For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-37 — Basic stormwater management design criteria

Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 23-37

Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/19395230-9435-44ff-9fb3-6131c6659a05

Sec. 23-37. - Basic stormwater management design criteria.

(a) Minimum control requirements. All stormwater management practices will be designed so that the specific storm frequency storage volumes (e.g., recharge, water quality, channel protection, ten (10) year, one hundred (100) year) as identified in the LDM are met, unless the applicant is exempt from such requirements. In addition, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the Authority reserves the right to impose any and all additional requirements deemed necessary to control the volume, timing, and rate of runoff. (b) Site design feasibility. Stormwater management practices for a site shall be chosen based on the physical conditions of the site and considering any limitations of downstream stormwater systems. Applicants shall consult the current LDM for guidance on the factors that determine site design feasibility when selecting a stormwater management practice. (c) Control and conveyance issues. All stormwater management practices shall be designed to control and convey stormwater to allow for the maximum removal of pollutants and reduction in flow velocities. The current LDM shall provide detailed guidance on the requirements for control and conveyance for each of the approved stormwater management practices. (d) Landscaping plans required. All stormwater management practices that utilize wetlands vegetation as part of the functional treatment process (e.g., constructed wetlands, etc.) must submit a separate landscaping plan detailing both the vegetation to be in the practice and how and who will manage and maintain this vegetation. This plan must be prepared by an individual having a professional certification by the Society of Wetlands Scientists and having completed three projects of a similar nature that have been successfully implemented or equivalent qualifications as determined by the Authority. (e) Maintenance agreements. The components of the stormwater management system that will not be dedicated to and accepted by the Authority, including all drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an inspection and maintenance agreement to ensure that they continue to function as designed. All new development and redevelopment sites shall prepare a comprehensive inspection and maintenance agreement for the on-site stormwater management system. This plan shall be written in accordance with the requirements in Section 23-41. (f) Non-structural stormwater practices. The use of non-structural stormwater treatment practices is encouraged in order to minimize the reliance on structural practices. Credit in the form of reductions in the amount of stormwater that must be managed can be earned through the use of non-structural practices that reduce the generation of stormwater from the site. These non-structural practices are explained in detail in the current LDM and applicants wishing to obtain credit for use of non-structural practices must ensure that these practices are documented and that appropriate guidance as to their location and maintenance requirements is given to subsequent property owners.

(Ord. No. O-22-0016, § 3(Exh. C), 4-5-2022)

Ask a question about Macon-Bibb County law

Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.