For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 102-722 — Permittee's other obligations

Municipal Code of the City of Des Moines, Iowa (Supp. No. 38, Update 3: codified through Ordinance No. 16,577, adopted August 24, 2026) · Des Moines Municipal Code § 102-722

Corpus is an independent public-information project, not the official City of Des Moines website. Stable reference: corpuslaw.us/code/cf7ae73c-0b0c-41b8-9924-d168df2147da

Sec. 102-722. - Permittee's other obligations.

(a) Obtaining a right-of-way permit does not relieve a permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by any other city, county, state, or federal rules, laws or regulations. (b) A permittee shall comply with all requirements of local, state and federal laws, including I.C. § 480.1 et seq., pertaining to underground facilities information (one-call excavation notice system). (c) A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the right-of-way pursuant to its permit, regardless of who performs the work. (d) Except in an emergency and with the approval of the city engineer, no right-of-way obstruction or excavation may be performed when seasonally prohibited or when conditions are unreasonable for such work. (e) A permittee shall not so obstruct a right-of-way that the natural free and clear passage of water through the gutters or other waterways shall be interfered with. (f) Work under a permit shall be conducted within the permit area, and work vehicles, equipment and materials shall be stored within the permit area. Private vehicles may not be parked within or adjacent to a permit area. The loading or unloading of trucks adjacent to a permit area is prohibited unless specifically authorized by the permit. (g) A permittee shall comply with all conditions stated in the permit, and with orders issued by the city engineer or the city engineer's designated representative with respect to work being performed under the permit. (h) A permittee shall complete all work authorized by a permit within the time provided in the permit, or within a time extension of the permit granted by the city engineer or the city engineer's designee. (i) A permittee shall provide factually accurate, truthful and complete information in making application for a permit.

(C91, § 23-64.02; O.13,638, 14,463)

Ask a question about Des Moines law

Corpus searches the Des Moines sections it holds and shows the ones that match, with their citations. Free, no sign-in.