§ 230-14 — C-3 Highway Commercial District
City Code of the City of Milford, Delaware (Supplement 29 Update 1 (2025-01-27)) · Milford City Code § 230-14
Corpus is an independent public-information project, not the official City of Milford website. Stable reference: corpuslaw.us/code/6adca1a9-7568-45c9-a924-7704d11968c1
§ 230-14. - C-3 Highway Commercial District.
In a C-3 District no building or premises shall be used and no building shall be erected or altered which is arranged, intended or designed to be used except for one or more of the following uses and complying with the requirements so indicated. A. Purpose. The purpose of the C-3 District is to provide for larger-scale commercial uses that may require large amounts of parking space or have a high traffic impact. These uses generally require locations on major arterial routes and serve both local and regional customers. B. Permitted uses. Permitted uses for the C-3 District shall be as follows: (1) Those permitted uses in the C-2 District. (2) Warehouses. (3) Large retail outlets. (4) Indoor storage accessory building. (5) Fast-food restaurants and drive-in restaurants. (6) Supermarkets. (7) Truck and trailer rentals. (8) Roadside produce market. (9) Outdoor commercial recreational facilities, not motorized vehicles. (10) Swimming club. (11) Indoor facility for amusement or assembly. (12) Bus station. (13) Motels or hotels. (14) Commercial greenhouse. (15) Wholesale establishment. (16) Contractors', craftsmen's or general service shops, including welding and similar shops. (17) Laboratory, testing and research. (18) Car wash. (19) Registered Compassion Center Dispensary. C. Conditional uses subject to special requirements. All uses specified as conditional uses in the C-2 zoning district and the following uses are permitted subject to receiving a conditional use permit by the City Council as provided in Article IX of this chapter: (1) Automotive sales. (2) Automotive repair, subject to the following special requirements: (a) All facilities shall be located and all services shall be conducted on the lot. (b) All repair work shall be conducted within an entirely enclosed building. (c) No equipment for the service of gasoline or oil shall be placed closer to any street or property line than 20 feet. (d) No portion of such structure or its equipment shall be located within 500 feet of the premises of any school, hospital, church or public recreation building. (e) No service station shall be located within 800 feet of another service station on the same side of the street within the same block. (f) Any such use shall be permitted only where it is determined that it will not materially interfere with the main pedestrian movement in conjunction with a compact retail area. (3) Shopping center, subject to the following site requirements: (a) Traffic and parking. [1] The minimum distance between accessways and a residential district shall be 50 feet. [2] Spacing of accessway. [a] From adjoining property: 50 feet. [b] From minor intersections: 50 feet. [c] From major intersections: 100 to 150 feet. (b) Setback. [1] From nonresidential districts: 15 feet. [2] From residential districts: 100 feet. (4) All uses permitted in the R-3 Zoning District subject to its area regulations. (5) Business, commercial or industrial uses that do not adversely affect neighboring properties. (6) Aquarium. (7) Community energy generating facility. (a) The footprint of the solar array, as defined as the by the outer limit of the panels and exclusive of buffers shall be no larger than 50 acres in size. (b) No more than one Community Solar Energy Facility (SEF) shall be permitted on a parcel. All separate parcels in existence on June 1, 2023, shall be considered original parcels. Future subdivision of an original parcel shall not enable the development of additional Community Solar Energy Facilities. (c) Facility location and siting shall be in accordance with the requirements of Title 26 Public Utilities of the Delaware Administrative Code, 3001 (Rules for Certification and Regulation of Electric Suppliers) as amended. (d) Setbacks for the Facility shall be: [1] Front setback shall be 75 feet. [2] Side setback shall be 50 feet. [3] Rear setback shall be 50 feet. [4] Distance from any off-site dwelling unit shall be 100 feet. [5] Distance from any State recognized Scenic Byway shall be 150 feet. [6] Distance from any wetlands shall be 100 feet. (e) The site area shall be planted to achieve a minimum six-foot high four-season visual barrier in accordance with the following guidelines: [1] Include a variety of native evergreen trees. Existing native vegetation may be used to achieve the required planted buffer. [2] A minimum of two rows shall be installed and trees shall be planted in staggered rows. Plantings shall be placed at maximum 20 feet apart within the same row and 10 feet apart from the adjacent, staggered row. [3] Include groundcover to minimize growth of invasive species or provide a mowing schedule until the area is fully established in a natural condition. [4] The buffer shall be maintained to prevent disease from spreading and any trees that don't survive shall be replaced. [5] A raised berm with a 1:4 side slope and flat top may be used to achieve minimum height at planting. (f) The required buffer may be counted toward planting requirements included in this Chapter. (g) If topsoil is removed for improvements, it shall remain on the site. (h) Noninvasive, perennial vegetative ground cover must be maintained or established in all areas containing solar arrays and in required setbacks to prevent erosion and manage run-off. A seed mix will be used to promote the growth of a ground cover that is favorable to future use of the land by animals. The height of the vegetation growth shall be maintained as to reduce the possibility of the airborne spreading of weeds and seeds transmitted to other adjacent lands. (i) A soils study establishing the presence of any contaminants shall be completed prior to construction and every five years thereafter. Surface Soil samples shall be collected from the first six inches of soil. One composite sample shall be collected every 5 acres of SEF footprint. The composite sample should be a maximum of 10 aliquots collected from evenly spaced locations throughout the 5-acre footprint. A baseline sample shall be collected prior to the start of the SEF construction. The composite sample should be analyzed for the primary component of the installed solar panel via the prevailing EPA method for Inorganic Compounds. A letter report of findings shall be submitted within 45 days from receipt of the laboratory results to the City and shall include a summary table showing current and past results and the original certified laboratory results. A sketch showing the sample locations should be provided with the letter report. The full report shall be kept on file by the applicant and available for review by the City. If contaminate levels appear to exceed the baseline, the City will forward the report to DNREC to determine appropriate mitigation measures. If the 5 year and 10 year tests do not show material increase in the metal constituents tested, then testing interval may be extended to every 10 years. (j) Signage, not to exceed six square feet, identifying the operator, its contact numbers, 911 address and emergency contact information shall be posted at each entrance or exit of the property. (k) Abandonment. A Community Energy Generating Facility that does not produce energy for a continuous period of one year or more shall be presumed to have been abandoned. The Applicant may request a Good Cause Exemption that may not be unreasonably withheld so long as all Real Estate and Personal Property Taxes are in Good Standing. Any Facility that has been abandoned without attaining a Good Cause Exemption must be decommissioned and removed within 180 days. Decommissioning must consist of: [1] Physical removal of all solar photovoltaic facilities, structures, equipment, security barriers and transmission lines from the site. [2] Recycling or disposal of all solid and hazardous waste in accordance with local, state, and federal regulations. [3] Stabilization or re-vegetation of the site as necessary to minimize erosion. The Planning Director is authorized to allow the owner or operator to leave landscaping or designated below-grade foundations in place in order to minimize erosion and disruption to vegetation and/or agriculture. (l) Decommissioning plan. [1] A decommissioning plan outlining the anticipated means and costs of removing the solar facility must be submitted, with the application. [2] The decommissioning plan should ensure that the owner or operator properly removes the equipment and facilities upon the end of project life or after their useful life. The plan must include provisions for the removal of all structures and foundations, the removal of all electrical transmission components and the restoration of soil and vegetation. [3] The owner/operator must provide a present-day decommissioning cost estimate and identify the parties responsible for decommissioning. (m) Financial Assurance. The operator or property owner shall provide a bond, surety, letter of credit, or other financial assurance in a form and amount acceptable to the Department to secure payment of 100% of the anticipated cost of removal of all associated site improvements and restoration of the site to its pre-development condition. The financial assurance shall remain in full force and effect as long as the solar Facility remains in place. The financial assurance shall be reviewed and renewed every five years to ensure the amount reflects the current market. (8) Energy system utility scale solar & wind. (a) The following are conditions specific to Solar Facilities: [1] Setbacks for a Solar facility shall be: [a] Front setback shall be 100 feet. [b] Side setback shall be 75 feet. [c] Rear setback shall be 75 feet. [d] Distance from any off-site dwelling unit shall be 100 feet. [e] Distance from any State recognized Scenic Byway shall be 150 feet. [f] Distance from any wetlands shall be 100 feet. [2] The required setback shall be planted to achieve a minimum six-foot high four-season visual barrier in accordance with the following guidelines: [a] Include a variety of native evergreen trees. Existing native vegetation may be used to achieve the required planted buffer. [b] A minimum of two rows shall be installed and trees shall be planted in staggered rows. Plantings shall be placed at maximum 20 feet apart within the same row and 10 feet apart from the adjacent, staggered row. [c] Include groundcover to minimize growth of invasive species or provide a mowing schedule until the area is fully established in a natural condition. [d] The buffer shall be maintained to prevent disease from spreading and any trees that don't survive shall be replaced. [e] A raised berm with a 1:4 side slope and flat top may be used to achieve minimum height at planting. [3] A soils study establishing the presence of any contaminants shall be completed prior to construction and every five years thereafter. Surface Soil samples shall be collected from the first six inches of soil. One composite sample shall be collected every 5 acres of SEF footprint. The composite sample should be a maximum of 10 aliquots collected from evenly spaced locations throughout the 5-acre footprint. A baseline sample shall be collected prior to the start of the SEF construction. The composite sample should be analyzed for the primary component of the installed solar panel via the prevailing EPA method for Inorganic Compounds. A letter report of findings shall be submitted within 45 days from receipt of the laboratory results to the City and shall include a summary table showing current and past results and the original certified laboratory results. A sketch showing the sample locations should be provided with the letter report. The full report shall be kept on file by the applicant and available for review by the City. If contaminate levels appear to exceed the baseline, the City will forward the report to DNREC to determine appropriate mitigation measures. If the 5 year and 10 year tests do not show material increase in the metal constituents tested, then testing interval may be extended to every 10 years. [4] Signage, not to exceed six square feet, identifying the operator, its contact numbers, 911 address and emergency contact information shall be posted at each entrance or exit of the property. (b) The following are conditions specific to Wind Facilities: [1] Setbacks for a Wind Facility shall be: [a] Front setback shall be 800 feet. [b] Side setback shall be 800 feet. [c] Rear setback shall be 800 feet. [d] Distance from any off-site dwelling unit shall be 1,000 feet. [e] Distance from any State recognized Scenic Byway shall be 800 feet. [f] Distance from any wetlands shall be 100 feet. [2] No climbing pegs or tower ladders shall be located closer than 12 feet to the ground level at the base of the structure for freestanding single poles. [3] The facility shall be designed to prevent unauthorized external access to electrical and mechanical components and shall have access doors that are kept securely locked. [4] All access roads shall be gated and locked. [5] All power transmission lines from the tower to any other building or other structure shall be located underground to the maximum extent practical. [6] No tower shall be lit except to comply with Federal Aviation Administration requirements. Minimum-security lighting for ground level facilities shall be allowed as approved on the site plan. Security lighting shall be designed to minimize light pollution, including the use of light hoods, low-glare fixtures, and directing lights at the ground. [7] All structures in a project shall be finished in a single, non-reflective, matte color or a camouflage scheme. [8] Signs. [a] No advertising signs are allowed on any part of the WECS, including fencing and support structures. [b] No lettering, company insignia, advertising, or graphics shall be on any part of the tower, hub, or blades. [c] Appropriate warning signs shall be posted. At least one sign shall be posted at the base of the tower warning of electrical shock or high voltage. A sign shall be posted on the entry area of the fence around each tower or group of towers and any building (or on the tower or building if there is no fence) containing emergency contact information, 911 address, including a local telephone number with 24-hour, 7-days-a-week coverage. The City may require additional signs based on safety needs. [9] Noise level shall not exceed 50 dBA, including constructive interference at existing off-site residences, businesses, and public buildings. (c) The following are conditions required for all Utility Solar and Wind Energy Facilities [1] Required buffers may be counted toward planting requirements included in this Chapter. [2] If topsoil is removed for improvements, it shall remain on the site. [3] Noninvasive, perennial vegetative ground cover must be maintained or established in all areas containing solar arrays and in required setbacks to prevent erosion and manage run-off. A seed mix will be used to promote the growth of a ground cover that is favorable to future use of the land by animals. The height of the vegetation growth shall be maintained as to reduce the possibility of the airborne spreading of weeds and seeds transmitted to other adjacent lands. [4] Abandonment. A Utility Solar or Wind Facility that does not produce energy for a continuous period of one year or more shall be presumed to have been abandoned. The Applicant may request a Good Cause Exemption that may not be unreasonably withheld so long as all Real Estate and Personal Property Taxes are in Good Standing. Any Utility Solar Facility that has been abandoned without attaining a Good Cause Exemption must be decommissioned and removed within 180 days. Decommissioning must consist of: [a] Physical removal of all solar photovoltaic facilities, wind turbines, structures, equipment, security barriers and transmission lines from the site. [b] Recycling or disposal of all solid and hazardous waste in accordance with local, state, and federal regulations. [c] Stabilization or re-vegetation of the site as necessary to minimize erosion. The Planning Director is authorized to allow the owner or operator to leave landscaping or designated below-grade foundations in place in order to minimize erosion and disruption to vegetation. [5] Decommissioning plan. [a] A decommissioning plan outlining the anticipated means and costs of removing the facility must be submitted, with the application. [b] The decommissioning plan should ensure that the owner or operator properly removes the equipment and facilities upon the end of project life or after their useful life. The plan must include provisions for the removal of all structures and foundations, the removal of all electrical transmission components and the restoration of soil and vegetation and/or agriculture. [c] The owner/operator must provide a present-day decommissioning cost estimate and identify the parties responsible for decommissioning. [6] Financial Assurance. Prior to final plan approval, the operator or property owner shall provide a bond, surety, letter of credit, or other financial assurance in a form and amount acceptable to the Department to secure payment of 100% of the anticipated cost of removal of all associated site improvements and restoration of the site to its pre-development condition. The financial assurance shall remain in full force and effect as long as the facility remains in place. The financial assurance shall be reviewed and renewed every five years to ensure the amount reflects the current market. (9) Emergency shelter facility. (a) The lot on which an emergency shelter facility is located shall not be within 500 feet of a lot on which another emergency shelter facility or group home is located. (b) All state licenses and permits for such a facility have been obtained. D. Area regulations. (1) Minimum lot area shall be one acre. (2) Maximum lot coverage shall be 80%. (3) Minimum lot width shall be as follows: for an interior lot 150 feet and for a corner lot 170 feet. (4) Height of buildings shall not exceed 35 feet, with the following exception: a motel, hotel, or aquarium may be erected to a height not exceeding 60 feet. (5) Minimum front yard setback shall be 30 feet. (6) Side yards shall be provided as follows: each lot shall have two side yards a minimum of 20 feet with a minimum aggregate width of two side yards of 50 feet. (7) Minimum rear yard shall be 50 feet. (8) Parking shall comply with the requirements provided in Article IV of this chapter. (9) Landscape screening shall comply with the requirements provided in Article V of this chapter. (10) Signs shall comply with the requirements provided in Article VI of this chapter. (11) Accessory structures in aggregate shall occupy no more than 30 percent of the required rear and side yard of the lot area and may not dominate in area, extent or purpose to the principal use or structure. The area of the principal structure shall be calculated using the definition of floor area in this chapter. (12) Accessory structures shall be located in the side and rear lot areas. (13) Accessory structures for residential uses shall be located at least 5 feet from the rear lot line and at least 5 feet from the side lot line and shall not be located less than 10 feet from a principal structure. (14) Accessory structures for non-residential uses shall meet the principal use setbacks and shall not be located less than 5 feet from a principal structure.
[Ord. No. 2022-06, 1-24-2022; Ord. No. 2023-28, § 4, 8-14-2023; Ord. No. 2024-11, § 2, 1-13-2025)
Ask a question about Milford law
Corpus searches the Milford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
