§ 109-83 — Inspections to ensure plan compliance during construction
City Code of the City of Johns Creek, Georgia (Codified through Ordinance No. 2025-06-18, adopted June 9, 2025. (Supp. No. 23, Update 1)) · Johns Creek City Code § 109-83
Corpus is an independent public-information project, not the official City of Johns Creek website. Stable reference: corpuslaw.us/code/5cc1edbb-107f-4234-8c82-b3f1af02404e
Sec. 109-83. - Inspections to ensure plan compliance during construction.
(a) Periodic inspections of the stormwater management system during construction shall be conducted by the staff of the city or conducted and certified by a professional engineer who has been approved by the city. Inspections shall use the approved stormwater management plan for establishing compliance. All inspections shall be documented with written reports that contain the following information: (1) The date and location of the inspection; (2) Whether the stormwater management system is in compliance with the approved stormwater management plan; (3) Variations from the approved stormwater management plan; and (4) Any other variations or violations of the conditions of the approved stormwater management plan. If any variations or violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. (b) Final inspection; as-built drawings; delivery of inspection and maintenance agreement. Upon completion of a development, the applicant is responsible for: (1) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis; (2) Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer; (3) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan; and (4) Delivering to the city a signed inspection and maintenance agreement that has been recorded by the owner in the property record for all parcel(s) that make up the site. The required certification under part (1) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the city community development department with the request for a final inspection. The city community development department shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities.
(Ord. No. 2020-11-30, 11-2-2020)
Ask a question about Johns Creek law
Corpus searches the Johns Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.
