§ 23-39 — Requirements for stormwater management plan approval
Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 23-39
Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/899fc5d8-0ad2-40d0-8dee-b3c55095951f
Sec. 23-39. - Requirements for stormwater management plan approval.
(a) Stormwater management plan required for all developments. (1) No application for development will be approved unless it includes a stormwater management plan detailing in concept how runoff and associated water quality impacts resulting from the development will be controlled or managed. This plan must be certified by a professional engineer or landscape architect licensed in the state of Georgia. Further, pursuant to the provisions contained in O.C.G.A. § 43-15-2, as amended, a surveyor registered in the state may prepare hydrologic studies and design stormwater drainage systems. Said plan must indicate whether stormwater will be managed on-site or off-site and if on-site, the general location and type of practices. (2) The stormwater management plan(s) shall be referred for comment to all other interested agencies, and any comments must be addressed in a final stormwater management plan. This final plan must include the submittal checklist found in Appendix A of the LDM and be signed by a professional engineer, landscape architect, or surveyor licensed in the state, who will verify that the design of all stormwater management practices meet the submittal requirements of the current LDM. (3) No development permits shall be issued until a satisfactory final stormwater management plan, or a waiver thereof, shall have undergone a review and been approved by the Authority after determining that the plan or waiver is consistent with the requirements of this article. (b) Stormwater management plan requirements. (1) A stormwater management plan shall be required with all land disturbance activity (LDA) permit applications and will include sufficient information (e.g., maps, drainage areas, hydrologic calculations, etc.) to evaluate the environmental characteristics of the project site, the potential impacts of all proposed development of the site— both present and future—on the water resources, and the effectiveness and acceptability of the measures proposed for managing stormwater generated at the project site. The intent of this planning process is to determine the type of stormwater management measures necessary for the proposed project, and ensure adequate planning for management of stormwater runoff from future development. (2) To accomplish this goal the applicant shall prepare a design report which shall include elements sufficient to ensure compliance with this article as outlined in the current LDM. The Authority reserves the right to extend these requirements to ensure compliance with this article if the requirements in the current LDM prove to be insufficient. However, in these cases, the Authority must provide a written explanation of the additional elements needed to the applicant. (c) Performance bond/security. (1) The Authority may, at its discretion, require the submittal of a performance security or bond in order to ensure that the stormwater practices are installed by the permit holder as required by the approved stormwater management plan. The amount of the installation performance security shall be the total estimated construction cost of the stormwater management practices approved under the permit, plus twenty-five (25) percent as agreed to by the applicant and the Authority. The performance security shall contain forfeiture provisions for failure to complete work specified in the stormwater management plan. (2) The installation performance security shall be released in full only upon submission of "as-built plans" and written certification by a professional engineer, landscape architect, or registered surveyor licensed in the state that the stormwater practice will function in accordance with the approved plan and other applicable provisions of this article. The Authority will make a final inspection of the stormwater practice to ensure that it is in compliance with the approved plan and the provisions of this article. Provisions for a partial prorata release of the performance security based on the completion of various development stages may be done at the discretion of the Authority. (d) Errors and omissions insurance. The Authority shall require a professional engineer, landscape architect, or registered surveyor licensed in the state submitting plans for review under this chapter to maintain in full force and effect errors and omissions liability insurance in the amount of one million dollars ($1,000,000.00) per occurrence while practicing in Macon-Bibb County. A valid certificate of insurance shall be submitted to the Authority to evidence that such insurance has been procured and is in force.
(Ord. No. O-22-0016, § 3(Exh. C), 4-5-2022)
Ask a question about Macon-Bibb County law
Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.