§ 29.5-4.01 — Minimization of runoff
Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 29.5-4.01
Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/8817fe02-9d20-4117-816f-f4d84ad9994a
Sec. 29.5-4.01. - Minimization of runoff.
In the design of a drainage plan for a development, the applicant shall evaluate and implement, where practicable, site design features which minimize the increase in runoff volumes and rates from the site. The applicant's grading and drainage plan submittal shall include evaluations of site design features which are consistent with following hierarchy: (a) Minimize impervious surfaces on the property consistent with the needs of the project; (b) Attenuate flows by use of open vegetated swales and natural depressions and preserve existing natural stream channels; (c) Provide stormwater detention structures; and (d) Construct storm sewers and channels.
(C.B. No. 97-265, § 1, 10-7-97)
Ask a question about Champaign law
Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.
