet cover, except that where it is impossible to obtain the required depth, the method of construction shall be approved by the city engineer. (7) Existing streets. Where a subdivision abuts an existing city street, or where the tract of land to be subdivided presently receives stormwater drainage from an existing city street or from a watercourse, it shall be the responsibility of the subdivider to provide by piping, an adequate stormwater drainage system suitable to give the existing city street and the proposed subdivision proper drainage. If the city anticipates future development that will increase the drainage flow on the city street, it shall pay the increase in cost of installing drainage capacity in the subdivision exceeding requirements present at the time of approval of the subdivision plans. However, if, in the judgment of the city engineer, such increased drainage capacity directly benefits the subdivider, then the cost of such increase in capacity shall be borne by both the city and the subdivider in proportion to the benefits. (8) Discharge. The discharge of all stormwater from the subdivision shall be into suitable streams or rivers or into storm sewers, ditches, or other city drainage facilities with adequate capacity to carry the additional water. Where the discharge shall be onto private property adjoining the proposed subdivision, proper easements and discharge rights shall be secured by the subdivider for the city, and any pipe so installed shall extend a minimum distance as required by the director of public works after all conditions have been considered. (9) Easements. Easements, at least 20 feet in width, shall be provided by the subdivider for all sewer, water and gas pipes and power lines that are not to be installed in a street. Easements shall also be provided for the full width of the channel of any stream or drainage ditch in the subdivision which will carry drainage runoff from any proposed street, existing street or streets which may be constructed in the future on the undeveloped land within the watershed. Easements shall also be provided for stormwater pipes that may need to be installed in the future to serve undeveloped land within the watershed that normally drains across the area of the proposed subdivision. (10) Combined sewers. No combined sanitary and storm sewers shall be permitted. (11) [Requirement to install drainage.] When a subdivision is to be constructed in sections, the developer may be required to install drainage in future sections to provide outlets for drainage, groundwater, roof drains and other problems created in the first section to be developed. Temporary rights may be required until future sections are developed.
(Ord. No. 626, § 7.6, 7-10-72; Ord. No. 801, 12-2-75)
Ask a question about Norwich law
Corpus searches the Norwich sections it holds and shows the ones that match, with their citations. Free, no sign-in.
