For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 230-16 — I-1 Limited Industrial District

City Code of the City of Milford, Delaware (Supplement 29 Update 1 (2025-01-27)) · Milford City Code § 230-16

Corpus is an independent public-information project, not the official City of Milford website. Stable reference: corpuslaw.us/code/f7515cd7-8559-41f9-b590-0569ae2a3328

§ 230-16. - I-1 Limited Industrial District.

In an I-1 District no building/structure or premises shall be used and no building/structure or part thereof shall be erected or altered which is arranged, intended or designed to be used, in whole or in part, for any purpose except for one or more of the following uses and complying with the requirements herein indicated. A. The purpose of an I-1 Limited Industrial District shall be to provide locations for the development of light to moderate industrial manufacturing, warehousing, wholesale and limited research establishments which, because of their type and nature, would be compatible with or adjacent to residential areas. Also, the purpose is to provide guidelines and performance standards which will control and confine any offensive features (i.e., noise, vibration, heat, smoke, glare, dust, objectionable odors, toxic wastes or unsightly storage) to the confines of the premises and within enclosed buildings or within a visually enclosed space. B. Permitted uses. Permitted uses of the I-1 District shall be as follows: (1) All permitted uses of the OC-1 District and BP District. (2) Light manufacturing, assembling, converting, altering, finishing, baking, cooking or any other type of processing or storage of an industrial nature for the production and/or distribution of any goods, materials, products, instruments, appliances and devices, provided that the fuel or power supply shall be of an approved type. Also included shall be all incidental clinics, offices, cafeterias and recreational facilities for the exclusive use of in-house staff and employees. Accessory retail storefront/gift shop is permitted for products that are manufactured on site. The area for this use must be incidental and subordinate to the manufacturing use and must meet all commercial building code requirements for the use. (NAICS Reference - 313: Textile Mills; 314: Textile Product Mills; 315: Apparel Manufacturing; 316: Leather and Allied Product Manufacturing (except 3161 {Hazardous}); 323: Printing and Related Support Activities; 326: Plastics and Rubber Products Manufacturing (except tires 32621{Hazardous}); 3271: Clay Product and Refractory Manufacturing; 327991: Cut Stone and Stone Product Manufacturing; 3322: Cutlery and Handtool Manufacturing; 3323: Architectural and Structural Metals Manufacturing; 3324: Boiler, Tank, and Shipping Container Manufacturing; 3325: Hardware Manufacturing; 3326: Spring and Wire Product Manufacturing; 3327: Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing; 3328: Coating, Engraving, Heat Treating, and Allied Activities; 33291: Metal Valve Manufacturing; 332991: Ball and Roller Bearing Manufacturing; 332996: Fabricated Pipe and Pipe Fitting Manufacturing; 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing; 3331: Agriculture, Construction, and Mining Machinery Manufacturing; 3332: Industrial Machinery Manufacturing; 333314: Optical Instrument and Lens Manufacturing; 333316: Photographic and Photocopying Equipment Manufacturing; 3335: Metalworking Machinery Manufacturing; 3336: Engine, Turbine, and Power Transmission Equipment Manufacturing; 3339: Other General Purpose Machinery Manufacturing (except 333913 {Hazardous}); 334: Computer and Electronic Product Manufacturing; 335: Electrical Equipment, Appliance, and Component Manufacturing; 337: Furniture and Related Product Manufacturing; 339: Miscellaneous Manufacturing) (3) Wholesale storage, warehousing and distribution centers. 49311: General Warehousing and Storage; 49312: Refrigerated Warehousing and Storage (except for farm products grown on site); 49319: Other Warehousing and Storage) C. Conditional uses. All uses specified as conditional uses in the OC-1 and BP zoning districts and the following uses are permitted in the I-1 District, in accordance with the provisions within Article IX of this chapter: (1) Mini-warehouses or public storage facilities. (2) Radio-television facilities. (3) Craft distillery and microbrewery establishments, provided that: (a) All permits and approvals required by the Delaware Alcoholic Beverage Commission are obtained and remain in full force and effect. (b) All aspects of the distilling or brewing process are completely confined within a building, including storage of all materials and finished products. (c) Such establishment offers the public, on a regular and continuing basis, various activities ancillary to its distilling and/or brewing process, including by way of example: tours of the premises, educational classes, demonstrations, tasting rooms, and retail sales areas limited to the sale of beer, mead, cider, or spirits brewed or distilled on the premises for consumption off-premises and other retail items. (d) On-site consumption or tasting associated with a craft distillery or microbrewery establishment shall be permitted. Any area associated with on-site consumption or tasting shall not operate as a stand-alone bar or tavern, shall be located on the premises of the craft distillery or microbrewery establishment, and shall be ancillary to the primary use. "Ancillary" for purposes of this section means subordinate, auxiliary, smaller and less intensive than the primary use. On-site consumption or tasting of alcohol shall be limited to those products brewed or distilled on the premises, except as otherwise permitted by Delaware Law. (e) All food sales shall be limited to prepackaged snack items or those food items prepared by a food establishment licensed by the State of Delaware. If a craft distillery or microbrewery intends to operate on its premises a food establishment that is otherwise a permitted use in this district (i.e. restaurant, café, or full-service restaurant), the City may require the property owner to provide the City with a letter of no objection from the Delaware Alcoholic Beverage Control Commissioner regarding the operation of a food establishment on the premises of a craft distillery or microbrewery. (f) Outdoor seating and gathering areas shall be permitted subject to the following requirements: [1] Permanent and temporary outdoor seating and gathering areas shall be subject to building permit application and approval requirements. [2] Outdoor seating and gathering areas and ancillary improvements shall include physical barriers from public rights-of-way and physical and visual barriers from adjoining properties. Physical barriers along public rights-of-way shall restrict access from the public rights-of-way to the outdoor seating and gathering areas and shall not exceed four feet in height. Barriers along adjoining property lines shall create a physical and visual barrier consisting of fencing six feet in height or vegetation at least six feet in height. The regulations herein shall be in addition to any regulations imposed by the State of Delaware. [3] Maximum occupancy and points of ingress/egress shall be clearly marked. Occupancy of outdoor seating and gathering areas shall not exceed one person per 15 square feet of the outdoor seating and gathering areas identified in the building plans or any other occupancy limit established by the Office of the State Fire Marshall. [4] All structures and uses related to outdoor seating and gathering areas and facilities are subject to the City of Milford Building Code and the City of Milford Zoning Code. [5] The occupancy of outdoor seating and gathering areas shall be included when calculating the building requirements and minimum parking standards required by the City of Milford and State of Delaware. Outdoor seating and gathering areas shall meet all requirements of the City of Milford and the State of Delaware. [6] Tables, chairs, umbrellas, equipment, games, and any other items provided in connection with outdoor seating and gathering areas shall be maintained in good repair and shall be secured during non-business hours in a safe and orderly manner. [7] Any licensing required by the Delaware Alcoholic Beverage Control Commissioner for outdoor seating and gathering areas shall be obtained. (4) Community energy generating facility. (a) The footprint of the solar array, as defined as the by the outer limit of the panels and exclusive of buffers shall be no larger than 50 acres in size. (b) No more than one Community Solar Energy Facility (SEF) shall be permitted on a parcel. All separate parcels in existence on June 1, 2023, shall be considered original parcels. Future subdivision of an original parcel shall not enable the development of additional Community Solar Energy Facilities. (c) Facility location and siting shall be in accordance with the requirements of Title 26 Public Utilities of the Delaware Administrative Code, 3001 (Rules for Certification and Regulation of Electric Suppliers) as amended. (d) Setbacks for the Facility shall be: [1] Front setback shall be 75 feet. [2] Side setback shall be 50 feet. [3] Rear setback shall be 50 feet. [4] Distance from any off-site dwelling unit shall be 100 feet. [5] Distance from any State recognized Scenic Byway shall be 150 feet. [6] Distance from any wetlands shall be 100 feet. (e) The site area shall be planted to achieve a minimum six (6) foot high four- season visual barrier in accordance with the following guidelines: [1] Include a variety of native evergreen trees. Existing native vegetation may be used to achieve the required planted buffer. [2] A minimum of two rows shall be installed and trees shall be planted in staggered rows. Plantings shall be placed at maximum 20 feet apart within the same row and 10 feet apart from the adjacent, staggered row. [3] Include groundcover to minimize growth of invasive species or provide a mowing schedule until the area is fully established in a natural condition. [4] The buffer shall be maintained to prevent disease from spreading and any trees that don't survive shall be replaced. [5] A raised berm with a 1:4 side slope and flat top may be used to achieve minimum height at planting. (f) The required buffer may be counted toward planting requirements included in this Chapter. (g) If topsoil is removed for improvements, it shall remain on the site. (h) Noninvasive, perennial vegetative ground cover must be maintained or established in all areas containing solar arrays and in required setbacks to prevent erosion and manage run-off. A seed mix will be used to promote the growth of a ground cover that is favorable to future use of the land by animals. The height of the vegetation growth shall be maintained as to reduce the possibility of the airborne spreading of weeds and seeds transmitted to other adjacent lands. (i) A soils study establishing the presence of any contaminants shall be completed prior to construction and every five years thereafter. Surface Soil samples shall be collected from the first six inches of soil. One composite sample shall be collected every 5 acres of SEF footprint. The composite sample should be a maximum of 10 aliquots collected from evenly spaced locations throughout the 5-acre footprint. A baseline sample shall be collected prior to the start of the SEF construction. The composite sample should be analyzed for the primary component of the installed solar panel via the prevailing EPA method for Inorganic Compounds. A letter report of findings shall be submitted within 45 days from receipt of the laboratory results to the City and shall include a summary table showing current and past results and the original certified laboratory results. A sketch showing the sample locations should be provided with the letter report. The full report shall be kept on file by the applicant and available for review by the City. If contaminate levels appear to exceed the baseline, the City will forward the report to DNREC to determine appropriate mitigation measures. If the 5 year and 10 year tests do not show material increase in the metal constituents tested, then testing interval may be extended to every 10 years. (j) Signage, not to exceed six square feet, identifying the operator, its contact numbers, 911 address and emergency contact information shall be posted at each entrance or exit of the property. (k) Abandonment. A Community Energy Generating Facility that does not produce energy for a continuous period of one year or more shall be presumed to have been abandoned. The Applicant may request a Good Cause Exemption that may not be unreasonably withheld so long as all Real Estate and Personal Property Taxes are in Good Standing. Any Facility that has been abandoned without attaining a Good Cause Exemption must be decommissioned and removed within 180 days. Decommissioning must consist of: [1] Physical removal of all solar photovoltaic facilities, structures, equipment, security barriers and transmission lines from the site. [2] Recycling or disposal of all solid and hazardous waste in accordance with local, state, and federal regulations. [3] Stabilization or re-vegetation of the site as necessary to minimize erosion. The Planning Director is authorized to allow the owner or operator to leave landscaping or designated below-grade foundations in place in order to minimize erosion and disruption to vegetation and/or agriculture. (l) Decommissioning plan. [1] A decommissioning plan outlining the anticipated means and costs of removing the solar facility must be submitted, with the application. [2] The decommissioning plan should ensure that the owner or operator properly removes the equipment and facilities upon the end of project life or after their useful life. The plan must include provisions for the removal of all structures and foundations, the removal of all electrical transmission components and the restoration of soil and vegetation. [3] The owner/operator must provide a present-day decommissioning cost estimate and identify the parties responsible for decommissioning. (m) Financial Assurance. The operator or property owner shall provide a bond, surety, letter of credit, or other financial assurance in a form and amount acceptable to the Department to secure payment of 100% of the anticipated cost of removal of all associated site improvements and restoration of the site to its pre-development condition. The financial assurance shall remain in full force and effect as long as the solar Facility remains in place. The financial assurance shall be reviewed and renewed every five years to ensure the amount reflects the current market. (5) Energy system utility scale solar & wind. (a) The following are conditions specific to Solar Facilities: [1] Setbacks for a Solar facility shall be: [a] Front setback shall be 100 feet. [b] Side setback shall be 75 feet. [c] Rear setback shall be 75 feet. [d] Distance from any off-site dwelling unit shall be 100 feet. [e] Distance from any State recognized Scenic Byway shall be 150 feet. [f] Distance from any wetlands shall be 100 feet. [2] The required setback shall be planted to achieve a minimum six-foot high four-season visual barrier in accordance with the following guidelines: [a] Include a variety of native evergreen trees. Existing native vegetation may be used to achieve the required planted buffer. [b] A minimum of two rows shall be installed and trees shall be planted in staggered rows. Plantings shall be placed at maximum 20 feet apart within the same row and 10 feet apart from the adjacent, staggered row. [c] Include groundcover to minimize growth of invasive species or provide a mowing schedule until the area is fully established in a natural condition. [d] The buffer shall be maintained to prevent disease from spreading and any trees that don't survive shall be replaced. [e] A raised berm with a 1:4 side slope and flat top may be used to achieve minimum height at planting. [3] A soils study establishing the presence of any contaminants shall be completed prior to construction and every five years thereafter. Surface Soil samples shall be collected from the first six inches of soil. One composite sample shall be collected every 5 acres of SEF footprint. The composite sample should be a maximum of 10 aliquots collected from evenly spaced locations throughout the 5-acre footprint. A baseline sample shall be collected prior to the start of the SEF construction. The composite sample should be analyzed for the primary component of the installed solar panel via the prevailing EPA method for Inorganic Compounds. A letter report of findings shall be submitted within 45 days from receipt of the laboratory results to the City and shall include a summary table showing current and past results and the original certified laboratory results. A sketch showing the sample locations should be provided with the letter report. The full report shall be kept on file by the applicant and available for review by the City. If contaminate levels appear to exceed the baseline, the City will forward the report to DNREC to determine appropriate mitigation measures. If the 5 year and 10 year tests do not show material increase in the metal constituents tested, then testing interval may be extended to every 10 years. [4] Signage, not to exceed six square feet, identifying the operator, its contact numbers, 911 address and emergency contact information shall be posted at each entrance or exit of the property. (b) The following are conditions specific to Wind Facilities: [1] Setbacks for a Wind Facility shall be: [a] Front setback shall be 800 feet. [b] Side setback shall be 800 feet. [c] Rear setback shall be 800 feet. [d] Distance from any off-site dwelling unit shall be 1,000 feet. [e] Distance from any State recognized Scenic Byway shall be 800 feet. [f] Distance from any wetlands shall be 100 feet. [2] No climbing pegs or tower ladders shall be located closer than 12 feet to the ground level at the base of the structure for freestanding single poles. [3] The facility shall be designed to prevent unauthorized external access to electrical and mechanical components and shall have access doors that are kept securely locked. [4] All access roads shall be gated and locked. [5] All power transmission lines from the tower to any other building or other structure shall be located underground to the maximum extent practical. [6] No tower shall be lit except to comply with Federal Aviation Administration requirements. Minimum-security lighting for ground level facilities shall be allowed as approved on the site plan. Security lighting shall be designed to minimize light pollution, including the use of light hoods, low-glare fixtures, and directing lights at the ground. [7] All structures in a project shall be finished in a single, non-reflective, matte color or a camouflage scheme. [8] Signs. [a] No advertising signs are allowed on any part of the WECS, including fencing and support structures. [b] No lettering, company insignia, advertising, or graphics shall be on any part of the tower, hub, or blades. [c] Appropriate warning signs shall be posted. At least one sign shall be posted at the base of the tower warning of electrical shock or high voltage. A sign shall be posted on the entry area of the fence around each tower or group of towers and any building (or on the tower or building if there is no fence) containing emergency contact information, 911 address, including a local telephone number with 24-hour, 7-days-a-week coverage. The City may require additional signs based on safety needs. [9] Noise level shall not exceed 50 dBA, including constructive interference at existing off-site residences, businesses, and public buildings. (c) The following are conditions required for all Utility Solar and Wind Energy Facilities [1] Required buffers may be counted toward planting requirements included in this Chapter. [2] If topsoil is removed for improvements, it shall remain on the site. [3] Noninvasive, perennial vegetative ground cover must be maintained or established in all areas containing solar arrays and in required setbacks to prevent erosion and manage run-off. A seed mix will be used to promote the growth of a ground cover that is favorable to future use of the land by animals. The height of the vegetation growth shall be maintained as to reduce the possibility of the airborne spreading of weeds and seeds transmitted to other adjacent lands. [4] Abandonment. A Utility Solar or Wind Facility that does not produce energy for a continuous period of one year or more shall be presumed to have been abandoned. The Applicant may request a Good Cause Exemption that may not be unreasonably withheld so long as all Real Estate and Personal Property Taxes are in Good Standing. Any Utility Solar Facility that has been abandoned without attaining a Good Cause Exemption must be decommissioned and removed within 180 days. Decommissioning must consist of: [a] Physical removal of all solar photovoltaic facilities, wind turbines, structures, equipment, security barriers and transmission lines from the site. [b] Recycling or disposal of all solid and hazardous waste in accordance with local, state, and federal regulations. [c] Stabilization or re-vegetation of the site as necessary to minimize erosion. The Planning Director is authorized to allow the owner or operator to leave landscaping or designated below-grade foundations in place in order to minimize erosion and disruption to vegetation. [5] Decommissioning plan. [a] A decommissioning plan outlining the anticipated means and costs of removing the facility must be submitted, with the application. [b] The decommissioning plan should ensure that the owner or operator properly removes the equipment and facilities upon the end of project life or after their useful life. The plan must include provisions for the removal of all structures and foundations, the removal of all electrical transmission components and the restoration of soil and vegetation and/or agriculture. [c] The owner/operator must provide a present-day decommissioning cost estimate and identify the parties responsible for decommissioning. [6] Financial Assurance. Prior to final plan approval, the operator or property owner shall provide a bond, surety, letter of credit, or other financial assurance in a form and amount acceptable to the Department to secure payment of 100% of the anticipated cost of removal of all associated site improvements and restoration of the site to its pre-development condition. The financial assurance shall remain in full force and effect as long as the facility remains in place. The financial assurance shall be reviewed and renewed every five years to ensure the amount reflects the current market. D. Design standards and requirements. These are minimum requirements for all activities that are permitted or conditional uses. Conditional use activities are subject to much greater restrictions as may be required by the City Council. (1) All uses shall be conducted within a completely enclosed building. There shall be no open storage of raw, in process or finished products, supplies or waste material, except that these items shall be shielded from public view by a landscaped screen, fence or wall. (2) In a planned industrial park or any lands designated as an I-1 District, no building/structure, accessory structure or sign shall be located closer than 200 feet to any nonindustrial district boundary. (3) All front yard areas and all areas open to public view shall be maintained in a neat and attractive condition. (4) All loading operations shall be conducted at the side or rear of the building. In the unloading or loading process, no vehicles participating in these operations shall be allowed to extend into any public or private driveway or street or impede its traffic circulation. (5) All odorous fumes or matter emitted into the environment from any/all fuel-burning equipment, open stacks and internal combustion engines must comply with the requirements set forth by the State of Delaware, Department of Natural Resources and Environmental Control (DNREC). (6) Dust or particulate debris from any processing or production operations will be minimized by the use of appropriate mechanical and/or electrical devices to the extent necessary to ensure that such emissions shall not be offensive at or beyond the property line of the industry/warehouse. All such activities will comply with the requirements of the DNREC, State of Delaware. (7) All dry waste, in dust or particulate form, will be transported in closed or covered vehicles. (8) The proposed use shall not endanger the surrounding areas to the possibilities of fire, explosion or contamination. All uses shall comply with state regulations which govern their operations. There shall be no allowance for the storage of radioactive materials or those materials deemed to be toxic or dangerous. All liquid storage shall have an approved containment (area) barricade capable of containing any failure of storage medium. (9) The proposed use shall not allow the emission of heat or glare beyond its property line. All lighting shall be directed so as not to cause glare to the surrounding properties. The light source shall be shielded so as not to be visible from adjoining properties or streets. E. Area regulations. (1) Minimum lot area shall be two acres. (2) Maximum lot coverage shall be 75%. (3) Minimum lot width shall be 150 feet. (4) Maximum building height shall be 50 feet. (5) Minimum front yard setback shall be 75 feet. (6) Minimum side yard setback shall be 40 feet. (7) Minimum rear yard setback shall be 45 feet. (8) Parking shall comply with the requirements provided in Article IV of this chapter. (9) Landscape screening shall comply with the requirements provided in Article V of this chapter. (10) Signs shall comply with the requirements provided in Article VI of this chapter. (11) Accessory structures in aggregate shall occupy no more than 10 percent of the required rear and side yard of the lot and may not dominate in area, extent or purpose to the principal use or structure. The area of the principal structure shall be calculated using the definition of floor area in this chapter. (12) Accessory structures shall be located in the rear yard/lot area. (13) Accessory structures shall meet the principal use setbacks and shall not be located less than 5 feet from a principal structure.

[Ord. No. 2022-06, 1-24-2022; Ord. No. 2023-28, § 4, 8-14-2023]

Ask a question about Milford law

Corpus searches the Milford sections it holds and shows the ones that match, with their citations. Free, no sign-in.