For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-3-5 — Discharge limits and standards

Code of Ordinances of Augusta-Richmond County, Georgia (Recodification: codified through Ordinance No. 7807, adopted December 7, 2021) · Augusta Code of Ordinances § 5-3-5

Corpus is an independent public-information project, not the official City of Augusta-Richmond County consolidated government website. Stable reference: corpuslaw.us/code/0f750424-2cd5-411b-b9c7-4ddc24358fff

Sec. 5-3-5. - Discharge limits and standards.

(a) Federal categorical pretreatment standards. The National Categorical pretreatment standards found at 40 CFR Chapter 1, Subchapter N, Parts 405-471 are hereby incorporated. If federal categorical standards establish limits for a pollutant more stringent than those established in subsection (b) hereof, the categorical pretreatment standard will take precedence. In accordance with 40 CFR 403.13, Augusta may adjust a categorical Pretreatment Standard if data specific to that Industrial User indicates it presents factors fundamentally different from those considered by EPA in developing the limit at issue. Where process effluent is mixed prior to treatment with wastewater other than those generated by the regulated process, Augusta will derive fixed alternative (mass or concentration) discharge limitations. These limits will be applied to the mixed effluent in accordance with 40 CFR 403.6(e). Federal Categorical Pretreatment Standards may be expressed as either concentration or mass limits. Equivalent limits (mass or concentration) will be provided so that local, state or federal authorities responsible for enforcement may use either concentration or mass in accordance with 40 CFR 403(6). Augusta may adjust Categorical Pretreatment Standards to reflect the presence of pollutant in the Industrial User's intake water in accordance with 40 CFR 403.15. (b) Local Limitations. No person or User shall discharge wastewater in excess of the concentrations set forth below unless the wastewater discharge permit of the User provides as a special permit condition a higher interim concentration level and a requirement that the User construct a pretreatment facility or institute changes in operations and maintenance procedures to reduce the concentration of pollutants to levels not exceeding the standards set forth in the discharge permit within a fixed period of time. The following pollutant limits are established to protect both the James B. Messerly and Spirit Creek WPCP against pass through and interference. No person shall discharge wastewater containing concentrations in excess of the following: MAXIMUM CONCENTRATION, mg/l Parameter Arsenic, total | 0.86 Cadmium, total | 0.14 Chromium, total | 1.74 Chromium, (VI) | 1.74 Copper, total | 0.38 Lead, total | 0.60 Mercury, total | 0.002 Molybdenum, total | 0.78 Nickel, total | 0.40 Selenium, total | 0.68 Silver, total | 1.82 Zinc, total | 2.46 Cyanide, total | 0.08 Phenols | 2.13 Oil and Grease, Total | 500 Petroleum and Mineral | 100 Benzene | 5.53 Carbon tetrachloride | 0.14 Chlorobenzene | 0.05 Chlorodibromethane | 2.93 Methyl chloride | 0.16 1, 1, 2, 2 Tetrachloroethane | 0.93 Tetrachloroethylene | 0.89 1, 1, 2-Trichloroethane | 3.62 Trichloroethylene | 0.04 2, 4-Dimethylphenol | 2.69 Anthracene | 0.01 Bis (2-ethylhexyl) phthalate | 0.34 1, 2-Dichlorobenzene | 0.01 1, 3-Dichlorobenzene | 0.98 1, 4-Dichlorobenzene | 0.09 Di-n-butyl phthalate | 0.62 Fluoranthene | 3.48 Hexachlorobenzene | 0.000043 Hexachlorobutadiene | 0.08 Pyrene | 0.01 Napthalene | 3.21 1, 1-Dichloroethylene | 0.22 1, 3-Dichloropropylene | 1.01 Phenanthrene | 0.20 Acenapthene | 1.50 1, 1-Dichloroethane | 0.34 1, 2-Dichloropropane | 3.36 2-Methy 4, 6-dinitrophenol | 0.29 Hexachloroethane | 0.39 2-Nitrophenol | 0.29 1, 2, 4-Trichlorobenzene | 0.22 The above limits apply at the point where the wastewater is discharged to the POTW (end-of-the-pipe). All concentrations for metallic substances are for "total" metal unless indicated otherwise. Augusta may limit the discharge of specific substances, listed or not listed above, on a case-by-case basis, if the discharge of that substance is shown to interfere with the operation or performance of the receiving POTW or violates any receiving stream water quality standards. The Assistant Director of Utilities may impose mass limitations in addition to (or in place of) the concentration-based limitations above. Where a user is subject to a categorical pretreatment standard and a local limit for a given pollutant, the more stringent limit or applicable pretreatment standard shall apply. (c) Notification required. Augusta is required to notify the Georgia Environmental Protection Division immediately when any industry in the Centralized Waste Treatment Point Category under 40 CFR 437 currently discharging to the Publicly Owned Treatment Works changes in the following ways: (1) The sewer service is terminated. (2) The industry stops discharging. (d) Augusta's right of revision. Augusta reserves the right to establish, by ordinance or in wastewater discharge permits, more stringent standards or requirements on discharges to the POTW. (e) Special agreement. Augusta reserves the right to enter into special agreements with users setting out special terms under which they may discharge to the POTW. In no case will a special agreement waive compliance with a categorical pretreatment standard or federal pretreatment requirement. However, the user may request a net gross adjustment to a categorical standard in accordance with 40 CFR 403.15. They may also request a variance from the categorical pretreatment standard from the Approval Authority in accordance with 403.13. (f) Dilution. No user shall ever increase the use of process water, or in any way attempt to dilute a discharge, as a partial or complete substitute for adequate treatment to achieve compliance with an applicable pretreatment standard or requirement unless expressly authorized by an applicable pretreatment standard or requirement. The Assistant Director of Utilities may impose mass limitations on users, which he believes may be using dilution to meet applicable pretreatment standards or requirements, or in other cases when the imposition of mass limitations is appropriate. (g) Pretreatment facilities. Users shall provide necessary wastewater treatment as required to comply with this ordinance and shall achieve compliance with all applicable pretreatment standards and requirements set out in this ordinance within the time limitations specified by the EPA, the State, or the Assistant Director of Utilities, whichever is more stringent. Any facilities required to treat wastewater to a level acceptable to Augusta prior to discharging to the POTW, shall be provided, operated, and maintained at the user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to Augusta for review, and shall be acceptable to Augusta before construction of the facility. The review of such plans and operating procedures will in no way relieve the user from the responsibility of modifying the facility as necessary to produce an acceptable discharge to Augusta under the provisions of this ordinance. (h) Deadline for compliance with applicable pretreatment requirements for existing users. Compliance by existing sources (categorical users) covered by Categorical Pretreatment Standards shall be within 3 years of the date the Standard is effective unless a shorter compliance time is specified in the appropriate Standard. Augusta shall establish a final compliance deadline date for any existing user not covered by Categorical Pretreatment Standards or for any categorical user when the local limits for said user are more restrictive than EPA's Categorical Pretreatment Standards. (i) Deadline for compliance with applicable pretreatment requirements for new source or new users. New Source dischargers and "New Users" are required to comply with applicable pretreatment standards within the shortest feasible time (not to exceed 90 days from the beginning of discharge). New Sources and "New Users" shall install and have in operating condition, and shall "start-up" all pollution control equipment required to meet applicable pretreatment standards before beginning to discharge. (j) Compliance schedule for categorical and noncategorical users. Any wastewater discharge permit issued to a categorical user shall not contain a compliance date beyond any deadline date established in EPA's Categorical Pretreatment Standards. Any other existing user or a categorical user that must comply with a more stringent local limit, which is in non-compliance with any local limits shall be provided with a compliance schedule placed in an industrial wastewater permit to ensure compliance within the shortest time feasible. (k) Additional pretreatment measures. (1) Whenever deemed necessary, the Assistant Director of Utilities may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the POTW and determine the user's compliance with the requirements of this ordinance. (2) Grease, oil, and sand interceptors shall be provided when, in the opinion of the Assistant Director of Utilities, they are necessary for the proper handling of wastewater containing excessive amounts of grease and oil, or sand; except that such interceptors shall not be required for residential users. All interception units shall be of type and capacity approved by the Assistant Director of Utilities and shall be so located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired regularly, as needed, by the user at his expense. (3) Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. (l) Accidental discharge/slug control. The Assistant Director of Utilities may require any user to develop and implement an accidental discharge/slug control plan. Where deemed necessary by Augusta, facilities to prevent accidental discharge or slug discharges of pollutants shall be provided and maintained at the user's cost and expense. An accidental spill prevention plan/slug control plan showing facilities and operating procedures to provide this protection shall be submitted to Augusta for review and approval before implementation. Augusta shall determine which user is required to develop a plan and require said plan to be submitted within 30 days after notification by Augusta. Each user shall implement its ASPP as submitted or as modified after such plan has been reviewed and approved by Augusta. Review and approval of such plans and operating procedures by Augusta shall not relieve the user from the responsibility to modify its facility as necessary to meet the requirements of Section 5-3-5. (1) Any user required to develop and implement an accidental discharge/slug control plan shall submit a plan which addresses, at a minimum, the following: a. Description of discharge practices, including non-routine batch discharges; b. Description of stored chemicals; c. Procedures for immediately notifying the POTW of any accidental or slug discharge. Such notification must also be given for any discharge which would violate any of the standards in Sections 5-3-4 and 5-3-5 of this ordinance; and d. Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. (2) Users shall notify Augusta immediately upon becoming aware of the occurrence of a "slug" or "accidental discharge" of substances regulated by this Ordinance. The notification shall include location of discharge, date and time thereof, type of waste, concentration and volume, and corrective actions. Any affected user shall be liable for any expense, loss, or damage to the POTW, in addition to the amount of any fines imposed on Augusta on account thereof under state or federal law. (3) Within five (5) days following an accidental discharge, the user shall submit to the Assistant Director of Utilities a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, fish kills, or any other damage to person or property; nor shall such notification relieve the user of any fines, civil penalties, or other liability which may be imposed by this Ordinance or other applicable law. (4) Signs shall be permanently posted in conspicuous places on the user's premises advising employees whom to call in the event of a slug or accidental discharge. Employers shall instruct all employees who may cause or discover such a discharge with respect to emergency notification procedures.

( Ord. No. 6557 , § 1, 10-3-2002; Ord. No. 6764 , § 1, 1-18-2005)

Ask a question about Augusta-Richmond County consolidated government law

Corpus searches the Augusta-Richmond County consolidated government sections it holds and shows the ones that match, with their citations. Free, no sign-in.