§ 27-171 — Wastewater connection charges
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 27-171
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/8026ec06-19a8-4922-a19f-7dd8e4021c63
Sec. 27-171. - Wastewater connection charges.
(a) Identification of wastewater connection charges. The wastewater connection charges under this section shall consist of a collection system connection charge and a treatment plant connection charge. The following categories of applicants shall pay the minimum connection charge according to the schedule set out in Appendix A: single family connections without fire sprinkler system with three-quarter inch or smaller meter; single family residential connections with fire sprinkler system with one inch or smaller water meter; and/or nonresidential connections with an estimated annual average daily flow (ADF) of less than or equal to 280 gallons per day (GPD). All other applicants shall pay the flow based connection charges according to the schedule set out in Appendix A. Wastewater flow-based connection charges shall be assessed prior to water meter installation. Each applicant for wastewater service shall pay to the city, prior to service being rendered, the applicable wastewater connection charges in accordance with the schedule set out in Appendix A. The wastewater connection charges shall not be applicable to any property that has been duly designated, by the general manager for utilities or the general manager's designee, as having had the city's relevant wastewater connection costs recovered previously for such property, provided such property had an active wastewater account with city within the past ten years from the date of application. (b) For water meters larger than one inch. The applicant shall provide the city a detailed estimate of the expected ultimate water demand in annual average daily flow (GPD-ADF) to be served by the water meter to be installed. The wastewater service demand shall be deemed equal to the estimated water service demand. It is the applicant's responsibility to coordinate the preparation of this estimate with the city in order to ensure the provision of sufficient detail and proper documentation of estimated demand. Such detail shall include an ultimate site plan for the development indicating what properties are to be served by the subject water meter(s). The city reserves the right to perform its own estimate of service demand, which shall take precedence for the purpose of calculating the charge. (c) For nonresidential water meters one inch or smaller. The applicant shall provide the city an ultimate site plan or other documentation to substantiate building size for all properties served by the subject water meter(s). The expected ultimate demand in gallons per day annual average flow (GPD-ADF) will be determined by the city based on the site plan and the anticipated use of the facilities being served by the subject meter(s). Alternatively, the applicant may provide the city a detailed estimate of the expected ultimate demand. However, the city reserves the right to perform its own estimate of service demand, which shall take precedence for the purpose of calculating the charge. (d) Connection charge adjustment. The purpose of this subsection is to provide for adjustment of wastewater connection charges when major and significant changes of water consumption associated with an existing service occur. The purpose of this subsection is not to adjust for insignificant errors in estimates of annual average daily flow, flow changes due to weather variances, or other normal changes in consumptive use of water. The city may use building permits, water consumption records, and other reasonable information to enforce the provisions of this subsection. After water meters are installed and whether or not any connection charges were assessed at the time of installation, an adjustment in the connection charges already paid or new charges may be assessed if one or more of the following conditions occur: (1) Additional water meter installed. If an additional water meter is installed, the amount charged the applicant shall be calculated according to the schedule set forth in Appendix A. (2) Actual demand exceeds estimated or change in use of facility. If the actual annual average daily flow (ADF) measured over a 12-month period should exceed the estimated demand on which a previous connection charge payment was based or if there is a change in use of the facility that is expected to result in a demand greater than the estimated demand on which a previous connection charge payment was based, the city reserves the right to review and revise the previous demand estimate and to assess additional charges for the increased demand calculated according to the schedule set forth in Appendix A. (3) Actual demand less than estimated. If within the 24-month period following meter installation, the applicant can demonstrate to the city's satisfaction that the applicant's average daily flow (ADF) has been and will continue to be less than that estimated and used as a basis for assessing the wastewater connection charges, the applicant may request a refund. The request shall include the applicant's copy of the original service demand estimate which shall be accompanied by sufficient explanation of the lower than estimated demand. If the city approves the request, the city shall pay a refund to the applicant based on the amount of excess service demand originally assessed and the current charge for that demand calculated according to the schedule set forth in Appendix A. (4) Construction of new structures or facilities. If new structures or facilities are constructed causing additional demand for wastewater services and these facilities were not included or properly described in the applicant's original detailed estimate (and site plan) of service demand, then additional wastewater connection charges shall be assessed by the city based on the estimated additional demand calculated according to the schedule set forth in Appendix A. (f) Greywater disposal systems. The city is authorized to adjust wastewater connection charges assessed at the time of original water meter installation or assessed thereafter, as set forth in Appendix A, to reflect reduced wastewater loadings from approved individual graywater disposal systems. These adjustments shall be determined by procedures and engineering calculations contained in policies approved by the city commission.
(Code 1960, § 28-64.1; Ord. No. 3087, § 5, 12-17-84; Ord. No. 3564, § 2, 9-18-89; Ord. No. 3581, § 1, 12-4-89; Ord. No. 3697, § 12, 2-18-91; Ord. No. 3739 § 2, 9-30-91; Ord. No. 3754, § 80, 1-27-92; Ord. No. 951541, § 2, 6-10-96; Ord. No. 150246, § 3, 9-17-15; Ord. No. 211448, § 4, 9-22-22)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
