§ 8-8006 — General provisions
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 8., § 8-8006
Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/91ed0f3a-628f-447d-a8c7-68e73d39d40a
Sec. 8-8006. - General provisions.
(I) It shall be unlawful for the owner or operator of an underground storage system containing pollutants to permit or maintain leaks in such underground storage systems. (II) Whenever a leak from an underground storage system occurs, the operator shall report such a leak to the fire marshal within one working day of detection. Within 48 hours, all leaks shall be stopped or the underground storage system shall be pumped clean of pollutant. (III) No underground storage system which has leaked or has otherwise failed shall be placed into service for the purpose of reusing the underground storage system without: (a) Preventing the leak from migrating to another area or preventing the leak from spreading to cover a larger area. (b) Performing or having the repairs or replacement performed in a manner which complies with the applicable section 8-8010(I), (II), (III) and (IV). (c) Testing or having the underground storage tank and/or integral piping system tested in accordance with the provisions in section 8-8010(V). (I) When a leak occurs, the owner or operator shall remove the free-floating pollutant from the groundwater, remove any combustible or harmful vapors emitted from the pollutant, and ensure that the level of dissolved hydrocarbons in the water be no greater than declared acceptable for public health by the Georgia Department of Environmental Protection. (II) Investigation of a leak shall commence within three working days from the date of detection by the operator. Investigation shall be conducted by a qualified soil/groundwater investigation and pollutant analysis removal firm. In the investigation process, the owner or operator, through appropriate testing, shall determine the type of pollutant leaked, the limits of the leak accumulation, and the quantity of leaked pollutant. (III) The owner or operator shall submit to the fire marshal, within 21 calendar days from the date of detection, a pollutant removal and monitoring plan. This plan shall be developed by a qualified soil/groundwater investigation and pollutant analysis removal firm. Removal shall commence within 25 calendar days from the date of detection by the owner or operator, unless extenuating circumstances dictate otherwise. The fire marshal shall decide if the extenuating circumstances warrant an extension of time. Where an extension of time is warranted, the fire marshal and the owner or operator shall agree on a time extension for the date of commencement of the removal operations. (IV) Whenever "owner" or "operator" is used conjunctively with the other and the parties have by agreement identified which party has the primary responsibility for compliance with this chapter and have filed, with the fire marshal, a written statement executed by both evidencing that agreement, the city shall deem the party assuming the primary responsibility as the party subject to compliance with this chapter. The party assuming the primary responsibility can also sign the appropriate space furnished by the underground tank registration form specified in section 8-8007. The only exemptions to this provision shall be where: (a) The other party has separately violated this chapter; (b) The property has been abandoned by the operator when the violation occurs, in which event the owner shall be deemed responsible; or (c) Both parties have caused the violation.
(Code 1977, § 8-8006)
Ask a question about Savannah law
Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.
