Sec. 8-8010. - Tank and integral piping selection, maintenance and repair.
(I) Tank selection and maintenance. (a) All new underground storage tanks installed for containing pollutants shall be designed and constructed in a manner which will prevent leaks. Acceptable designs for tank construction include cathodically protected steel, glass fiber-reinforced plastic, steel clad with glass fiber-reinforced plastic, double-walled steel or plastic, or other equivalent designs approved by the fire marshal. Design, construction and installation of new underground tanks shall be in accordance with standards contained in NFPA 30, chapters 2-1 and 2-3; API 1615, chapters 3(3) and 3(4); and UL58 or UL1316; and the manufacturer's recommendations. (b) All new tanks shall be equipped with a strike plate beneath the fill pipe and gauge opening. (c) All new underground storage tanks shall be provided with a leak detection system which shall monitor any leakage of the stored pollutants. The leak detection system may consist of: (1) A continuously operating leak detection system in between the walls of a double-walled tank; or (2) A single monitoring well or continuously operating leak detection system located in an impervious secondary containment; or (3) A continuously operating leak detection system placed around a tank in an excavation or secondary containment in accordance with the manufacturer's recommendations; or (4) A network of at least four monitoring wells placed in the excavation around a tank or tanks in compliance with the requirements of section 8-8010(I)(d), (e); or (5) Another alternative approved by the fire marshal. (d) Leak detection system requirements. (1) All continuously operating leak detection systems shall be installed, maintained and operated in accordance with the manufacturer's recommendations. A continuously operating leak detection system shall be inspected at least once a month to determine that the system is functioning. (2) All monitoring wells for which manual test devices or methods are used shall be checked at least once a month in a manner which will indicate the presence of a pollutant leak or other failure or breach of integrity, and the date and time of such check recorded. (3) All monitoring wells which are not checked with automatic or manual detection devices or methods shall be checked at least once a month in accordance with the requirements in section 8-8010(I)(e)(2). (4) A monitoring well which contains less than one foot of water may not be checked by removal of a sample as described in section 8-8010(I)(e)(2) but must be checked with a manual or automatic detection method. (e) Requirements for monitoring wells. (1) Monitoring wells shall be designed to meet the following specifications. Monitoring wells installed before the effective date of this chapter [April 11, 1985] may be used as a part of a monitoring system if approved by the fire marshal. The well casing shall: (a) Be a minimum of two inches in diameter; (b) Be slotted from the bottom to at least two feet above the normal annual high-water table; (c) Have a minimum slot size of 0.010 inch; (d) Be completed by backfilling with appropriate clean filter pack or wrapping in an appropriate filter cloth to prevent clogging under soil conditions where silty fines will blind the minimum slot size; (e) Be constructed of schedule 40 PVC or other material which is impervious to the pollutant stored; (f) Be sealed into the bore hole at the surface with an impervious barrier designed to prevent contamination of the well by surface pollutants and damage to the well; (g) Be equipped with a watertight cap; and (h) Be of sufficient length that: (i) The bottom of the casing shall be at least five feet below the water level at the time of drilling but no deeper than 25 feet; or (ii) The casing shall extend to within six inches of the bottom of a secondary containment but shall not contact the containment. (2) All monitoring wells shall: (a) If water enters the well, be developed upon drilling until the water is clear and relatively sand free by overpumping, bailing, surging with compressed air, backwashing, a combination of the above, or other methods approved by the fire marshal; and (b) If not equipped with a continuously operating leak detection system, be checked with a portable detection system inserted into the well, checked with a pollutant-sensitive paste, or be sampled by the removal of at least one cup of fluid from the well using a Kemmerer-type sampler, bailer, or a sampler of similar design. The fluid shall be taken from the surface of the water table. The fluid shall: (i) Be poured into a clean, clear glass container kept for the purpose and examined for signs of an oily layer or odor of pollutant; (ii) Be analyzed at the site; or (iii) Be sent to a laboratory and analyzed. (3) The positive response of a detection device, a color change from a pollutant sensitive paste, the presence of a layer or odor of pollutant, or the positive report of a laboratory that the sample contains pollutant shall be treated as a leak unless the owner or operator affirmatively demonstrates that no leak has occurred. (4) All wells shall be kept capped when not being checked. (f) A cathodically protected tank shall meet the specifications in API 1632, shall be coated in accordance with NACE RP-01-69, and shall meet the following requirements: (1) A sacrificial anode-type tank shall: (a) Be electrically isolated; and (b) Have the structure-to-soil potential tested six weeks after installation or excavation within 25 feet of the underground storage system, at the end of the first year, and every five years thereafter. If the cathodic protection system is not operating in accordance with the manufacturer's recommendations, the cause shall be determined and the necessary repairs made within 60 calendar days of the test. (2) A tank protected by an impressed current system shall: (a) Be designed so that the impressed current source cannot be de-energized at any time, including during closure of the facility, except during power failures or to perform service work on the underground storage system or the impressed current cathodic protection system; (b) Include a continuously operating meter to show that the system is working; and (c) Be checked monthly, and the date and time of such check recorded. If the protective system is not operating in accordance with manufacturer's recommendations, the cause shall be determined and the necessary repairs made within 60 calendar days of the check. (g) A glass fiber-reinforced plastic tank shall: (1) Be tested in accordance with ASTM specification D4021-81; (2) Be labeled on the tank and fill cap "Nonmetallic Underground Tank for Petroleum Products, Alcohols, and Alcohol-Gasoline Mixtures" or "Nonmetallic Underground Tank for Petroleum Products Only"; and (3) Be tested for deflection in accordance with the manufacturer's recommendations at the time of installation. (h) A glass fiber-reinforced plastic-clad steel tank shall: (1) Be cleaned by sandblasting to SSPC6; (2) Be clad with a mixture of isophthalic resin and fiberglass 100 mills thick or another fiberglass type material of proven equal performance; (3) Be tested by a 10,000-volt holiday test performed over 100 percent of the surface; (4) Be electrically isolated; and (5) Be tested for deflection in accordance with the manufacturer's recommendations at the time of installation. (i) All underground tanks shall be designed to be compatible with pollutant stored. (II) All and new integral piping systems. (a) All systems. (1) All integral piping systems shall be installed, used and maintained in a manner which will prevent the leaks. (2) All integral piping systems shall be constructed in accordance with acceptable engineering practices and NFPA 30, chapter 3. (3) All integral piping systems shall be designed, constructed and installed in a manner which will permit periodic testing of the entire system. (4) All integral piping systems shall be designed to be compatible with the pollutant stored. (b) New systems. (1) All integral piping systems shall: (a) Be constructed of corrosion-resistant materials; (b) For metal integral piping systems, be protected against corrosion by the use of double-walled piping or cathodic protection in accordance with API 1632, NACE RP-01-69, or an equivalent system. (2) Cathodically protected piping systems of the sacrificial anode type shall: (a) Be designed and installed to permit measurement of structure to soil potential, be tested six weeks after installation or excavation within 25 feet of the underground storage system, and be tested at the end of the first year and every five years thereafter; and (b) If inadequate cathodic protection is indicated, be examined to determine the cause and be repaired as necessary to meet the manufacturer's recommendations within 60 calendar days of the test. (3) Cathodically protected integral piping systems of the impressed current type shall: (a) Be designed so that the impressed current source cannot be deenergized at any time, including during closure of the facility, except during power failures or to perform service work on the underground storage system or the impressed current cathodic protection system; and (b) Be equipped with a continuously operating meter to show that the system is working. The system shall be inspected monthly; if any inspection indicates that the system is not functioning in accordance with the manufacturer's specifications, repairs shall be made within 60 calendar days of the inspection. (4) All integral piping systems shall be equipped with a leak detection system which may consist of: (a) A network of monitoring wells: (i) Monitoring wells shall be installed in the excavation beside the integral piping system and shall be located along its entire length, with one well within 100 feet of each end of the excavation; and (ii) Shall be located so that no two consecutive wells are more than 250 feet apart; or (b) A continuously operating leak detector in the excavation along the piping, between the walls of double-walled piping or in a secondary containment in which the piping lies; or (c) A single monitoring well or continuously operating leak detection system in an impervious underground catchment basin where piping is installed so that all leaks will enter the basin; or (d) A product line leak detector located within the remote pumping system. Product line leak detectors shall be tested for proper operation before the remote pumping system is used. Product line leak detectors shall be tested for proper operation on an annual basis. (5) Remote pumping systems shall meet the following requirements: (a) Remote pumping systems shall be designed or equipped so that no part of the system will be subjected to pressures above allowable working pressures. (b) Remote pumping systems shall have a listed, rigidly anchored emergency shutoff valve, incorporating a fusible link or other thermally actuated device and designed to close automatically in the event of a severe impact or exposure to fire, and shall be properly installed in the supply line at the base of each individual island-type dispenser. The automatic closing feature of this valve shall be checked at the time of initial installation and at least once a year thereafter by manually tripping the hold-open linkage. (III) Existing underground tanks. (a) When a leak occurs in an underground tank, no person, owner or operator shall use or maintain any underground storage tank without replacing or retrofitting the underground tank so as to comply with all of the provisions under subsection (I), except that: (1) Strike plates are not required to be retrofitted. (2) Nonconforming underground storage tanks shall be lined in accordance with the recommendations in API 1631. (b) In accordance with the dates shown in Table no. 1 below, no person, owner or operator shall use or maintain any underground storage tank without installing a leak detection system in accordance with subsection (I). (c) In achieving the above compliance, leak detection systems shall be installed by December 31 of the appropriate year shown in Table no. 1 below. If the age of the tank cannot be determined, installation shall be completed by the earliest date shown. (IV) Existing integral piping systems. (a) When a leak occurs in an integral piping system, no person, owner or operator shall use or maintain any nonconforming integral piping system without replacing or retrofitting the system so as to comply with all provisions under subsection (II). (b) In accordance with section 8-8010(II)(b)(4), an integral piping system shall have a leak detection system designed on the same schedule as the associated underground storage tank as shown in Table no. 1. TABLE NO. 1 Year Tank Installed | Year Retrofitting Required | 1987 | 1988 | 1989 | 1990 Prior to 1970 | LD | | | 1970—1975 | | LD | | 1976—1980 | | | LD | 1981—4/11/1985 | | | | LD LD=Installation of leak detection system (I) Underground storage system testing. (a) New facilities. The field testing of new underground tanks and integral piping systems shall conform to API 1635, sections 4.2.1.1 and 4.2.1.2. (b) Existing facilities. (1) If other leak detection systems fail to detect a suspected leak, the fire marshal may require the owner or operator of an underground storage system to test the system for tightness in accordance with chapter 4 of NFPA 329. (2) As specified in section 8-8008(III), the integral piping system and underground tank shall be tested in accordance with chapter 4 of NFPA 329. (3) When flammable or combustible liquids or their vapors have been detected in neighboring structures, sewers, wells or other on-[property] or off-property locations, the fire marshal may require the owner or operator of an underground storage system to test the system for tightness in accordance with chapter 4 of NFPA 329. (4) Underground tanks shall not be pressure tested with air. (5) Integral piping tests as required in section 8-8010(V)(b)(1), (2) and (3) shall be by a pipeline test with a liquid as specified in chapter 4 of NFPA 329. (6) If an underground tank and/or integral piping system is retrofitted or repaired, before being placed back in service, it shall be tested for tightness in accordance with chapter 4 of NFPA 329. (c) Tester qualifications. [For] any test required in section 8-8010(V)(a), (b) or anywhere else in this chapter where a "test" is required of the tank, piping, equipment, device or system, the test shall be performed by a tester as defined in section 8-8003.
(Code 1977, § 8-8010)