§ 11.5.2 — Building Permit
Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 11.5.2
Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/7e2b32ae-071d-4e9c-9cd8-840daf30ccaa
Sec. 11.5.2. - Building Permit
A. Building Code Building permits, including associated certificates of occupancy, are issued consistent with Chapter 105, Article 2 of the City Code. B. Other Applicable Codes Building permits for all structures or interior finishes are issued after meeting the applicable requirements of the Fire Prevention and Life Safety Codes, and the various health, water, sewer, and building codes of the City or utility providers, as well as the provisions of any certificate approved under the Chattahoochee River Corridor, if applicable and the provisions of this Development Code. C. Sanitary Sewage Disposal 1. Septic System For any structure for which on-site sewage disposal (septic systems) will be provided, a permit issued by the Fulton County Health and Wellness Department must be required prior to issuance of a building permit. The permit may first require approval of a plan showing the location of the sewage disposal system and other site improvements, in accordance with Fulton County Section 34-568, Wastewater Discharge. 2. Connection to Public Sanitary Sewer Any structure that requires a connection to or modification of the existing sanitary sewer system requires approval from Fulton County prior to the issuance of a building permit. D. Potable Water Supply Any structure for which a connection to the potable water system is required must provide proof of payment of all applicable fees to the water provider. E. Single Family 1. A building permit for a single family (single unit) residence may only be issued after the recording of a final plat or after the lot on which the building is to be located has otherwise become a buildable lot of record. 2. Reserved. F. Reserved G. Fee-Simple Townhouse Subdivisions A building permit may be issued on a buildable lot of record established for each building (containing any number of townhouse dwelling units) through recording of a final plat following completion of all required public improvements. Upon completion of the buildings, the final plat must be re-recorded to establish individual lots for the townhouse units, based on their actual locations, prior to issuance of certificates of occupancy. H. Multifamily and Nonresidential Structures 1. Issuance of a building permit for any principal building other than a single unit detached (and associated accessory structure) requires issuance of a land disturbance permit for the building site, and the building permit must be consistent with the land disturbance permit. 2. Building plans must be received and approved by the Department prior to permitting for all structures. 3. Fulton County approval may be required prior to the issuance of a building permit for construction activities involving, food service, commercial swimming pools, dumpster pads, hotels or motels, grease traps, and similar uses requiring review by a department of Fulton County. I. Demolition Permits Demolition permits may be required for the partial or complete demolition of the interior or exterior of any structure within the City. Pursuant to the State of Georgia's Asbestos Safety Act, an asbestos survey is required. J. Expiration of Building Permits A building permit remains valid for the time period specified in the building codes adopted by the City. K. Expiration of Building Permit Application An application submitted for a building permit expires after 60 days from the issuance of the latest letter of permit revisions. At that time, the City will issue a written notice of expiration of permit application to the applicant and require that comments be addressed or the permit be obtained within 30 days of issuance of the notice of expiration. L. Issuance of Permits Prior to Final Plat Building permits will only be issued on buildable lots of record, as defined in this Development Code, except under special circumstances limited to and as specifically described in this Section. 1. Single unit and 2-family residential model homes. 2. Nonresidential subdivisions. Building permits may be issued on the basis of an approved preliminary plan and after a land disturbance permit has been approved reflecting the site plan and construction drawings for specific buildings and associated site improvements. Issuance of the building permits will be conditioned on the following: a. An approved surety must have been received in a form acceptable to the City Attorney, drawn in favor of the City and in an amount not less than 125% of the cost of completing all public improvements as authorized and required by the land disturbance permit. b. The performance bond or other approved surety must not exceed an aggregate total for all required public improvements of $12,000.00 per acre for the total acreage included within the subdivision or portion of the subdivision where the improvements are proposed, except by approval of the City Council. c. Fire Marshal approval is required prior to issuance of any building permit, which may include approval of acceptable access and water under pressure for combustible construction. d. Approval of the Fulton County Health and Wellness Department for on-site sewage disposal or the Fulton County Sewer Department for a building to be served by public sewer is required prior to issuance of any building permit. e. Construction of the required public improvements must proceed concurrently with construction of the buildings. f. No certificate of occupancy will be approved for any structure within the subdivision prior to recording of the final plat without the express approval of the Director. g. The Director must find that the public interest is best served and that a public purpose is involved in the acceptance of the surety.
(Ord. No. 2023-12-20, § I(Att. A), 12-5-2023; Ord. No. 2025-09-22, § I, 9-16-2025)
Ask a question about Sandy Springs law
Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.
