§ 109-42 — Same—Class 2 permits
City Code of the City of Coral Gables, Florida (Codified through Ord. No. 2026-40, enacted September 29, 2026. (Supp. No. 26, Update 1)) · Coral Gables City Code § 109-42
Corpus is an independent public-information project, not the official City of Coral Gables website. Stable reference: corpuslaw.us/code/7a16eb1b-9eb7-4fd2-adbc-f5d88594bff9
Sec. 109-42. - Same—Class 2 permits.
(a) Authority. The city public works department is hereby authorized to require all persons to obtain a permit for the construction of bulkheads, seawalls, groins, breakwaters, wharves, docks, piers, structures and shore activities such as beach nourishment in, upon or contiguous to submerged or tidal lands within the municipal limits of the city. (b) Application for city approval. Approval of the city commission shall be obtained for all applications. The owner shall first submit to the public works department an application on forms prepared by the city and such application must be supplemented by: (1) Evidence of ownership of the upland property abutting the proposed structure. (2) A written statement by the owner as to the proposed use of the structure to be built. (3) A plan or sketch (four copies) of the proposed structure or work in sufficient detail to relate it to mean high water, mean low water, the property lines of the upland owner, the official bulkhead lines, soundings made in the surrounding water area, and names and addresses from the latest city's tax rolls of owners of all riparian property within 1,000 feet of the proposed work. (4) A written statement by the owner that if approval from the city commission is granted, complete and detailed plans and specifications of the proposed work will be prepared by an engineer registered by the state in accordance with the minimum requirements of the city public works department. (5) Certification from a registered engineer experienced in coastal construction that: a. To the best of his or her knowledge the proposed work does not violate any statute, zoning law, ordinance or other restriction that may be applicable to such area or construction work; and such engineer must submit a substantiating letter to this effect from the appropriate governmental authority as part of this certification. b. Harmful obstruction to or alteration of the natural flow of navigable water within the area will not arise from the proposed work. c. Harmful or increased erosion, shoaling of channels or stagnant areas of water will not be created thereby. d. Material injury or monetary damage to adjoining property will not accrue therefrom. e. The city commission before approving the application, and in addition to the certified statements in subsection (b)(5) of this section, shall require the applicant to submit a biological survey and ecological study, the results of such study to become a part of the application. (c) Approval from the city commission. The director of the public works department will investigate the proposed plan and make his or her recommendation to the city commission prior to the public hearing, which shall be held by the city commission before the application is approved or disapproved. Prior to the public hearing at least 15 days' notice of the time and place of such hearing shall be published, which publication shall also include a brief description of the proposed work to be done and the location thereof. A courtesy notice containing substantially the same information set forth in the published notice may be mailed to those parties whose names appear upon the city's tax rolls as the owners of riparian property within 1,000 feet of the proposed work. After the public hearing, unless the city commission finds good cause for denying the application, it will approve the same subject to the approval of the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. (d) Permits from the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. Following approval by the city commission of the application, the applicant must obtain permits from the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned. (e) City construction permit. A construction permit for the proposed structures or shore activity involved must be obtained from the city public works department prior to beginning any work previously authorized by the city commission or state agencies concerned. The proposed work must be completed prior to the stated expiration date, which must be less than one year from the date of issuance of the permit, although extension may be granted for good cause, subject to approval of the trustees of the internal improvement fund, the U.S. Army Corps of Engineers and such other state and federal agencies concerned, and subject further to receipt of written request for extension of time by the city public works department prior to the original expiration date. The construction permit may be issued to a certified contractor provided: (1) Construction plans and specifications are submitted which have been prepared to comply with the city public works standards. (2) The permit fee established by section 109-44 for construction work has been paid. (3) A performance bond is posted in an amount determined by the director of public works department to be essential to protect the interests of the public and of landowners in the vicinity of the work; provided however, that the minimum amount of such bond shall be $1,000.00 or 25 percent of the estimated cost of the work, whichever is lesser, and the maximum amount of such bond shall be 100 percent of the estimated cost of the work, the bond being to guarantee compliance with terms of the permit and to be in force for at least six months after the approved completion date of the work. (4) Certification is provided by a registered engineer that he/she has been retained to provide engineering supervision throughout the construction period. (f) Exceptions. Those requirements of subsection (c) of this section pertaining to a public hearing and approval by the city commission shall not apply to installation of mooring piles; construction of docks adjacent to residential lots if the proposed mooring piles and docks are to be located in accordance with the city zoning code; nor to repair or restoration of docks (limited to original dimension only) for which state construction permits have been issued.
(Code 1958, § 9A-13; Code 1991, § 8-28; Code 2006, § 109-42; Ord. No. 2067, § 3, 12-18-1973; Ord. No. 2024-02, § 2(Exh. A), 1-9-2024)
Ask a question about Coral Gables law
Corpus searches the Coral Gables sections it holds and shows the ones that match, with their citations. Free, no sign-in.
