For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.2.6 — Approval Process

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 21.2.6

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/6230a3e3-e6ab-4d75-85c0-495edba31b85

Section 21.2.6 - Approval Process.

(a) Subject to certification by the zoning director of compliance with the general requirements and standards enumerated above and with the consent of council, the following uses are subject to expedited approval, which shall be defined as approval within thirty (30) days of receiving applications, supporting engineering certifications and lease approval, if any, without the necessity of public hearing: (1) Antennas or towers located on property owned, leased, or otherwise controlled by the City of Roswell provided accessory structures are located underground, where technically feasible, and a license, permit or lease authorizing such tower is thereafter approved by City of Roswell. (2) Installing an antenna on an existing structure, so long as said installation is considered to be a stealth technology installation that does not significantly change the profile of the existing structure and so that the installation is not readily noticeable to the untrained eye. Such installations including cables leading to the antennas shall be painted to match the paint and colors on the existing structure and shall not protrude from the existing structure in a noticeable fashion. (3) Co-location by installing an antenna on any existing tower or alternative tower structure. (4) Replacing an existing tower with a new tower designed to accommodate two (2) or more users so long as such new tower does not exceed the height limitations of subsection 21.2.5(f) and setback requirements of this article are met. After the replacement tower is built, only one (1) tower shall remain on such site. Support equipment shall, where technically feasible, be located underground. (5) Locating any alternative tower structures provided accessory structures are located underground, where technically feasible, or otherwise incorporated into the alternative structure. (6) Installing any antenna or tower not to exceed the limitations contained in subsection 21.2.5(f) in any area zoned AG-43, CX, CC, CH, OP, IX, IL or CIV and provided accessory structures are located underground, where technically feasible, or shielded to the satisfaction of the design review board. (7) Installing any antenna or tower in a location identified on the City of Roswell Master Siting Plan, as amended, provided accessory structures are located underground where technically feasible, or shielded to the satisfaction of the design review board. If council determines that any application does not meet the general application requirements, development requirements and/or standards enumerated herein, or such application conflicts with the Master Siting Plan, approval of the application shall be denied provided substantial evidence exists to support such denial. Any aggrieved party may appeal the denial to the Fulton County Superior Court. For purposes of this section, an aggrieved party is one who demonstrates that his or her property will suffer special damage as a result of the decision complained of rather than merely some damage that is common to all property owners and citizens similarly situated. (b) If the proposed tower or antenna is not included under the above described expedited approval uses, or the application does not on its face satisfy the development standards and other criteria specified herein, then a public hearing before the mayor and council shall be required for the approval of the construction of a wireless transmission facility in all Unified Development Code (UDC) districts. Applicants shall apply for a public hearing through the community development department and pay the required $500.00 fee at such time. Applications, when complete, shall be placed on the next available agenda of the mayor and council at which Unified Development Code (UDC) matters are considered. At least thirty (30) days prior to any scheduled hearing, the community development department shall cause a sign to be posted on the property and the publication of a public notice in a newspaper of general circulation and notice sent to surrounding property owners as shown on the county tax records within one thousand (1,000) feet of the proposed tower or antenna. Said notice shall state the nature of the application, street location of the proposal and height of the proposed structure. Before approving an application for an "other use," the governing authority may impose Unified Development Code (UDC) conditions to the extent necessary to buffer or otherwise minimize any adverse effect of the proposed tower on adjoining properties. The factors considered in granting such a permit include those enumerated in sections 21.2.4 and 21.2.5. The mayor and council may waive one (1) or more of these criteria, if, in their discretion doing so will advance the goals of this article as stated in section 21.2.1. Approved applications shall be valid for one (1) year from the date of the approval by the mayor and council.

(Ord. No. 2014-02-03, § 1, Amended 2/24/2014; 2010-03-06, § 10, Amended, 03/08/2010; 2003-07-17, Amended, 07/07/2003)

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.