§ 23-40 — Construction inspection
Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 23-40
Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/829c4c36-95bb-4920-b9d9-63f131e7e0c2
Sec. 23-40. - Construction inspection.
(a) Notice of construction commencement. The applicant must notify the Authority in advance before the commencement of construction. If any violations are found, the property owner shall be notified in writing of the nature of the violation and the required corrective actions. No added work shall proceed unless permitted by the Authority until any violations are corrected and all work previously completed has received approval by the Authority. (b) As-built plans. All applicants are required to submit actual "as-built" plans for any stormwater management practices located both on-site and off-site after final construction is completed in a format specified in the current LDM. The plan must show the final design specifications for all stormwater management facilities and must be certified by a professional engineer, landscape architect, or registered surveyor licensed in the state. A final inspection by the Authority is required before the release of any performance securities can occur. (c) Landscaping and stabilization requirements. All requirements of the Authority's soil erosion and sedimentation control ordinance for stabilizing the site during construction and after completion of final grading shall apply.
(Ord. No. O-22-0016, § 3(Exh. C), 4-5-2022)
Ask a question about Macon-Bibb County law
Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.