Sec. 5-3-8. - Reporting requirements section.
(a) Baseline monitoring reports. (1) Within either one hundred and eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4) (whichever is water) existing categorical users currently discharging to or scheduled to discharge to the POTW, shall be required to submit to Augusta a report which contains the information listed in paragraph (2), below. At least ninety 90 days prior to commencement of their discharge, New Sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to Augusta a report which contains the information listed in paragraph 2 a-e, below. A New Source shall also be required to report the method of pretreatment it intends to use to meet applicable categorical standards. A New Source shall also give estimates of its anticipated flow and quantity of pollutants discharged. (2) Users described above shall submit the information set forth below. a. Identifying Information. The name and address of the facility, including the name of the operator and owner. b. Environmental Permits. A list of any environmental control permits held by or for the facility. c. Description of Operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes. d. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). e. Measurement of Pollutants. 1. The categorical pretreatment standards applicable to each regulated process. 2. The results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by Augusta) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Section 5-3-9 of this ordinance. 3. Sampling must be performed in accordance with procedures set out in Section 5-3-9 of this ordinance. f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional Operation and Maintenance (O&M) and/or additional pretreatment, is required to meet the pretreatment standards and requirements. g. Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in Section 5-3-8(d) of this ordinance. h. Signature and Certification. All baseline-monitoring reports must be signed and certified in accordance with Section 5-3-7(d) of this ordinance. (b) Final compliance report (initial compliance report). (1) Within 90 days following the date for final compliance by the Significant Industrial User with applicable pretreatment standards and requirements set forth in this ordinance, in a wastewater discharge permit, or within 30 days following commencement of the introduction of wastewater into the POTW by a New Source of "New Users" considered by Augusta to fit the definition of SIU, the affected user shall submit to Augusta a report containing the information outlined in Section 5-3-7(c). (2) For users subject to equivalent mass or concentration limits established by Augusta in accordance with procedures established in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. (c) Periodic compliance report. (1) Any user that is required to have an industrial waste discharge permit and performs self-monitoring shall submit to Augusta during the months of June and December, unless required on other dates or more frequently by Augusta, a report indicating the nature of the effluent over the previous reporting period. The frequency of monitoring shall be as prescribed within the industrial waste discharge permit. At a minimum, users shall sample their discharge at least twice per year. The report shall include a record of the concentrations (and mass if specified in the wastewater discharge permit) of the pollutants listed in the wastewater discharge permit that were measured and a record of all flow measurements (average and maximum) taken at the designated sampling locations, and shall also include any additional information required by this ordinance or the wastewater discharge permit. Production data shall be reported if required by the wastewater discharge permit. Both daily maximum and average concentration (or mass, were required) shall be reported. If a user monitors any pollutant at the location designated in the wastewater discharge permit more frequently than required using approved analytical methods as specified in 40 CFR Part 136, the results of such monitoring shall be included in calculations and reporting of values required during the reporting period. Such increased monitoring frequency shall also be indicated. Augusta may require more frequent monitoring or the monitoring of other pollutants not required in the permit by written notification. (2) If a user sampled and analyzed more frequently than what was required by Augusta or by this ordinance, using methodologies in 40 CFR Part 136, it must submit all results of sampling and analysis of the discharge during the reporting period. (3) Any user subject to equivalent mass or concentration limits established by Augusta or by unit production limits specified in the applicable categorical standards, shall report production data as outlined in Section 5-3-8(b). (4) If Augusta calculated limits to factor out dilution flows or non-regulated flows, the user will be responsible for providing flows from the regulated process flows, dilution flows and non-regulated flows. (5) Flows shall be reported on the basis of actual measurement; provided, however, that Augusta may accept reports of average and maximum flows estimated by verifiable techniques if Augusta determines that an actual measurement is not feasible. (6) Sampling shall be representative of the user's daily operations and shall be taken in accordance with the requirements specified in Section 5-3-9. (7) Augusta may require reporting by users that are not required to have an industrial wastewater discharge permit if information or data is needed to establish a sewer charge, determine the treatability of the effluent or determine any other factor which is related to the operation and maintenance of the sewer system. (8) Augusta may require self-monitoring by the user or, if requested by the user, may agree to perform the periodic compliance monitoring needed to prepare the periodic compliance report required under this section. If Augusta agrees to perform such periodic compliance monitoring, it may charge the user for such monitoring, based upon the costs incurred by Augusta for the sampling and analyses. Any such charges shall be added to the normal sewer charge and shall be payable as part of the sewer bills. Augusta is under no obligation to perform periodic compliance monitoring for a user. (d) Compliance schedules for meeting applicable pretreatment standards. (1) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (2) No increment referred to in paragraph (1) of this section shall exceed 9 months. (3) Net later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to Augusta including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than 9 months elapse between such progress reports. (e) Notification of significant production changes. Any user operating under a wastewater discharge permit incorporating equivalent mass or concentration limits shall notify Augusta within 2 business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not providing a notice of such anticipated change will be required to comply with the existing limits contained in its wastewater discharge permit. (f) Hazardous waste notification. (1) Industrial user shall notify Augusta, the EPA Regional Waste Management Division Director, and State hazardous waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise disposed of, would be a hazardous waste under 40 CFR part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch or other). If the industrial user discharge more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the industrial user; an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during the calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve months. All notifications must take place within 180 days of the effective date of this rule. Industrial users who commence discharging after the effective date of this rule shall provide the notification no later than 180 days after the discharge of the listed characteristic hazardous waste. Any notification under this paragraph need to be submitted only once for each hazardous waste discharged. However, notification of changed discharges must be submitted under 40 CFR 403.12(j), the notification requirement in this section does not apply to pollutants already reported under the self monitoring requirements of 40 CFR 403.12(d), and (e). (2) Users are exempt from the requirements of paragraph (f) (1) of this section during a calendar month in which they discharge no more than fifteen kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than one such quantities of any hazardous waste do not require additional notification. (3) In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user must notify Augusta, the EPA Regional Waste Management Waste Division Director, and Georgia's hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. (4) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous waste generated to the degree it has determined to be economically practical. Such notification shall include: a. The name of the hazardous waste as set forth in 40 CFR Part 261, b. The EPA Hazardous waste number, c. The type of discharge (continuous, batch, or other), d. If an industrial user discharges more than 100 kilograms of such waste per calendar per month to the sewer system, the notification shall also contain the following information to the extent it is known or readily available to the industrial user: 1. An identification of the hazardous constituents contained in the wastes, 2. An estimation of the mass and concentration of such constituents in the wastestreams discharged during that calendar month, and 3. An estimation of the mass of constituents in the wastestreams expected to be discharged during the following 12 months. (g) Notice of potential problems, including accidental spills, slug loadings. Any user shall notify Augusta immediately of all discharges that could cause problems to the POTW, including any slug loadings, as defined in Section 5-3-1. The notification shall include the concentration and volume and corrective action. Steps being taken to reduce any adverse impact should also be noted during the notification. Any user who discharges a "slug" (or slugs) of pollutants shall be liable for any expense, loss, or damage to the POTW, in addition to the amount of any fines imposed on Augusta under state or federal law. (h) Non-compliance reporting. If sampling performed by a user indicates a violation, the user shall notify Augusta within 24 hours of becoming aware of the violation. The user shall also repeat the sampling within 5 days and submit the results of the repeat analysis to Augusta within 30 days after becoming aware of the violation, except the user is not required to resample if: (1) Augusta performs sampling at the user at a frequency of at least once per month, or (2) Augusta performs sampling at the user between the time when the user performs its initial sampling and the time when the user receives the results of this sampling. (i) Notification of changed discharge. All users shall notify August prior to any substantial change in volume or characteristics of pollutants in their discharge, including significant manufacturing process changes, pretreatment modifications, and the listed or characteristic hazardous wastes for which the user has submitted initial notification under 40 CFR 403.12(p). Formal written notification shall follow within thirty days of such introduction. (j) TTO reporting. Categorical users which are required by EPA to eliminate and/or reduce the levels of toxic organics (TTOs) discharged into the sewer system must follow the Categorical Pretreatment Standards for that industry. Those users must also meet the following requirements: (1) Must sample, as part of the application requirements, for all the organics listed under the TTO limit (no exceptions); (2) No TTOs Used at the Facility, or the user elects to develop a solvent management plan in lieu of continuously monitoring for TTO: a. The user must routinely submit a certification statement as part of its self-monitoring report that there has been no dumping of concentrated toxic organic into the wastewater and that it is implementing a solvent management plan as approved by Augusta. (3) Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to Augusta as the Assistant Director of Utilities may require. (k) Record keeping. Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this ordinance and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method, and time of sampling and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three (3) years. This period shall be automatically extended for the duration of any litigation concerning the user or POTW, or where the Assistant Director of Utilities has specifically notified the user of a longer retention period.
( Ord. No. 6557 , § 1, 10-3-2002)
Ask a question about Augusta-Richmond County consolidated government law
Corpus searches the Augusta-Richmond County consolidated government sections it holds and shows the ones that match, with their citations. Free, no sign-in.