§ 109-81 — Permit procedures and requirements

City Code of the City of Johns Creek, Georgia (Codified through Ordinance No. 2025-06-18, adopted June 9, 2025. (Supp. No. 23, Update 1)) · Johns Creek City Code § 109-81

Corpus is an independent public-information project, not the official City of Johns Creek website. Stable reference: corpuslaw.us/code/62c0aa40-b730-44ed-9c95-caeb2e879b94

Sec. 109-81. - Permit procedures and requirements.

(a) Permit application requirements. No owner or developer shall perform any land disturbing activities without first meeting the requirements of this article prior to commencing the proposed activity. Unless specifically exempted by this article, any owner or developer proposing a land disturbing activity shall submit to the city community development department a permit application on a form provided by the city for that purpose or as part of the land disturbance or building permitting process. Unless otherwise exempted by this article, a permit application shall be accompanied by the following items in order to be considered: (1) Stormwater concept plan and pre-submittal meeting certification in accordance with subsection (b) of this section; (2) Stormwater management plan in accordance with subsection (c) of this section; (3) Inspection and maintenance agreement in accordance with section 109-83; (4) Performance bond or surety, if deemed applicable; and (5) Permit application and plan review fees in accordance with subsections (d) and (e) of this section. (b) Stormwater concept plan and pre-submittal meeting. Before a land development permit application is submitted, an applicant shall request a pre-submittal meeting with the city community development department. The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and inventory (GSMM Section 2.4.2.4) or the stormwater concept plan (GSMM Section 2.4.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system, including green infrastructure/low impact development designs, before formal site design engineering is commenced. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the city community development department when applying for a determination of infeasibility through the practicability policy. (1) The stormwater concept plan shall be prepared using the minimum following steps: a. Develop the site layout using better site design techniques, as applicable (GSMM Section 2.3). b. Calculate preliminary estimates of the unified stormwater sizing criteria requirements for stormwater runoff quality/reduction, channel protection, overbank flooding protection and extreme flood protection (GSMM Section 2.2). c. Perform screening and preliminary selection of appropriate best management practices and identification of potential siting locations (GSMM Section 4.1). (2) The stormwater concept plan shall contain: a. Common address and legal description of the site; b. Vicinity map; and c. Existing conditions and proposed site layout mapping and plans (recommended scale of 1" = 50'), which illustrate at a minimum: 1. Existing and proposed topography (minimum of two-foot contours); 2. Perennial and intermittent streams; 3. Mapping of predominant soils from USDA soil surveys; 4. Boundaries of existing predominant vegetation and proposed limits of clearing and grading; 5. Location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.); 6. Location of existing and proposed roads, buildings, parking areas and other impervious surfaces; 7. Existing and proposed utilities (e.g., water, sewer, gas, electric) and easements; 8. Preliminary estimates of unified stormwater sizing criteria requirements; 9. Preliminary selection and location, size, and limits of disturbance of proposed BMPs; 10. Location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; 11. Flow paths; 12. Location of the boundaries of the base flood floodplain, future conditions floodplain, and the floodway (as applicable) and relationship of site to upstream and downstream properties and drainage; and 13. Preliminary location and dimensions of proposed channel modifications, such as bridge or culvert crossings. (c) Stormwater management plan requirements. (1) The stormwater management plan shall contain the items listed in this part and be prepared under the direct supervisory control of either a registered professional engineer or a registered landscape architect licensed in the state of Georgia. Items (c), (d), (e), and (f) shall be sealed and signed by a registered professional engineer licensed in the state of Georgia. The overall site plan must be stamped by a design professional licensed in the state for such purpose. (GSMM Section 2.4.2.7). a. Natural resources inventory. b. Stormwater concept plan. c. Existing conditions hydrologic analysis. d. Post-development hydrologic analysis. e. Stormwater management system. f. Downstream analysis. g. Erosion and sedimentation control plan. h. BMP landscaping plan. i. Inspection and maintenance agreement. j. Evidence of acquisition of applicable local and non-local permits. k. Determination of infeasibility (if applicable). (2) For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards the following must also be included in the stormwater management plan for existing stormwater management structures. a. As-built drawings. b. Hydrology reports. c. Current inspection of existing stormwater management structures with deficiencies noted. d. BMP landscaping plans. (d) Application procedure. Land development applications are handled as part of the process to obtain the land disturbance permit pursuant to chapter 109 and chapter 113 of the city's land development ordinances or building permit pursuant to chapter 105 of the city's buildings and building regulations ordinance, as applicable. Before any person begins development on a site, the owner of the site shall first obtain approval in accordance with the following procedures: (1) File a land development application with the city community development department with the following materials: a. The stormwater management plan prepared in accordance with subsection 109-81(c); b. A certification that the development will be performed in accordance with the stormwater management plan once approved; c. A runoff reduction alternative design infeasibility criteria form and required documentation shall be submitted for review and determination by the city land development staff, if the entire runoff reduction volume cannot be achieved on part or all of a project; and d. An acknowledgement that applicant has reviewed the city's form of inspection and maintenance agreement and that applicant agrees to sign and record such inspection and maintenance agreement before the final inspection. (2) Permit applications shall include the items set forth in subsection (a) of this section above (two copies of the stormwater management plan and the inspection maintenance agreement, if applicable, shall be included). (3) The city community development department shall inform the applicant whether the application, stormwater management plan and inspection and maintenance agreement are approved or disapproved. (4) If either the permit application, stormwater management plan or inspection and maintenance agreement are disapproved, the city community development department shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event subparagraph (3) above and this subparagraph shall apply to such resubmittal. (5) Upon a finding by the city community development department that the permit application, stormwater management plan and inspection and maintenance agreement, if applicable, meet the requirements of this article, the city community development department may issue a permit for the land development project, provided all other legal requirements for the issuance of such permit have been met. The stormwater management plan included in such applications becomes the approved stormwater management plan. The issuance of a land development, building or land disturbance permit in conjunction with a related inspection and maintenance agreement, does not indicate or create an acceptance by the city of any inspection or maintenance responsibilities under the terms of said inspection or maintenance agreement. (6) Notwithstanding the issuance of the permit, in conducting the land development project, the applicant or other responsible person shall be subject to the following requirements: a. The applicant shall comply with all applicable requirements of the approved plan and this article and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan; b. The land development project shall be conducted only within the area specified in the approved plan; c. The city community development department shall be allowed to conduct periodic inspections of the project; d. No changes may be made to an approved plan without review and written approval by the city community development department; and e. Upon completion of the project, the applicant or other responsible person shall submit the engineer's report and certificate and as-built plans required by section 109-83. (7) Compliance with the approved stormwater management plan. All development shall be: a. Consistent with the approved stormwater management plan and all applicable land disturbance and building permits; and b. Conducted only with the area specified in the approved stormwater management plan. (e) Application fee. The fee for review of any land development application shall be based on the fee structure established by the city and payment shall be made prior to the issuance of any building or land disturbance permit for the development. (f) Modifications for offsite facilities. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an offsite or regional facility. The offsite or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by onsite practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the offsite or regional stormwater facility. In addition, onsite measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the offsite facility. (1) A stormwater management plan must be submitted to the city community development department which shows the adequacy of the offsite or regional facility. (2) To be eligible for a modification, the applicant must demonstrate to the satisfaction of the director that the use of an offsite or regional facility will not result in the following impacts to upstream or downstream areas: a. Increased threat of flood damage to public health, life and property; b. Deterioration of existing culverts, bridges, dams and other structures; c. Excessive (damaging) streambank or streambed erosion or siltation; d. Degradation of instream biological functions or habitat. e. Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations; or f. Premature loss of overbank trees, critical vegetation or utilities.

(Ord. No. 2020-11-30, 11-2-2020)