For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.2.4 — General Requirements

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 21.2.4

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/d3f225d7-138f-41de-8c5c-d03e73a61795

Section 21.2.4 - General Requirements.

(a) An application shall be required for the construction or placement of all new wireless transmission facilities and new co-location facilities, antennas or towers within the city limits. Approval of any application for the construction of a tower or placement of an antenna shall be based on consideration of the following factors: (1) Proximity to residential structures and residential district boundaries; (2) The proposed height of the tower; (3) Nature of uses on adjacent properties; (4) Surrounding topography, tree coverage and foliage; (5) Design of the facility, with particular reference to design characteristics which have the effect of reducing or eliminating visual obtrusiveness; (6) Proposed ingress and egress; (7) Availability of suitable existing towers, other structures, or alternative technologies (microcells) not requiring the use of towers or structures; (8) Demonstrated need for the telecommunications facility at the specified site; (9) Utilization of the City of Roswell Master Siting Plan, as amended. (b) All applications submitted to the community development department shall include a complete inventory of the applicant's existing wireless transmission facilities including towers and receivers/transmitters located within the City of Roswell or a one-half-mile radius surrounding the city limits, including each asset's location (plane coordinates), height and co-location usage or capabilities, and any special design features. The city shall utilize such information, subject to any restrictions on disclosure requested by the applicant, to promote co-location alternatives for other applicants. (c) At the time of filing the application for construction or placement of a wireless transmission facility, the applicant shall provide a site plan and information regarding tower or accessory structure location, neighboring uses and proposed landscaping as described below. Additional documentation to be submitted with the site plan and certified by an experienced radio frequency engineer shall delineate coverage and propagation zones, identify type of antenna and mounting location, specify type of band currently in use, and state co-location capabilities. (1) The scaled site plan shall clearly indicate the location, type and height of the proposed tower or accessory structure to be utilized, on-site land uses and zoning, adjacent land uses and zoning including proximity to historic or scenic view corridors, adjacent roadways, proposed means of access, setbacks for property lines, elevation drawings of the proposed tower, accessory structure and any other structures, topography, parking, and other information deemed necessary by council to assess compliance with this ordinance. (2) Legal description of the parent tract and leased parcel (if applicable). (3) A definition of the area of coverage and radio frequency goals to be served by the antenna or tower and the extent to which such antenna or tower is needed for coverage and/or capacity. (4) The setback distance between the proposed wireless transmission facility and the nearest residential unit or residentially used structure. (5) Structural integrity analysis where antennas and equipment will be attached to an existing structure (6) Landscaping shall be designed in such a way as to preserve existing mature growth and to provide in the determination of the design review board, a suitable buffer of plant materials that mitigates the view of the telecommunications facility and accessory structures from surrounding property. (d) Each application shall be accompanied by a fee of $1,000.00 to offset the costs associated with processing such application. In addition, applicants shall be responsible for independent engineering costs incurred by the city which exceed such fee up to an additional $2,000.00, if requested by the city. The applicant shall be responsible for additional fees throughout the process as described further within this ordinance. All fees are subject to change as amended by the mayor and city council by resolution. (e) Landscaping plans and the design and placement of the wireless transmission facility on an approved site shall require review and approval of the Roswell Design Review Board prior to issuance of a building permit to insure architectural and aesthetic compatibility with the surrounding area. (f) Prior to issuance of a building permit, compliance with Section 106 of the National Historic Preservation Act, 16 U.S.C. § 461 et seq. shall be demonstrated. (g) In approving any application, the zoning director, design review board, or council may impose additional conditions to the extent determined necessary to minimize adverse effects on adjoining properties.

(Ord. No. 2014-02-03, § 1, Amended 2/24/2014; 2003-07-17, Amended, 07/07/2003)

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.