§ 21.2.5 — Development Requirements for Towers
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 21.2.5
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/4da75cfe-c104-4515-a5df-a06bb16e8d5f
Section 21.2.5 - Development Requirements for Towers.
(a) Towers may be located only in the following zoning districts subject to the restrictions and standards contained herein: AG-43, CX, CC, CH, IX, IL or CIV Wireless transmission facilities in OP, the other districts shall be alternative tower structures only; provided however, towers may be allowed on publicly owned property regardless of Unified Development Code (UDC) district. (b) No new wireless transmission facilities shall be located within two thousand five hundred (2,500) feet of any preexisting wireless transmission site unless such new facility is concealed through use of alternative tower structures or is otherwise camouflaged, and a variance is granted by the Mayor and Council of the City of Roswell. (c) All applicants seeking to erect a tower must demonstrate that no existing tower or structure can accommodate the proposed antenna(s). Evidence of an engineering nature shall be documented by the submission of a certification by an engineer. Such evidence may consist of the following: (1) No existing towers or structures are located within the geographic area required to meet applicant's engineering requirements. (2) No existing structure is of sufficient height to meet the applicant's engineering requirements. (3) No existing tower or structure has sufficient structural strength to support applicant's proposed antenna(s) and related equipment. (4) Applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing tower or structure. (5) Such other limiting factor(s) as may be demonstrated by the applicant and verified by an engineer of the city's choosing. (d) Setbacks: Setbacks for towers and above-ground transmission facilities shall be as follows: (1) All transmission facilities, except buried portions, shall be set back from all adjoining properties zoned non-residential a distance equal to the underlying setback requirement in the applicable zoning district. (2) When a tower is adjacent to a residential use, the tower and entire transmission facility must be set back from the nearest residential lot line a distance equal to the height of the tower. (e) Unless otherwise specified by community development staff and the design review board, towers shall be enclosed by vinyl chain link security fencing not less than six (6) feet in height and shall be equipped with an appropriate anti-climbing device. (f) All new towers in excess of one hundred (100) feet which do not incorporate alternative design features must be designed and built in a manner that allows other entities to co-locate on the structure using the following guidelines: MAXIMUM TELECOMMUNICATIONS TOWER HEIGHTS Zoning District | Two Users | Three Users | Four Users I-1 | 120' | 150' | 180' C-3 | 120' | 150' | 150' (g) All towers and their related structures shall maximize the use of building materials, colors, textures, screening and landscaping that, in the opinion of the design review board and staff, effectively blend the tower facilities within the surrounding natural setting and built environment. Where appropriate, towers shall be painted so as to reduce their visual obtrusiveness, subject to any applicable standards of the Federal Aviation Administration (FAA).
(Ord. No. 2014-02-03, § 1, Amended 2/24/2014; 2003-12-32, Amended, 12/08/2003, (a) amended; 2003-07-17, Amended, 07/07/2003)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
