§ 29.5-4.06 — Detention storage and release rate requirements
Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 29.5-4.06
Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/a856ab9c-08f0-4d20-bc85-52017ddf2561
Sec. 29.5-4.06. - Detention storage and release rate requirements.
(a) The requirement for stormwater detention and release rate does not apply when: (1) The development is on a lot in a new subdivision for which detention is otherwise provided; (2) The development is on a lot or parcel in a subdivision for which detention was provided and approved prior to the effective date of these regulations. (b) The requirement for stormwater detention and release rate may be waived by the City Engineer when: (1) The development is below the threshold levels for requiring detention as detailed in Section 29.5-4.04 above. (2) When it can be demonstrated by acceptable engineering calculations, that the stormwater runoff from the development in a 100-year storm event will not adversely impact any other property or improvement and that all receiving drainage facilities have adequate capacity to accommodate the runoff without it causing overload to the facilities or increased flood elevation in a floodplain. (3) The City Engineer determines it is in the best interest of the City to require fee in lieu of detention.
(C.B. No. 97-265, § 1, 10-7-97)
Ask a question about Champaign law
Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.