§ 11.5.1 — Land Disturbance Permits

Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 11.5.1

Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/c2623e7b-2981-4d28-b1af-20feb691ad87

Sec. 11.5.1. - Land Disturbance Permits

A. Authority The Director oversees the issuance of Land Disturbance Permits to ensure that site work conforms to federal, state and local regulations. B. Applicability 1. A Land Disturbance Permit is required for land disturbance activity, including, but not limited to, clearing and grubbing, dredging, grading, excavating, filling, tree removal, storage or transporting of materials on or off a site, and the construction of improvements such as streets, surface parking areas and drives, stormwater drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings or other structures requiring the issuance of a building permit. A permit is required for all such work, even when it is temporary in nature. 2. Water and sanitary sewer system improvements must be authorized by the utility provider; however, the location and land disturbing activities associated with those facilities will be reviewed and permitted by the City to ensure compliance with applicable tree protection, stream buffer, zoning buffer or other City standards that may be affected by the construction of utilities. 3. A major Land Disturbance Permit is required for projects that: a. Propose more than half an acre of disturbance; or b. Add more than 5,000 square feet of impervious surface; or c. More than 1 acre of grubbing; or d. The maximum height/depth of excavation or fill over 10 feet; or e. The maximum quantity of 50 cy total movement on the site. Projects meeting these criteria will likely qualify as major land disturbance projects, but the City will consider all factors of the project to make the final determination. [image omitted; see the official code] Permit Review Generalized Procedure 4. A minor Land Disturbance Permit is required for projects that: a. Do not include any work in the right-of-way; or b. Have less than half an acre of disturbance; c. And/or are adding less than 5,000 square feet of impervious surface; d. And/or have less than 1 acre of grubbing; e. And/or maximum height/depth of excavation or fill over 10 feet; f. And/or maximum quantity of 50 cy total movement on the site; g. And/or less than a 15% slope. Projects meeting these criteria will likely qualify as minor land disturbance projects, but the City will consider all factors of the project to make the final determination. 5. A land disturbance permit is not required for any proposed ground disturbance that does not exceed 2,500 square feet, does not result in the need for erosion control BMPs, and does not result in changes to topography or stormwater drainage patterns. 6. It is recommended that you contact The City of Sandy Springs to verify a permit is not required before proceeding with any work. 7. The calculation of the area of disturbance applies to the cumulative disturbed area of a project regardless of property boundaries. C. Application Initiation Any person, firm, corporation or agency may submit an application for a Land Disturbance Permit, provided they are the owner or the owner's representative of the property for which the application is being submitted. D. Submittal Process 1. Schedule a Developer meeting a. Before submitting an application for a Major Land Disturbance Permit, the applicant must schedule a Developer Meeting with the Director to discuss the procedures, standards and regulations required for approval. If it cannot be clearly determined whether the LDP will be a Major or Minor LDP under the criteria in 11.5.1.B, this initial meeting will establish what type of Land Disturbance Permit is required for the project. b. To schedule a Developer Meeting, call, email, or visit the Department. 2. Submit Application a. Following the Developer Meeting, the applicant may start the application process by completing an application form and providing plan sets along with the required review fees, to the Department. E. Application Review 1. Initial Distribution of an Application Upon determination of a complete application, the Director will promptly distribute the application for review by internal City Departments and external agencies. 2. Public Hearing Notice A public hearing is not required for a Land Disturbance Permit, therefore, no formal notice of the submittal is published, mailed or posted. 3. Developer Meeting The public is allowed to observe the Developer Meeting to enhance the transparency and public awareness of the permitting process. 4. Traffic Impact Study A traffic impact study is required when any development generates 100 or more trips during the peak hour. 5. Director Review a. If, after the internal and external review, the Director finds that the application does not meet all applicable requirements of this Development Code, the Director will notify the applicant in writing of the specific provisions that have not been met and offer the applicant the opportunity to make changes to the application. If revised application materials are required, see Sec. 11.2.3 E. b. If, after the internal and external review, the Director finds that the application meets all applicable requirements of this Development Code, the Director will accept the application as complete. F. Approval Criteria The approval of or requirement of revisions to a land disturbance permit application are based solely on whether or not the submittal meets or fails to meet the applicable requirements of this Development Code. G. Denied Application If unsatisfied with the Director's decision, the applicant may file an appeal within 30 calendar days of the decision with the Superior Court of Fulton County. H. Permit Revisions Revisions to an approved Land disturbance permit may be approved by the Director following review by applicable internal and external agencies consistent with this Section. I. Application Expiration An application submitted for a land disturbance permit expires after 6 months from the issuance of the latest letter of permit revisions. At this time, the City will issue a written notice of expiration of permit application to the applicant and require that comments be addressed or permit be resubmitted within 30 days of issuance of the notice. J. Permit Validity A land disturbance permit remains valid for the duration of the project subject to the following time restrictions: 1. Land disturbance permits expire 6 months from the date of issuance if no inspection has been requested; or 2. If 1 year elapses between inspection requests. K. Permit Extension 1. Extension by Director a. The Director is authorized to grant, in writing, an extension of a land disturbance permit for a period not more than 180 calendar days, subject to the qualifying conditions set forth in this Section. To request an extension by the Director, an application must be submitted to the Department at least 30 days prior to the expiration of the land disturbance permit. b. No more than one 180-calendar-day extension per land disturbance permit may be granted by the Director for any of the qualifying conditions set forth in this Section (except a court action delay). 2. Extension by the City Council a. Reserved. b. To request an extension by the City Council, an application must be submitted to the Department at least 30 days prior to the expiration of the 180-calendar-day extension period granted by the Director pursuant to this Section. c. The Department must prepare an analysis and recommendation as to whether the documentation in the application is sufficient based on 1 of the 4 criteria which may validate an extension request by the City Council. 3. Qualifying Conditions In every application for an extension of a land disturbance permit, the applicant shall provide an affidavit documenting at least 1 of the following: a. A delay resulting from court actions involving the land disturbance permit or a previous extension on the subject property for which an extension is sought. Extensions approved in connection with court action shall remain valid for 1 year beyond the granting of an order or the expiration of an appeal period before any court with jurisdiction. b. Nonavailability of utilities resulting from government and/or private utility inaction. In those instances where wastewater and water facilities are available for a fraction of the desired capacity, or when capacity was available at some time during the one-year period, but not during the 60 days prior to expiration, the City Council may evaluate such case's qualifications for an extension on its individual merits considering any evidence that might indicate a diligent effort to proceed with development. c. A delay in development resulting from wetlands regulatory procedures requires the applicant to provide a copy of the application acknowledgment letter from the Savannah Regulatory Branch of the Corps of Engineers as documented evidence. The application must have been filed at least 6 months before the expiration of the land disturbance permit. d. An inability to obtain financing, despite documentation of the property owner's efforts during the 3 months prior to the applicant seeking an extension and continuing until 1 week prior to consideration of the extension request to the City Council. Documentation must consist of 2 official denials signed by officers of 2 different lending institutions who have final jurisdiction over such financial transactions. L. Lapse in Construction Activity For the purposes of this Section, a lapse in or suspension of development activity, as authorized by a land disturbance permit, as a direct result of action or inaction on the part of the City which is completely beyond the control of the developer, will not be considered as a lapse in activity causing the development permit to expire. The 180 calendar days within which development activity must begin will exclude any such time period during which the activity is prohibited or has been caused to lapse by said City's action or inaction. Any action or inaction on the part of the developer which results in a suspension of development activity will be counted toward the 12-month time period. M. Bonding Infrastructure Improvements Prior to the approval of a Final Plat, a bond is required for right-of-way infrastructure improvements, landscaping and stormwater improvements that have not been installed. The required bond amount will be 125% of the total estimated cost for infrastructure. The City must approve any cost estimate used for bond purposes. The bond will be released upon installation and City approval of the improvements. N. Action Following Work Upon completion of the work required under a Land Disturbance Permit, application for Final Plat and Building Permits may be made.

(Ord. No. 2023-12-20, § I(Att. A), 12-5-2023; Ord. No. 2025-09-22, § I, 9-16-2025)