For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.9 — GENERAL DESIGN STANDARDS FOR CONSTRUCTION OF SUBDIVISION IMPROVEMENTS

Code of Ordinances of the City of Lakeland, Florida (Supp. No. 22: codified through Ordinance No. 6121, enacted December 1, 2025) · Lakeland Land Development Code § 9.9

Corpus is an independent public-information project, not the official City of Lakeland website. Stable reference: corpuslaw.us/code/06fc453d-7a3d-4293-a722-d4293ab71680

9.9 - GENERAL DESIGN STANDARDS FOR CONSTRUCTION OF SUBDIVISION IMPROVEMENTS

Subdivision improvements shall be constructed in a manner which fully comply with the applicable provisions of this section and other sections of this code and with applicable sections of the following: a. Engineering Standards Manual and other references contained therein; b. Manual of Uniform Standards for Design, Construction and Maintenance of Streets and Highway, Florida Department of Transportation, latest edition; c. "Standard Specification for Road and Bridge Construction," Florida Department of Transportation, latest edition; d. "Roadway Design Standard Detail Indexes," Florida Department of Transportation, latest edition; e. Manual of Uniform Traffic Control Devices, latest edition; f. Drainage Manual, Florida Department of Transportation, latest edition; g. Chapter 5J, FAC, Chapter 471, F.S. and Chapter 472, F.S., or successor provisions; h. Chapter 177, F.S., or successor provisions; and i. City of Lakeland Fire Code. 9.9.1 UTILITIES 9.9.1.1 Water Supply Water mains properly connected with the public water supply system or other approved system shall be installed in such a manner as to adequately serve all lots shown on the subdivision plat for both domestic use and fire protection. The location, size and types of water mains, valves and fire hydrants; the amount of soil cover over the pipes; and other features of the installation shall be as required by the city. The water distribution system shall be installed by the developer at his expense, except for specifically designated oversizing required by the city. The design and the construction of the system must be approved by the city and the necessary permits for system construction must be obtained from the Florida Department of Environmental Protection prior to the start of system installation. Cross-Connection Control All new connections to the public water supply system shall have an appropriate cross-connection control device meeting city standards and conforming to the current rules and regulations of the Florida Department of Environmental Protection. Such devices shall prevent the backflow of contaminated water into the potable water distribution network. Water Conservation Requirements All new residential, commercial and industrial connections will be required to utilize water-conserving fixtures in accordance with Florida Plumbing Code. In addition, all subdivisions will be required to recommend the use of Florida-Friendly landscaping plants and grasses to minimize supplemental water use. All lawn irrigation systems shall be designed for efficient water use. 9.9.1.2 Wastewater Collection When any part of a proposed subdivision is within 1,250 feet of a usable public wastewater collection system, all lots in the subdivision shall be connected therewith unless otherwise determined by the Director of Water Utilities based on considerations of the cost effectiveness or availability of capacity. The cost of providing the wastewater collection facilities shall be paid by the developer, except as provided by Sub-Section 9.6.4. The design and the construction of the system shall be approved by the Director of Water Utilities in accordance with the Engineering Standards Manual and the necessary permits for system construction shall be obtained from the Florida Department of Environmental Protection prior to the start of system installation. 9.9.1.3 Irrigation Water Supply Non-potable water sources, such as shallow groundwater wells or stormwater retention ponds, shall be used for the irrigation of common landscaped areas in new residential subdivisions and new non-residential subdivisions unless the Director of Water Utilities determines that a non-potable source is infeasible. The use of potable water for irrigation of such areas shall be subject to the approval of the Capacity Review Committee. Non-potable irrigation systems shall be considered privately owned and operated systems even when such systems are under the control of a homeowners or property owners association. Accordingly, all parts of such non-potable irrigation systems shall be located outside of public rights-of-way and public easements. All non-potable irrigation systems shall comply with applicable city standards and state regulations (i.e.; pipe colors, minimum separations). Subdivisions having non-potable irrigation systems shall be required to install an approved cross-connection control device (backflow preventer) on all potable water services. Private irrigation systems shall not be installed within city rights-of-way unless the city enters into a written agreement with the entity responsible for the irrigation system for maintenance of the system and for repair of any damage to public facilities resulting from failure of the irrigation system. All irrigation systems, including non-potable systems, are subject to City of Lakeland watering restrictions and Water Management District declarations. 9.9.1.4 Stormwater Management The developer shall install storm drain pipes, catch basins, and all other such facilities of sizes and alignments to provide suitable management of stormwater runoff in conformity with good standards of practice for municipal stormwater management systems, as approved by the Director of Public Works in accordance with the city's Engineering Standards Manual. Stormwater management facilities shall be landscaped in accordance with Sub-Section 4.5.8.3. 9.9.1.5 Underground Electric Distribution Facilities and Services The design of underground electric distribution facilities and service shall be approved by the General Manager of Lakeland Electric. The cost of such underground electrical distribution and service facilities shall be established in accordance with the policies, rules and regulations, adopted by the City Commission and the General Manager of Lakeland Electric, then in effect. 9.9.1.6 Street Lighting Systems Street lighting systems shall be designed by the General Manager of Lakeland Electric. 9.9.1.7 Street Trees Street trees shall be provided within rights-of-way along both sides of streets or roads of all subdivisions. For purposes of this section, street trees shall be those species identified as street trees in Table 4.5-6 (Qualified Trees) and having a minimum height of eight feet and a one-inch diameter trunk at breast height (DBH) or a one and one-half inch diameter trunk at six inches above grade at time of planting. Street trees shall be planted at a ratio of one tree per 50 linear feet of roadway and in accordance with the typical street sections in Figures 9.9-3 and 9.9-4. The required street trees shall be in addition to trees required by Sub-Section 4.5.4. Planting and irrigation plans shall be approved by the Director of Parks and Recreation who shall also have the authority to modify these requirements, including but not limited to situations in which compliance cannot be met due to conflicts with utilities, lighting, driveway connections or other physical site constraints. Street trees shall be planted prior to final acceptance of public subdivision improvements except that street trees adjacent to residential lots shall be planted prior to issuance of a Certificate of Occupancy for each residential unit. 9.9.2 TRAFFIC CONTROL DEVICES 9.9.2.1 Street Name Signs No less than one street name sign per intersection shall be installed by the developer. The street name sign, post and mounting shall meet the current standards established by the city. 9.9.2.2 Traffic Control Signs Regulatory and warning signs shall be installed by the developer. The sign locations and types shall be in accordance with recommendations set forth in the Manual of Uniform Traffic Control Devices. 9.9.2.3 Pavement Marking All pavement marking shall be thermoplastic. All arterial and collector streets shall be striped with centerline and other markings as recommended in the Manual of Uniform Traffic Control Devices. 9.9.2.4 Traffic Signals In certain instances where it has been determined by the city that the development of a subdivision will require traffic signals, the developer will install, or cause to have installed, properly designed and engineered traffic signal systems approved by the city. If more than one subdivision, or if a subdivision and one or more other developments together, necessitate installation of traffic signals, then the city may require each subdivision and/or other development to pay a proportional share of the cost of necessary traffic signals. Proportional shares shall be determined based on the relative amount of traffic each subdivision and/or other development contributes to the need for signals as determined by the city. 9.9.2.5 Method of Installation or Payment If it is mutually agreeable, the city will fabricate and install traffic signs, pavement markings and traffic signals upon receipt of payment from the developer for the installations. 9.9.3 MONUMENTS Plat monuments shall conform to the requirements of Chapter 177 F.S. 9.9.4 PERMITS REQUIRED BY GOVERNMENTAL AGENCIES The developer shall be responsible for obtaining all required environmental, water management and construction permits from governmental regulatory agencies who exercise jurisdiction over activity requiring such a permit. Construction shall not begin prior to the receipt of such permits. Governmental regulatory agencies that may be involved in the issuance of various required permits include but are not necessarily limited to: Southwest Florida Water Management District (SWFWMD) Florida Department of Environmental Protection (FDEP) Florida Department of Transportation (FDOT) Polk County Health Department (PCHD) Polk County Engineering Department (PCED) US Army Corps of Engineers (ACOE) Figure 9.9-1 Street Naming System [image omitted; see the official code] NOTE: Road names which are in alignment with existing roads shall bear the name of existing road. Road names shall not be spelled the same as, nor be phonetically similar to the names of existing roads; neither shall such words as "Way", "Drive", "Court", etc. be used to designate different roads with the provisions of this Sub-Section to prevent the use of such words as "Way, "Drive", "Court", "Circle", etc., to be used to designate different streets of the same name, within the boundaries of the platted subdivision. However, it is the intent that no subdivision have streets named the same as any other subdivision's streets, or any other road or street. Figure 9.9-2 Street Intersection Location Standards [image omitted; see the official code] Figure 9.9-3 Typical 50' Minimum Right-of-Way Section [image omitted; see the official code] Figure 9.9-4 Typical 60' Minimum Right-of-Way Section [image omitted; see the official code]

(Ord. No. 6124, § 2(Att. D), 12-15-25)

Ask a question about Lakeland law

Corpus searches the Lakeland sections it holds and shows the ones that match, with their citations. Free, no sign-in.