§ 27-180.5 — Same—Pretreatment facilities and monitoring equipment
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 27-180.5
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/00a97b96-0774-4dfe-87dc-af0eadaca06b
Sec. 27-180.5. - Same—Pretreatment facilities and monitoring equipment.
(a) Pretreatment facilities and/or monitoring equipment shall be required for any waste that may be harmful to equipment or the wastewater collection system, cause pass through or interference in the wastewater system or cause nuisance, odor, or stoppage problems in the wastewater system. Users shall provide wastewater treatment as necessary to comply with this division and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in section 27-180.1 within the time limitations specified by the EPA, the Florida Department of Environmental Protection, or the general manager for utilities or his/her designee, whichever is more stringent. (b) The general manager for utilities or his/her designee may require monitoring equipment including but not limited to flow monitoring and sampling devices. (c) The owner shall be responsible for the construction, operation and maintenance of any pretreatment facilities or monitoring equipment required by the general manager for utilities or his/her designee. Detailed plans describing such facilities and operating procedures shall be submitted to the general manager for utilities or his/her designee for review, and shall be acceptable to the general manager for utilities or his/her designee before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying the facilities as necessary to produce a discharge acceptable to the general manager for utilities or his/her designee under the provisions of this section. (d) Users shall control production of all discharges to the extent necessary to maintain compliance with discharge standards contained in this division upon reduction, loss, or failure of the user's treatment facility until the facility is restored or an alternative method of treatment is provided.
(Ord. No. 980894, § 3, 6-14-99; Ord. No. 120211, § 5, 9-20-12)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
