For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 109-80 — Definitions

City Code of the City of Johns Creek, Georgia (Codified through Ordinance No. 2025-06-18, adopted June 9, 2025. (Supp. No. 23, Update 1)) · Johns Creek City Code § 109-80

Corpus is an independent public-information project, not the official City of Johns Creek website. Stable reference: corpuslaw.us/code/4972dde4-2d93-4519-a4bd-09bf64ee9e8c

Sec. 109-80. - Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section. Other terms used but not defined in this Article shall be interpreted based on how such terms are defined and used in the GSMM and the city's MS4 permit. Administrator means the person appointed to administer and implement this article on post-construction stormwater management for new development and redevelopment in accordance with subsection 109-79(d). Applicant means a person submitting a land development application and plan for approval. BMP or best management practice means both structural devices to store or treat stormwater runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the state. BMP landscaping plan means a design for vegetation and landscaping that is critical to the performance and function of the BMP including how the BMP will be stabilized and established with vegetation. It shall include a layout of plants and plant names (local and scientific). Channel means a natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water. Conservation easement means an agreement between a land owner and the city or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership. Detention means the temporary storage of stormwater runoff in a stormwater detention facility for the purpose of controlling the peak discharge. Detention facility means a structure designed for the storage and gradual release of stormwater runoff at controlled rates. Developer means a person who undertakes land development activities. Development means new development or redevelopment. Director means director of the city community development department. Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement. Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities. Extended detention means the storage of stormwater runoff for an extended period of time. Extreme flood protection means measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more. Flooding means a volume of surface water that exceeds the banks or walls of a BMP or channel and that overflows onto adjacent lands. Greenspace or open space means permanently protected areas of the site that are preserved in a natural state. GSMM means the latest edition of the Georgia Stormwater Management Manual, Volume 2: Technical Handbook, and its Appendices. Hotspot means a land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in stormwater runoff. As defined by the administrator, hotspot land use may include gasoline stations, vehicle service and maintenance areas, industrial facilities (both permitted under the industrial stormwater general permit and others), material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use. Hydrologic soil group (HSG) means a natural resource conservation service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff. Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface. Industrial stormwater general permit means the National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies based on standard industrial classification (SIC) code. Infiltration means the process of percolating stormwater runoff into the subsoil. Inspection and maintenance agreement means a written agreement providing for the long-term inspection, operation and maintenance of stormwater management system and its components on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project. Land development application means the application for a land development permit on a form provided by the city along with the supporting documentation required in subsection 109-81(d). Land development permit means the authorization necessary to begin construction related, land-disturbing activity. Land disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into state water or onto lands within the state, including but not limited to clearing, digging, dredging, grading, stripping, removal of vegetation, excavating, transporting and filling of land, construction, paving and any other installation of impervious cover. Land disturbing activity does not include agricultural practices as described O.C.G.A. § 12-7-17(5) or silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities. Linear feasibility program means a feasibility program developed by the city and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when implementation of stormwater management standards for linear transportation projects being constructed by the city is infeasible. Linear transportation projects means construction projects on traveled ways including but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways. MS4 Permit means the NPDES permit issued by Georgia Environmental Protection Division for discharges from the city's municipal separate storm sewer system. New development means land disturbing activities, structural development (construction, installation or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site. Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. Nonstructural stormwater management practice or nonstructural practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions and vegetated channels. Off-site facility means a stormwater management facility located outside the boundaries of the site. Onsite facility means a stormwater management facility located within the boundaries of the site. Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e., flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through 25-year frequency storm events. Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site. Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity. Post-construction stormwater management means stormwater best management practices that are used on a permanent basis to control and treat runoff once construction has been completed in accordance with a stormwater management plan. Post-development means the conditions anticipated to exist on site immediately after completion of the proposed development. Practicability policy means the latest edition of the Metropolitan North Georgia Water Planning District's Policy on Practicability Analysis for Runoff Reduction. Pre-development means the conditions that exist on a site immediately before the implementation of the proposed development. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being approved or permitted shall establish pre-development conditions. Pre-development hydrology means (a) for new development, the runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site immediately before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property. Previously developed site means a site that has been altered by paving, construction, and/or land disturbing activity. Redevelopment means structural development (construction, installation, or expansion of a building or other structure), creation or addition of impervious surfaces, replacement of impervious surfaces not as part of routine maintenance, and land disturbing activities associated with structural or impervious development on a previously developed site. Redevelopment does not include such activities as exterior remodeling. Regional stormwater management facility or regional facility means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for onsite controls is either eliminated or reduced. Routine maintenance means activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Runoff means stormwater runoff. Site means an area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of development, the site includes all areas of land covered under an applicable land development permit. Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management. Stormwater concept plan means an initial plan for post-construction stormwater management at the site that provides the groundwork for the stormwater management plan including the natural resources inventory, site layout concept, initial runoff characterization, and first round stormwater management system design. Stormwater management facility means any infrastructure that effects stormwater management and which controls or conveys stormwater runoff. Stormwater management measure means any stormwater management facility or nonstructural stormwater practice. Stormwater management plan means a plan for post-construction stormwater management at the site that meets the requirements of subsection 109-81(c) and is included as part of the land development application. Stormwater management standards means those standards set forth in subsection 109-82. Stormwater management system means the entire set of non-structural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare. Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site. Stormwater runoff means the flow on the surface of the ground, resulting from precipitation. Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff. Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.

(Ord. No. 2020-11-30, 11-2-2020)

Ask a question about Johns Creek law

Corpus searches the Johns Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.