§ 9.6 — CONSTRUCTION OF SUBDIVISION IMPROVEMENTS
Code of Ordinances of the City of Lakeland, Florida (Supp. No. 22: codified through Ordinance No. 6121, enacted December 1, 2025) · Lakeland Land Development Code § 9.6
Corpus is an independent public-information project, not the official City of Lakeland website. Stable reference: corpuslaw.us/code/29a86dec-2d7e-4433-8935-0e9037d40824
9.6 - CONSTRUCTION OF SUBDIVISION IMPROVEMENTS
9.6.1 LETTER OF AUTHORIZATION REQUIRED Upon approval of the preliminary plat and construction plans by the Subdivision Review Team, the Community and Economic Development Department shall notify the Director of Public Works. When the Director of Public Works has verified all plans, permits and guarantees have been approved by all city departments, the Director shall issue a Letter of Authorization allowing the construction of subdivision improvements to commence. Construction of subdivision improvements shall not commence unless and until the Public Works Director has issued a Letter of Authorization. However, certain land alteration activities may be permitted through the issuance of a Site Alteration Permit in accordance with Section 6.5. 9.6.2 INSTALLATION OF UNDERGROUND UTILITIES Underground utilities such as electrical lines, telephone lines, cable television lines, water mains, gas mains, wastewater collection facilities, stormwater management facilities, non-potable irrigation water facilities, including conduits, sleeves and/or raceways for future underground utilities, and all service connections at property lines shall be installed prior to the installation of any stabilized subgrade, street base course, paving or curbing; provided, however, that underground utilities may be installed after installation of street base course, paving or curbing in accordance with procedures approved by the Director of Public Works. 9.6.3 SUPERVISION, INSPECTION, TESTING AND CERTIFICATION 9.6.3.1 Construction Supervision by Developer's Engineer The developer shall be responsible for employing a Professional Engineer licensed in the State of Florida who shall inspect the construction of all subdivision improvements and certify that the subdivision improvements have been constructed in substantial accordance with the approved plans and specifications. 9.6.3.2 Construction Inspection and Testing a. The Director of Public Works shall be notified at least 48 hours before any construction is to start. The director shall make or cause to have made periodic inspections of the subdivision construction. Within any given geographic area, the following construction operations shall proceed in the order in which they are listed with subsequent operations being allowed to proceed only upon satisfactory completion of required inspections and tests for preceding operations: (1) Installation of underground utilities and stormwater systems; (2) Subsoil excavation, as required; (3) Construction of roadway subgrade and curb; (4) Construction of roadway base; and (5) Construction of roadway surface. b. The Director of Public Works shall order such tests to be performed on pipe and concrete work, trench backfill, subgrade construction, base construction and asphaltic concrete surface as necessary to ensure construction is in accordance with the city's specifications. All such tests shall be performed by a qualified geotechnical engineering laboratory with samples drawn from locations designated by the city's inspector. A copy of each test report shall be furnished to the city. During the course of the construction of the subdivision improvements, the city may require the following tests to be performed, the costs of which shall be borne by the developer: (1) AASHTO Soil Classification in public right-of-way at any location deemed appropriate by the city's engineer; (2) Proctor and densities on embankment construction; (3) Florida bearing value or limerock bearing ratios of top 12 inches of subgrade; (4) Proctor and densities on subgrade and base; (5) Concrete cylinder breaks on curb construction; (6) Asphalt extraction on asphaltic concrete surface course; (7) Thickness cores on base and pavement; (8) Video taping of the interior of storm sewer; or (9) Other tests as city deems necessary to ensure compliance with city's requirements. All construction practices, test methods, frequencies and results must conform to requirements published in current edition of FDOT Standard Specifications for Road and Bridge Construction or adopted City of Lakeland standards. 9.6.3.3 Electrical Inspection and Testing by General Manager of Lakeland Electric The General Manager of Lakeland Electric may inspect or cause to be inspected all electric distribution conduit system construction, installations and materials. At a minimum, inspections shall be made at the completion of underground electric service. Backfilling may be done to protect the facility; however, all fittings and joints must be left accessible for inspection. Electric Engineering Division inspectors are authorized to call any violation of specifications to the attention of the contractor and may reject materials or suspend work pending resolution of issues or conflicts by the Electric Engineering Division. The General Manager of Lakeland Electric shall be notified at least 48 hours prior to commencement of work. At any time the contractor suspends work for a period exceeding two business days, the General Manager must be notified prior to the restart of work. 9.6.3.4 Water Supply and Wastewater Collection Facilities Inspection and Testing by Director of Water Utilities The Director of Water Utilities may inspect or cause to be inspected all water supply and wastewater collection systems construction, installations, testing, clearances and materials. Construction coordination, inspection observations, witnessing of testing and acceptance requirements will be defined by the Water Utilities Department and communicated to the developer during review, approval and pre-construction meetings. The developer shall not place any water or wastewater facilities into operation without the prior approval of the Water Utilities Department, the securing of all clearances and receipt of applicable permits. The Director of Water Utilities shall be notified at least two business days prior to commencement of work. At any time the contractor suspends work for a period exceeding two business days, the Director of Water Utilities must be notified prior to the restart of work. 9.6.3.5 Violation Notice—Construction Not in Compliance with Approved Plans During the construction of subdivision improvements, if such improvements are found to be defective or not in compliance with the approved plans, the Director of Public Works, may issue a written violation notice to the contractor identifying the nature of the violation and stipulating a time period in which the violation must be corrected. Failure of the contractor and/or developer to correct the violation and to comply with the violation notice may result in any of the following: a. The issuance of a stop work order; b. The violation notice being referred to the Code Enforcement Board; and/or c. The city initiating legal proceedings against the contractor and/or developer. 9.6.3.6 Stop-Work Orders The Director of Public Works may order work to stop at any point if he determines that it does not conform to these regulations or other applicable municipal requirements, or that it is being performed in a dangerous or unsafe manner. Stop-work orders shall operate to halt construction until necessary corrections have been made. 9.6.3.7 Changes During Construction Any changes that would result in significant modifications to the approved plans must first be approved in writing by the Director of Public Works, the General Manager of Lakeland Electric, the Director of Water Utilities, and the Director of Parks and Recreation or their designees, as appropriate, following review by the Subdivision Review Team. Revised plans must be signed and sealed by the engineer of record of the project or by his agent. After revised plans have been approved by the city, the developer or his agent will be authorized to issue changes to modify the approved plans. Copies of all plans and/or specifications for which changes have been issued in accordance with the most recent Subdivision Review Procedures shall be provided to the city. 9.6.3.8 Certification by Developer's Engineer Upon completion of the subdivision improvements, the developer's supervising engineer shall certify to the Director of Public Works in writing that all improvements have been installed and completed in compliance with these and other applicable municipal regulations and shall provide the Director of Public Works, the General Manager of Lakeland Electric, the Director of Water Utilities, and the Director of Parks and Recreation or their designees with all certifications and required submittals, including "as-built" (record) drawings, in accordance with the Engineering Standards Manual. 9.6.3.9 Assurance of Completion Performance Guarantee At their discretion, the Director of Public Works, the General Manager of Lakeland Electric, the Director of Water Utilities, or the Director of Parks and Recreation may authorize the developer to post an assurance of completion performance guarantee to cover the completion of minor work or the correction of minor deficiencies on subdivision improvements. At a minimum, such guarantee shall be in an amount equal to 125 percent of the cost of completion of the improvements in accordance with the Engineering Standards Manual. The posting of such guarantee shall not prevent the recording of the plat, however, no maintenance guarantee in accordance with Sub-Section 9.6.3.10 shall be accepted and no Certificate of Occupancy shall be issued until all work and deficiencies have been completed and the assurance of completion performance guarantee has been released. 9.6.3.10 Maintenance Guarantee The developer shall furnish a maintenance guarantee covering all public subdivision improvements that are to be maintained by the City of Lakeland, including but not limited to, streets, drainage systems, utilities and landscaping within public rights-of-way. The guarantee shall be in the form of a bond, cash, cashier's check, or irrevocable letter of credit satisfactory to the City Attorney. At a minimum, the maintenance guarantee shall be in the amount of 15 percent of the engineer's estimate of the construction cost for the publicly-dedicated infrastructure, subject to review and approval by the Director of Public Works. The maintenance guarantee shall not be released nor shall it expire prior to the maintenance periods specified in Sub-Section 9.6.3.11 without the written consent of the Director of Public Works. In the event of a failure or damage to any subdivision improvements resulting in a safety hazard to the public, the city, after attempting to notify the developer, may make repairs to protect the public and may bill the developer for costs incurred. In the event of an immediate threat to public safety, such attempt at notification may be by telephone. Such failure or damage to subdivision improvements may include ruptured or leaking water or sewer lines, roadway failures, erosion, or any infrastructure failures necessary for the subdivision to be functional. If the developer fails to reimburse the city for all costs associated with completing the repairs the city may use the maintenance guarantee to recover its costs. 9.6.3.11 Certification by Director of Public Works, General Manager of Lakeland Electric, Director of Water Utilities and the Director of Parks and Recreation and Acceptance of Public Subdivision Improvements When the developer's engineer has certified the public subdivision improvements and the applicable maintenance guarantees have been provided and approved, the Director of Public Works, the General Manager of Lakeland Electric, the Director of Water Utilities, and the Director of Parks and Recreation or their designees shall make one or more inspections as deemed appropriate to determine that all public subdivision improvements have been installed and completed in compliance with the approved construction plans. If such a determination is made, they shall certify this in writing to the City Manager, the Director of Community and Economic Development and developer. If it is determined that the public subdivision improvements have been completed and installed in compliance with the approved construction plans, the following maintenance periods shall apply prior to final acceptance of the public subdivision improvements by the city: a. Roadways and roadway drainage systems shall be maintained by the developer for one year, or an alternative length of time approved by the Director of Public Works. b. Required landscaping and street trees shall be maintained by the developer for one year, or an alternative length of time approved by the Director of Parks and Recreation. c. Potable water and sanitary sewer systems shall be accepted by the City of Lakeland for maintenance, subject to a maintenance guarantee period of not less than one year, or an alternative length of time approved by the Director of Water Utilities. d. Electric conduits and transformer pads shall be accepted by the City of Lakeland for maintenance, subject to a maintenance guarantee period of one year from the energized date. In the event that non-standard or alternative construction methods or materials are proposed by the developer, the city may increase the amount of the maintenance guarantee or extend the maintenance period, or both, to assure that the public subdivision improvements function in accordance with city standards. At the end of the maintenance periods specified above, the City Manager shall notify the developer in writing of his acceptance or rejection of the infrastructure for city maintenance. The City Manager may accept portions of the public subdivision improvements for city maintenance, in which case the developer shall be released from all liability for those portions that have been accepted. 9.6.4 OFF-SITE IMPROVEMENTS a. As a condition of construction plan approval, the city may require the developer to pay a pro-rata share of the cost of providing reasonable and necessary infrastructure improvements, including land and easements, located off-site of the proposed subdivision but required by the proposed subdivision to maintain minimum levels of service, to provide adequate system capacity, to correct potential traffic safety problems, to provide for proper vehicle and pedestrian connectivity and flow, or to mitigate other off-site impacts. Off-site improvements may include the construction of intersection improvements or signalization, widening of roads or addition of turn lanes or shoulders, construction of utilities or extension of utilities up to the limits of private property, drainage improvements, sidewalks and any other infrastructure deemed necessary by the city. In cases where off-site improvements are necessitated by the proposed subdivision, the developer may be required to provide and install such improvements, including land and easements, at his own expense. In cases where off-site improvements will also benefit other property owners, the developer may be required to pay a share of the cost of such improvements proportionate to such benefit in accordance with a development agreement or other instrument acceptable to the City Attorney setting out the method of proportionate allocation. In the event that off-site infrastructure improvements are required, they may be handled in the same manner as on-site improvements or as specified in a development agreement or other instrument. b. A performance guarantee shall be required when off-site improvements are to be constructed by the developer within public rights-of-way or publicly owned property. The developer shall provide the performance guarantee as defined in the Engineering Standards Manual prior to the issuance of a Letter of Authorization. Unless otherwise established by the Director of Public Works, the performance guarantee shall be for 125 percent of the engineer's certified cost estimate, as reviewed and approved by the city, for the construction of such improvements and shall be in the form of cash, cashier's check, or irrevocable letter of credit satisfactory to the City Attorney. The city may use the performance guarantee to recover the cost of correcting faulty workmanship, damage caused by on-site or off-site construction, material failures, or other outstanding construction issues. The performance guarantee shall not be released nor shall it expire without the written consent of the Director of Public Works and shall remain in effect until a maintenance guarantee is provided and accepted by the city for all components covered under the performance guarantee. No Certificate of Occupancy shall be issued nor shall any beneficial occupancy of any buildings take place until the off-site improvements which are required by the city for the specific phase being constructed are complete and a maintenance guarantee has been accepted. The performance guarantee shall include language giving the city the right to complete the project or to assign the project to others for disposition or completion in the event of default on the guarantee by the developer. In accepting such guarantee, the city shall not in any way be bound to complete the project. c. The developer shall furnish a maintenance guarantee covering all off-site improvements. The guarantee shall be in the form of cash, cashier's check, or irrevocable letter of credit satisfactory to the City Attorney. At a minimum, the maintenance guarantee shall be in the amount of 15 percent of the engineer's cost estimate, reviewed and approved by the city, for the improvements. The maintenance guarantee shall be provided prior to release of the performance guarantee. The maintenance guarantee shall not be released nor shall it expire without the written consent of the Director of Public Works.
(Ord. No. 6124, § 2(Att. D), 12-15-25) (Ord. No. 6124, § 2(Att. A), 12-15-25)
Ask a question about Lakeland law
Corpus searches the Lakeland sections it holds and shows the ones that match, with their citations. Free, no sign-in.