IV — DRAINAGE SYSTEM DESIGNS
Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)), Champaign, IL · 19 sections. Independent public-information project, not the official City of Champaign website.
- § 29.5-4.01 — Minimization of runoff
- § 29.5-4.02 — Water quality and multiple uses
- § 29.5-4.03 — Drainage system master plan coordination
- § 29.5-4.04 — Stormwater detention
- § 29.5-4.05 — Detention storage volume
- § 29.5-4.06 — Detention storage and release rate requirements
- § 29.5-4.07 — Fee in lieu of detention or compensatory storage
- § 29.5-4.08 — Detention in flood fringes
- § 29.5-4.09 — On-stream detention
- § 29.5-4.10 — Rooftop stormwater storage
- § 29.5-4.11 — Automobile parking lot storage areas
- § 29.5-4.12 — Early completion of detention facilities
- § 29.5-4.13 — Drainage system design and evaluation
- § 29.5-4.14 — Drainage in streets
- § 29.5-4.15 — Discharge of private drainage systems
- § 29.5-4.16 — Provisions for agricultural drainage
- § 29.5-4.17 — Drainage into wetlands
- § 29.5-4.18 — Channel modification
- § 29.5-4.19 — Maintenance considerations
