§ 9.5 — PRELIMINARY PLAT AND CONSTRUCTION PLANS

Code of Ordinances of the City of Lakeland, Florida (Supp. No. 22: codified through Ordinance No. 6121, enacted December 1, 2025) · Lakeland Land Development Code § 9.5

Corpus is an independent public-information project, not the official City of Lakeland website. Stable reference: corpuslaw.us/code/023b0d89-0753-4b3d-8a69-705d52aeb9f4

9.5 - PRELIMINARY PLAT AND CONSTRUCTION PLANS

9.5.1 PRELIMINARY PLAT AND CONSTRUCTION PLANS REVIEW AND APPROVAL PROCESS 9.5.1.1 Preparation and Submission of Preliminary Plat and Construction Plans A prospective applicant or his agent shall prepare a preliminary plat and construction plans in accordance with these regulations and the City of Lakeland Engineering Standards Manual and shall address comments made by the Subdivision Review Team during concept review. The preliminary plat and construction plans shall be submitted together, along with a boundary and topographic survey prepared in accordance with Chapter 472, F.S. and 5J-17, FAC and the required fees, in accordance with the most recent Subdivision Review Procedures. The boundary and topographic survey shall be prepared by a Professional Surveyor and Mapper registered by the State of Florida. Construction plans shall be prepared by a Professional Engineer licensed by the State of Florida. The Director of Community and Economic Development shall distribute copies of the preliminary plat, construction plans and survey in accordance with the most recent Subdivision Review Procedures. 9.5.1.2 Review of Preliminary Plat and Construction Plans A preliminary plat and construction plans shall be reviewed by the city's Subdivision Review Team. Each department having responsibility for enforcement of these regulations shall provide comments in accordance with the department's areas of responsibility as to conformance of the preliminary plat and construction plans with the regulations. The General Manager of Lakeland Electric shall determine the adequacy of easements and other provisions for electricity distribution and the Director of Water Utilities shall determine the adequacy of easements and provisions for water supply and wastewater collection. Where infrastructure systems may be extended to serve future areas or can be upgraded to meet future needs, the city shall have the right to require that appropriate provisions be incorporated into the utility designs. Such provisions may include easements to allow utilities to be extended to property lines to serve abutting lands, extensions to accommodate future looping and upsizing to increase capacity. If the infrastructure systems in a development are upsized to meet needs above those of the development, the city may, by written agreement, cover the incremental cost increases to upsize said facilities. The upsizing agreement shall be approved, when applicable, prior to any start of utility construction. 9.5.1.3 Approval or Disapproval of Preliminary Plat and Construction Plans by Subdivision Review Team The Subdivision Review Team shall approve or disapprove a preliminary plat and construction plans within thirty days of the receipt of such and a complete application for approval with all required submittals. The basis for approval shall be a finding that the preliminary plat and construction plans conform with the provisions of these regulations. The basis for disapproval shall be a finding that the preliminary plat and construction plans do not conform or that there is insufficient information to determine conformance. The Subdivision Review Team's decision shall be communicated in writing to the applicant. If the Subdivision Review Team disapproves the application, the applicant shall be informed which aspects of the design do not conform to these regulations and shall be given an opportunity to make the necessary changes. Following written notification of approval by the Subdivision Review Team, the applicant shall submit signed and sealed copies of the construction plans to the Community and Economic Development Department for final approval. 9.5.1.4 Appeal of Subdivision Review Team's Recommendation of Approval or Disapproval The action of the Subdivision Review Team to recommend disapproval of a preliminary plat may be appealed to the Planning and Zoning Board. The basis of such appeal shall be that the action is based on an incorrect interpretation of the requirements of these regulations. In the event of an appeal, the Board shall take such action as it deems appropriate within the scope of these development regulations. Technical variations shall not be considered appeals. 9.5.2 EXPIRATION OF PRELIMINARY PLAT AND CONSTRUCTION PLAN APPROVAL Approved preliminary plat and construction plans shall remain valid, provided that construction of the subdivision improvements has commenced within one year after the date of the approval and a final plat based thereon is recorded within two years after the date of approval. However, one or more extensions of not more than one year each may be granted by the Director of Community and Economic Development upon a finding that there have been no changes which make some other type of development or some other configuration more appropriate. Changes to be considered include, but are not limited to, changes in land development regulations, changes in the existing use of land, changes in streets and roads, changes in traffic volumes and patterns and changes or contemplated changes in the Comprehensive Plan goals, objectives and policies. 9.5.3 PRELIMINARY PLAT DESIGN AND DRAWING REQUIREMENTS 9.5.3.1 General Design Standards for Preliminary Plats Preliminary plats shall be consistent with the general design standards for layout of subdivisions set forth herein and other applicable requirements of this Code. These standards shall apply regardless of whether the roads, utilities or other infrastructure systems are to be publicly or privately operated or maintained. 9.5.3.2 Size, Scale and Character of Preliminary Plat Drawings Preliminary plats shall be drawn on sheets that are 24 inches by 36 inches in size. They shall be drawn to an engineering scale which is suitable to depict all significant characteristics of the proposed subdivision. They may be drawn in sketch form provided that they are sufficiently specific to allow determination of compliance with all requirements of these regulations. 9.5.3.3 Information Shown on Preliminary Plat Drawings At a minimum, preliminary plat drawings shall contain the following information: a. Name of the subdivision; b. Names of all current owners of record of the subject property; c. Name and address of preparer and date of preparation; d. North arrow and scale of all drawings; e. Location map; f. A metes and bounds legal description of the land contained within the proposed subdivision and total area of said land contained therein; g. Proposed divisions of land including but not necessarily limited to lots, blocks, parcels, tracts, sites, common areas and streets; h. Right-of-way locations, lines, and names of all proposed and existing streets, alleys or roads in, through or adjoining the subdivision; and i. Typical lot layout for interior and corner lots showing minimum building setbacks in accordance with the adopted zoning; j. For residential subdivisions, identification of the number of lots, not to exceed 75 percent of the total development lots, that are proposed to commence construction prior to recording of the final plat. The requirements for Early Start Construction are outlined in Sub-Section 9.8.8. 9.5.4 CONSTRUCTION PLAN DESIGN AND DRAWING REQUIREMENTS 9.5.4.1 General Design Standards for Construction Plans Construction plans shall be consistent with the general design standards for construction of subdivision improvements set forth in Section 9.9. 9.5.4.2 Size, Scale and Character of Construction Plan Drawings Construction plan drawings shall be drawn on sheets that are 24 inches by 36 inches in size and that have a two-inch binding margin on the left side and a one-inch margin on the other three sides, unless otherwise required by the city. They shall be drawn to an engineering scale that is suitable to depict all required information but in no instance at a scale dimension smaller than 1" = 50' horizontal for plan view, or 1" = 5' vertical for profile view. 9.5.4.3 Information Shown on Construction Plan Drawings Construction plan drawings shall contain the following minimum information: a. The location of existing property lines, streets, sidewalks, buildings, water courses, wetlands, floodplains, railroads, sewers, bridges, culverts, drain pipes, water and wastewater mains and any public or private easements that are within or adjacent to the proposed subdivision. b. All proposed subdivision improvements, including improvements specified in or made necessary by conditions adopted as part of Planned Unit Developments or other zoning ordinances applicable to the subject property. c. Proposed roadway typical section, including all dimensions and structural features of the proposed section including street lighting and street trees. The proposed roadway typical shall be consistent with street types permitted in the context in accordance with Section 3.3 and with an appropriate typical section as shown in the Engineering Standards Manual or of an alternate design approved by the Director of Public Works. d. Alignments and dimensions of proposed streets, alleys, parks, public lands, easements and utility layouts (electrical distribution, water supply including fire hydrants, wastewater, and stormwater management), showing feasible connection to an existing or proposed system. The alignments and dimensions shall provide for the installation of underground electrical distribution and service to each lot contained within the subdivision plat. e. Lot lines and appropriate dimensions. f. Contour lines at vertical intervals of not more than one foot. g. Existing ground profiles and proposed grades of all streets and profiles of utilities as may be necessary to review critical areas or points of conflict. Street profiles and grades shall be at center lines of streets. h. Soil survey data in accordance with the Engineering Standards Manual. i. A Professional Engineer licensed in the State of Florida shall sign and affix his seal to each sheet of engineering plans submitted for review in accordance with Chapter 471, F.S. j. Detailed construction drawings for any and all external utility construction to extend adequate water and wastewater services to the development, including the size and location of interconnections. Utility design shall be supported by detailed flow, loading, hydraulic, fire flow and demand calculations demonstrating the ability of the proposed infrastructure to meet the demands within the development. k. Provisions, both in terms of easements, depths, sizes and stub-outs, to enable the future extension of the utilities to abutting properties for future service and/or looping as required by the city through an upsizing agreement or other written agreement entered into by the city and the developer. l. The number and location of any homes proposed to commence construction prior to recording of the final plat in accordance with Sub-Section 9.8.8. m. A street tree planting plan in accordance with the landscaping and irrigation plan requirements of Section 4.5. 9.5.5 BINDING CONCURRENCY DETERMINATION REQUIREMENT An application for concurrency determination for transportation and schools shall be submitted to the Community and Economic Development Department along with the preliminary plat and construction plans. For all single-family and two-family subdivisions, a binding concurrency determination shall be required as part of the preliminary plat and construction plans review. If this determination indicates that any essential services will be degraded below the adopted level of service, as defined in the Lakeland Comprehensive Plan, then the preliminary plat and construction plans will not be approved. If this determination indicates that all essential services are available to support the impacts of the proposed subdivision at acceptable levels of service, then the application shall be deemed concurrent and a concurrency reservation for transportation and schools will be approved. For all multiple-family and non-residential subdivisions, a binding concurrency determination shall be required as part of the Commercial Site Plan review process following recording of a final plat. The approval of a Right-of-Way Subdivision plat shall not be construed as final development approval for purposes of issuance of a Certificate of Concurrency. A binding concurrency determination shall become effective from the date of approval of the preliminary plat and construction plans by the Subdivision Review Team and shall remain in effect until the plat is recorded, or for 24 months, whichever comes first. If the final plat has not been recorded within 24 months, then the concurrency approval and reservation for transportation and schools shall expire. 9.5.6 WAIVER OF PRELIMINARY PLAT AND CONSTRUCTION PLAN REQUIREMENTS FOR MINOR SUBDIVISIONS Subject to the approval of the Director of Community and Economic Development, the Director of Public Works, the General Manager of Lakeland Electric, the Director of Water Utilities and the Director of Parks and Recreation, the preliminary plat and construction plan requirements may be waived for minor subdivisions in accordance with the following: a. A formal written request and justification to waive the construction plan requirements must be submitted by the applicant for the City's consideration at the time of Concept Plan Review. b. For single-family and two-family residential subdivisions, all lots within the subdivision shall have access to and frontage on an existing public or private street improved to current City standards. Potable water and sanitary sewer service shall be available to all lots. c. For multi-family and non-residential subdivisions, legal access and existing adequate utilities shall be available to all lots. d. The proposed subdivision shall not involve the construction of roadways, drainage facilities, stormwater infrastructure, utilities or any other subdivision improvements stipulated by this Code, the City's Engineering Standards Manual, or any other government agency having jurisdiction. e. The minor subdivision review process shall consist of a final plat in accordance with Section 9.7.

(Ord. No. 6124, § 2(Att. D), 12-15-25) (Ord. No. 6124, § 2(Att. D), 12-15-25) (Ord. No. 6124, § 2(Att. D), 12-15-25) (Ord. No. 6124, § 2(Att. D), 12-15-25) (Ord. No. 6124, § 2(Att. D), 12-15-25) (Ord. No. 6124, § 2(Att. D), 12-15-25)