For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.5.4 — Other Permits

Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 11.5.4

Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/4e41739d-c799-419c-a86c-ceb9f29eb3c9

Sec. 11.5.4. - Other Permits

A. Right-of-Way Encroachment/Utility Permit No person or company may perform construction work in the street right-of-way without a permit issued by the City. The permit must be posted at the construction site at all times. Such construction must conform to the construction/maintenance guidelines and specifications of the City or the State Department of Transportation. B. Tree Removal Permit When tree removal is anticipated and the activity may result in the removal, damage or destruction of any tree, please see Sec. 9.3.3 for permit requirements. C. Groundwater Well and Septic Permit No person or company may install or perform construction of groundwater wells or septic systems without prior approval from the Fulton County Department of Health and Wellness and completion of a pre-construction meeting with the City of Sandy Springs. D. Sign Permit 1. Applicability All free-standing signs require a separate building permit. 2. Application An application for a sign permit must be completed as required in the Sandy Springs Technical Manual. 3. Incomplete; False Application The Director must, within 30 days of receipt of an application, reject any application that is incomplete, that contains false material statements or omissions, or that is for a sign which would violate any standard in Div. 8. The Director may reject at any time prior to the expiration of the 30-day period, if the application is incomplete or contains false material statements or omissions. 4. Processing Time; Denial The City will process all complete and accurate sign permit applications within 30 business days of the City's actual receipt of a complete and accurate application and upon remittance of the appropriate sign permit fee. The Director will give notice to the applicant of the decision by email or mail on or before the 30th business day. If the decision of the Director is to deny the application, the decision must state the grounds upon which the denial is based. Failure of the City to act within the 30-day period is deemed a denial of the permit. If notice is mailed in conformity with this Section, notice is deemed to have been given upon the date of mailing. Any application meeting the standards of this Div. 8.3 will be granted. Any application not meeting the standards of Div. 8.3 will be denied. 5. Resubmission A rejected application later resubmitted in conformity with Div. 8.3 is deemed to have been submitted on the date of resubmission, instead of the original submission date. An application which is resubmitted must meet all the standards for an original application. E. Fence or Wall Permit 1. Applicability a. A wall that retains earth requires a retaining wall permit (see Sec. 9.4.3). A wall that does not retain earth is considered a fence for permitting purposes. b. Fence permits are required when installing a new fence or wall that does not retain earth, non-vehicular gate, or when a replacement of an existing fence results in a change in placement, height, materials or design. c. Electronic vehicular gates require a building permit. d. A swimming pool enclosure fence will be approved as part of the pool permit. e. A fence permit is not required for temporary security purposes during construction. 2. Application An application for a fence permit must be completed as required in the Sandy Springs Technical Manual. F. Trenching Permit 1. Prohibition No individual, partnership, corporation, or other entity of any kind whatsoever may engage in any excavation or trenching except in compliance with the provisions of this Development Code and in compliance with any applicable laws of the State of Georgia or of the United States or any rules and regulations of the U.S. Department of Labor, Occupational Safety and Health Administration, or any other state or federal governmental entity or Department promulgating rules and regulations applicable to excavating and trenching. 2. Adoption of Federal Regulations All safety and health regulations adopted by OSHA with regard to excavating and trenching operations, particularly Part 1926, Subpart P-Excavations, Trenching, and Shoring, Section 1926.650, 1926.651, 1926.652, 1926.653 of the Code of Federal Regulations, as the same now exist or may be amended, are adopted as a part of this Development Code as if quoted verbatim here. 3. Permit Required No excavation or trenching may be performed until a permit or authorization for the work has been obtained from the City in accordance with this Article. Applicants are required to acknowledge receipt and understanding of safety requirements before any permit will be issued. 4. Certificate Required No equipment operator or supervisory personnel may participate in any excavation or trenching or in any way work in an excavation or trench unless such person holds a valid certificate evidencing satisfactory completion of a required educational program on safe trench/excavation practices. No other person may participate in or work in any excavation or trenching site unless a certificate holder is present at the excavation or trench site where work is being performed. 5. Inspection The City will periodically inspect trench/excavation sites. Such inspectors will, among other things, verify the presence of the required permit, verify existence of required certificates, and verify compliance to OSHA safety standards adopted in paragraph B. The inspectors may operate pursuant to a contract between the City and a third-party entity. G. Swimming Pool Permit Issuance of a permit for a swimming pool as an accessory use to a single unit residence, whether to be issued at the same time or subsequent to the permitting or construction of the house, requires approval of a swimming pool site plan. The plan must show the proposed location of the swimming pool, associated deck, pool equipment, pool enclosing fence and gate details, the property boundaries, setback lines, topography lines, septic tank and septic tank drain field (if any), and any easements on the site, and all requirements of this Development Code and the swimming pool code found in the International Swimming Pool & Spa Code. A certificate of occupancy or a certificate of completion will not be issued until conformance to the swimming pool site plan and all applicable building codes has been field verified by the Department. Additionally, all permitted swimming pools must conform to the swimming pool discharge policy. H. Administrative Use Permit 1. Intent Administrative use permits are intended to be used where complex or unusual technical determinations are involved and/or in conjunction with temporary uses and structures where the matter is not of such a nature as to require public notice and hearing. Such permits shall be processed by the community development department. 2. Authority The Director shall be responsible for processing administrative use permits, making or causing to be made all necessary studies and referrals, and deciding thereon. 3. Conditions In granting administrative use permits, such conditions may be attached as are deemed necessary in the particular case to protect the public interest and surrounding properties. Such conditions shall generally be of a nature as stated below, in addition to policy or regulations specific to the use otherwise required by the City: a. Ingress and egress to the property and proposed structure or uses thereon, with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or other catastrophe. b. Off-street parking and loading areas where required, with particular attention to the items in a. above. c. Refuse and service areas. d. Appropriate buffering or screening to alleviate such potentially adverse effects as may be created by noise, glare, odor, lighting, signs or traffic congestion. e. Hours and manner of operations. f. Length of time regarding the duration of such permit, if any. g. Tree preservation and replacement in accordance with the requirements of the City of Sandy Springs Tree Conservation Ordinance (Div. 9.3). 4. Applications A property owner, or any other person with notarized written consent of the property owners, may file with the Director an application for an administrative use permit on such property, provided that such permit is generally authorized in the district in which such purpose is so designated. The application shall be filed on a form provided for such purposes and shall be accompanied by plans, reports or other information, exhibits or documents as may reasonably be required by the Director to make the necessary findings in the case. 5. Action by Director The Director shall examine the application and supporting materials for conformance with the requirements and stated intent of this Code, make such referrals as are called for in the circumstances of the case, and within 30 days (unless a longer period is mutually agreed upon) decide on the application. The Director may issue the permit as applied for, issue a permit conditional upon changes to the application, set forth in writing, as necessary to assure conformance with the requirements and stated intent of this Code, or deny the application, with written reasons for such denial. 6. Withdrawal of Application An application for an administrative use permit may be withdrawn at any time without limitation on resubmittal. 7. Appeals of Decision Made By the Director Appeals of decisions made by the Director shall be submitted to the Superior Court of Fulton County, as provided in Sec. 11.6.3.

(Ord. No. 2023-12-20, § I(Att. A), 12-5-2023)

Ask a question about Sandy Springs law

Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.