For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 102-711 — Permit fees

Municipal Code of the City of Des Moines, Iowa (Supp. No. 38, Update 3: codified through Ordinance No. 16,577, adopted August 24, 2026) · Des Moines Municipal Code § 102-711

Corpus is an independent public-information project, not the official City of Des Moines website. Stable reference: corpuslaw.us/code/cb2675c7-2458-46dd-ba89-38e449f6d9b3

Sec. 102-711. - Permit fees.

(a) Excavation permit fee. An excavation permit fee shall be charged to every person who makes application to excavate in the right-of-way. The excavation permit fee shall be determined by the city engineer and shall be in an amount sufficient to recover the following costs: (1) The city cost component, the disruptive cost component, and the inspection cost component; and (2) The GIS cost component, which is the cost of creating and maintaining information on a geographical information system (GIS) mapping system. In addition, the city engineer may in appropriate circumstances include a degradation cost component in the calculation of excavation permit fees, which is to recover the accelerated depreciation of the right-of-way which will result from the excavation to take place thereon. Such fee shall, in part, be based on the size of the area to be excavated or impacted by the excavation; the duration that the area will be unavailable for public use; the amount of vehicular, bicycle, and pedestrian traffic that is disrupted thereby; and such other factors as the city engineer shall deem appropriate. (b) Obstruction permit fee. An obstruction permit fee shall be charged to every person who makes application to undertake activities in the right-of-way which will result in the obstruction of vehicular or pedestrian traffic. The obstruction permit fee shall be determined by the city engineer and shall be in an amount sufficient to recover the following costs: (1) The city cost component, the disruptive cost component, and the inspection cost component. (2) The GIS cost component, which is the cost of creating and maintaining information on a geographical information system (GIS) mapping system. Such fee shall, in part, be based on the size of the area to be obstructed or impacted by the obstruction; the duration that the area will be unavailable for public use; the amount of vehicular, bicycle, and pedestrian traffic that is disrupted thereby; and such other factors as the city engineer shall deem appropriate. (c) Computation of disruptive cost component for permitting purposes. The disruptive cost is the cost the city will incur in managing the vehicular and/or pedestrian traffic which will be disrupted by permitted excavation and/or obstruction activities in the right-of-way. The city engineer shall determine the disruptive cost component of the fees for excavation and obstruction permits by using economic and accounting principles. Fees may vary from one location to another based on: the size of the area to be obstructed; the duration that the right-of-way or parts of it will be unavailable for public use and travel; the proximity of businesses and enterprises which rely in whole or in part on access by members of the public or the delivery of supplies or raw materials; the importance of the particular right-of-way to the traveling public; the use of the particular right-of-way for emergency vehicles and the availability of alternate routes; the traffic volumes carried by the particular right-of-way; the amount of vehicular, bicycle, and pedestrian traffic that is reasonably likely to be disrupted thereby; the traffic control measures and activities which the city will have to undertake to appropriately manage the disruption of traffic, including maintenance of special traffic control signage or signals, and the provision of traffic control personnel; and the loss of revenues to the city, including but not limited to the loss of parking revenues due to loss of access to parking spaces or facilities. (d) Computation of inspection cost component. A schedule of fees for inspection services shall be developed by the city engineer to recover the costs incurred by the department in having its inspectors conduct inspections of street restoration work undertaken in connection with excavation permits issued to permittees. The base fee for an inspection shall be expressed in such schedule as a per square foot fee for the area to be excavated or obstructed or impacted by excavation or obstruction. The fee for a follow-up inspection, conducted to obtain or confirm compliance with a specification, regulation, permit condition or city engineer's order, after a permittee is informed of a violation thereof, shall be expressed in such schedule as hourly rates which are to be based on the salary, benefit, and overhead costs to the city of the inspectors providing follow-up inspection services. Follow-up inspection services shall be charged to permittees on the basis of the number of hours of inspector time spent providing follow-up inspection services with respect to work performed in connection with each permit, multiplied by the applicable hourly rates in the schedule. (e) Payment of permit fees. Permit fees, computed as provided in this section by the city engineer, shall be paid by the permittee prior to issuance of the excavation or obstruction permit, unless in the discretion of the city engineer permission is given to pay such fee within 30 days after billing therefor by the city. (f) Plan review fee. A plan review fee shall be charged to any person or permit applicant who submits plans and specifications for review by the city as required by section 102-708. The plan review fee is intended to recover the salary, benefit, and overhead costs to the city of the city employees reviewing such plans and specifications, and shall be based on the size of the area proposed to be excavated. The plan review fee shall be in the amount set in the schedule of fees adopted by the city council by resolution. (g) Payment of plan review fee. If the plans and specifications are submitted for review and approval prior to application for an excavation permit, the plan review fee shall be paid prior to the city engineer's approval of such plans and specifications, or prior to city's acceptance of the permit application. If the plans and specifications are submitted for review as part of an application for an excavation permit, the plan review fee shall be paid prior to issuance of the permit. (h) Fees doubled during probation. All permit fees shall be doubled during a probationary period. (i) Refund after revocation of permit. Permit fees which were paid in connection with a permit which the city engineer has revoked for a breach as provided in section 102-729 are not refundable. (j) Schedule of fees. (1) The permit fees to be paid in each instance shall be determined by the city engineer by reference to a schedule of permit fees, which shall be developed in conformance with the requirements of I.C. ch. 480A, shall be updated as needed prior to each construction season, and shall be approved by the city council by resolution.

(O.13,638, 14,043, 14,202, 14,463, 15,386, 15,761, 15,909)

Ask a question about Des Moines law

Corpus searches the Des Moines sections it holds and shows the ones that match, with their citations. Free, no sign-in.