Chapter 3 — SEWERAGE
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025), Gainesville, FL · 29 sections. Independent public-information project, not the official City of Gainesville website.
- § 27-166 — Policy, purpose, enforcement
- § 27-167 — Permit fee for plumbing and sewerage installation
- § 27-168 — Sewer connection—New buildings
- § 27-168.1 — Same—Existing buildings generally
- § 27-168.2 — Same—Existing buildings with inadequate, unsatisfactory, etc., individual sewage disposal system
- § 27-169 — Rates and charges
- § 27-170 — Deferred payment of residential wastewater service connection charges
- § 27-171 — Wastewater connection charges
- § 27-172 — Plan review fee and inspection service fee
- § 27-173 — Pump station (primary)
- § 27-174 — Force main extension (CIAC)
- § 27-175 — Requirement for additional CIAC
- § 27-176 — Gravity line or pump station/force main construction
- § 27-177 — Refunds of prepaid charges
- § 27-178 — Maintenance of laterals
- § 27-179 — Oversized facilities
- § 27-180 — Pretreatment program—Generally
- § 27-180.1 — Same—Prohibited substances
- § 27-180.2 — Same—Conditional requirements for specific discharges
- § 27-180.3 — Same—Permitting
- § 27-180.4 — Same—Monitoring, reporting, and notification
- § 27-180.5 — Same—Pretreatment facilities and monitoring equipment
- § 27-180.6 — Same—Accidental discharge/slug prevention
- § 27-180.7 — Same—Enforcement
- § 27-180.8 — Same—Regulation of wastewater received from other jurisdictions
- § 27-181 — Graywater disposal facilities
- § 27-182 — Private wastewater disposal system—Approved by county; compliance with state standards required
- § 27-182.1 — Same—Permits; inspection
- § 27-182.2 — Same—Discharges
