§ 109-41 — Permit application procedures—Class 1 permits

City Code of the City of Coral Gables, Florida (Codified through Ord. No. 2026-40, enacted September 29, 2026. (Supp. No. 26, Update 1)) · Coral Gables City Code § 109-41

Corpus is an independent public-information project, not the official City of Coral Gables website. Stable reference: corpuslaw.us/code/104f611a-d39f-4f1c-a32d-b7f7d4b76bfc

Sec. 109-41. - Permit application procedures—Class 1 permits.

(a) Application for city approval. The upland owner will first submit to the public works department an application on forms prepared by the city, such forms being supplemented by: (1) Evidence of ownership of the upland and tidal or submerged lands to be filled and a title to the land from which the fill is to be taken or permission from the owner of the land to remove the fill. (2) A written statement by the owner as to the proposed use of the property to be filled. (3) Four copies of a plan or sketch of the proposed work in sufficient detail to relate the proposed dredging and filling to mean high water, mean low water, and the official bulkhead line, designation of soundings and elevations in the proposed borrow and fill areas, and names and addresses from the latest city tax rolls of owners of all riparian property within 1,000 feet of the proposed work. (4) A written statement by the owner certifying that if approval of the application by the city commission is granted, complete and detailed plans and specifications of the proposed work will be prepared by an engineer registered in the state, in accordance with the minimum requirements of the public works department. (5) Certification from a registered engineer experienced in coastal construction that: a. To the best of his or her knowledge the filling and dredging work does not violate any statute, zoning law, ordinance or other restriction which may be applicable to such area or construction work; and the engineer must submit a substantiating letter to this effect from the appropriate governmental authority as part of this certification. b. Harmful obstruction to, or alteration of, the natural flow of the navigable water within the area will not arise from the proposed work. c. Harmful or increased erosion, shoaling of channels or stagnant areas of water will not be created thereby. d. Material injury or monetary damage to adjoining land will not accrue therefrom. e. Dredging and filling shall not be conducted on weekends and holidays. Dredging and filling shall be conducted only during regular business hours on weekdays except with the written consent of the city manager, which may be amended or rescinded by him or her with notice to the applicant. (6) The city commission, before approving the application, and in addition to the certified statements in subsection (a)(5) of this section, shall require the applicant to submit a biological survey and an ecological study, the results of such study to become a part of the application. (b) Approval from the city commission. The director of the public works department will investigate the proposed plan and make his or her recommendation to the city commission prior to the public hearing, which shall be held by the city commission before the application is approved or disapproved. Prior to the public hearing at least 15 days' notice of the time and place of such hearing shall be published, which publication shall also include a brief description of the proposed work to be done and the location thereof. A courtesy notice containing substantially the same information set forth in the published notice may be mailed to those parties whose names appear upon the city's tax rolls as the owners of riparian property within 1,000 feet of the proposed work. After the public hearing, unless the city commission finds good cause for denying the application, it will approve the same subject to the approval of the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. (c) Permits from the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. Following approval by the city commission, the applicant must then obtain approval of the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. (d) Permit to dredge or fill. A permit must be obtained from the public works department prior to beginning any work previously authorized by the city commission, the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. The proposed work must be completed prior to the stated expiration date, which must be less than three years from the date of issuance of the permit, although extension may be granted for good cause, subject to approval of the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned, and subject further to receipt of written request for extension of time by the public works department prior to the original expiration date. The permit may be issued to a contractor holding an applicable certificate of competency, provided: (1) Construction plans and specifications are submitted which have been prepared to comply with the requirements of the public works department. (2) The permit fee established by section 109-44 has been paid. (3) A performance bond is posted in an amount determined by the director of public works department to be essential to protect the interest of the public and of landowners in the vicinity of the work; provided however, that the minimum amount of such bond shall be $1,000.00 or 25 percent of the estimated cost of the work, whichever is lesser, and the maximum amount of such bond shall be 100 percent of the estimated cost of the work, the bond being to guarantee compliance with the terms of the permit and to be in force for at least six months after the approved completion date of the work. (4) Certification is provided by a registered engineer that he/she has been retained to provide engineering supervision throughout the construction period.

(Code 1958, § 9A-12; Code 1991, § 8-27; Code 2006, § 109-41; Ord. No. 2067, § 2, 12-18-1973; Ord. No. 2024-02, § 2(Exh. A), 1-9-2024)