§ 29.5-112 — Definitions
Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 29.5-112
Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/c3705ca1-c4c4-45fb-b599-ca447b14203a
Sec. 29.5-112. - Definitions.
For the purposes of this article, the following terms, phrases, words, and their derivatives shall have the meaning stated below: 29.5-112A Applicant is the legal entity who submits an application to the City for a permit pursuant to these regulations. 29.5-112B Best Management Practices (BMP) is a technique or series of techniques which are proven to be effective in controlling runoff, erosion, and sedimentation. Borrow is earth material acquired from an off-site location for use in grading on a site. 29.5-112C Certified professional erosion control specialist is a person who is certified as a certified professional erosion control specialist according to the policy and procedures as defined by Certified Professional Erosion Control Specialist Inc. (CPESC Inc.) City engineer is the City Engineer of the City and his/her duly authorized designees. Classes of permits. The following classification system is used to assign a particular land disturbance activity to a permit class: (1) Class I Land Disturbance—Land disturbances that require an IEPA ILR - ten (10) permit for one (1) acre or more land disturbance. (2) Class II Land Disturbance—Land disturbances between two thousand (2,000) square feet and one (1) acre. (3) Class III Land Disturbance—Utility company (only) land disturbances between two thousand (2,000) square feet and one (1) acre. Clearing and grubbing is the cutting and removal of trees, shrubs, bushes, windfalls and other vegetation including removal of stumps, roots, and other remains in the designated areas. Contractor is a person who contracts with the permittee, landowner, developer or another contractor (i.e., subcontractor) to undertake any or all the land disturbing activities covered by this article. Contractor's certification statement is a document required by the IEPA as part of the ILR-10 construction site activity permit. 29.5-112D Demolition is any act or process of wrecking or destroying a building or structure. Detention basin is a temporary or permanent natural or man made structure that provides for the temporary storage of storm water runoff. Developer is any person engaged in a land disturbance activity. 29.5-112E Erosion is the wearing away of the ground surface as a result of the movement of wind, water, ice, and/or land disturbance activities. Erosion and Sediment Control Plan (ESCP) is a plan which includes a set of best management practices or equivalent measures designed to control surface runoff and erosion and to retain sediment on a particular site during the period in which pre-construction and construction related land disturbances, fills, and soil storage occur, and before final improvements are completed, all in accordance with the specific requirements set forth in Section 29.5-2.02 of these Regulations. Erosion Control Inspector is a City employee who has the authority to inspect sites for compliance with the standards set forth in these Regulations. Erosion Control Inspection Report (ECIR) is the compliance report as defined by the Illinois Environmental Protection Agency in the General NPDES Permit ILR10. Excavation is the mechanical removal of earth material. 29.5-112F Fill is a deposit of soil or other earth materials placed by artificial means. Final erosion and sediment control plan (Final ESCP) is a plan which includes permanent measures and Best Management Practices to control surface runoff and control sediment if such permanent measures are not included in the ESCP Plan. Floodplain is the one hundred (100) year floodplain which is that area adjoining a watercourse which could be inundated by a flood that has a one (1) percent chance of being equaled or exceeded in any given year and is delineated on the Federal Emergency Management Agency Floodway Maps for Champaign. Final stabilization shall mean that 1) all land disturbing activities at the site have been completed, 2) there are no areas of active erosion evident, and 3) and that a uniform perennial vegetative cover with a density of 70% of the cover for the area has been established or equivalent stabilization measures (i.e., mulches or geotextiles) have been employed. 29.5-112G General storm water permit or ILR10 Permit is the Illinois Environmental Protection Agency's ILR10 general National Pollutant Discharge Elimination System (NPDES) construction storm water permit covering anyone conducting a land disturbing activity which disturbs one (1) or more acres of total land area. Grade is the vertical elevation of the ground surface. (1) Existing grade is the grade prior to grading. (2) Rough grade is the stage at which the grade approximately conforms to the approved plan. (3) Finish grade is the final grade of the site which conforms to the approved plan. 29.5-112I Incident of non-compliance is a document required by the IEPA as part of the ILR-10 construction site activity permit. This document reports violations of the ILR-10 permit. Issuing authority is the City Engineer and their duly authorized designees. 29.5-112L Land disturbance activity is any land change that may result in soil erosion from wind, water and/or ice and the movement of sediments into or upon waters, lands, or rights-of-way within the city, including but not limited to building demolition, clearing and grubbing, grading, excavating, transporting and filling of land. Land disturbance activity does not include the following: (1) Minor land disturbance activities including, but not limited to, underground utility repairs, home gardens, minor repairs. (2) Installation of fence, sign, telephone, and electric poles and other kinds of posts or poles. (3) Emergency work to protect life, limb, or property and emergency repairs. If the emergency land disturbing activity would have required an approved erosion and sediment control plan, then the land area disturbed shall be shaped and stabilized in accordance with the requirements of these regulations. 29.5-112M Manual of Practice is a compilation of technical standards and design specifications in the latest version adopted by the City Department of Public Works as being proven methods of controlling construction related surface runoff, erosion and sedimentation. 29.5-112N Notice of intent is a document required by the IEPA as part of the ILR-10 construction site activity permit. This document is the application for an ILR-10 construction site activity permit from the IEPA. Notice of termination is a document required by the IEPA as part of the ILR-10 construction site activity permit. This document requests the end of coverage for a construction under the terms of the ILR-10 permit. 29.5-112O Owner is any person with a legal or equitable interest in the land for which a land disturbance permit has been issued. 29.5-112P Permit is a land disturbance permit issued by the City Engineer pursuant to these regulations. Permittee is the applicant in whose name a valid permit is duly issued pursuant to these regulations and his/her agents, employees, and others acting under his/her direction. Professional engineer is a person licensed under the laws of the State of Illinois to practice professional engineering. 29.5-112R Runoff is rainfall, snowmelt, or irrigation water flowing over the ground surface. 29.5-112S Sediment is soils or other surficial materials transported by surface water as a product of erosion. Sedimentation is the process or action of depositing sediment that is determined to have been caused by erosion. Site is the entire area of land on which the land disturbance activity is proposed in the permit application. Site plan is a written plan or set of plans showing the details of any land disturbance activity of a site including but not limited to the construction of: structures, open and enclosed drainage facilities, storm water management facilities, parking lots, driveways, curbs, pavements, sidewalks, bike paths, recreational facilities, ground covers, plantings, and landscaping. Slope is the incline of a ground surface expressed as a ratio of horizontal distance to vertical distance. Soil is naturally occurring surface deposits overlying bedrock. Stripping is any activity which removes or significantly disturbs the vegetative surface cover including clearing, grubbing of stumps and root mat, and topsoil removal. Stop work order is a document issued by the City Engineer that directs work to stop on a construction site if land disturbance activities are in violation of these regulations. Structure is anything manufactured, constructed or erected which is normally attached to or positioned on land, including buildings, portable structures, earthen structures, roads, parking lots, and paved storage areas. Surveyor is a person duly registered or authorized to practice land surveying in the State of Illinois. Storm water pollution prevention plan (SWPPP) is a document required by the IEPA as part of the ILR-10 construction site activity permit. This document is a written description of the erosion and sediment control plan for a construction site. 29.5-114T Topsoil is the upper layer of soil. 29.5-114U Utility is the owner/operator of any underground facility including an underground line, facility, system, and its appurtenances used to produce, store, convey, transmit, or distribute communications, data, electricity, power, heat, gas, oil, petroleum products, water, steam, sewage and other similar substances. 29.5-114W Washout facility is a location where construction waste such as concrete, asphalt or similar material can be temporarily stored until final disposal of the material. Watercourse is any natural or improved stream, river, creek, ditch, channel, canal, conduit, gutter, culvert, drain, gully, swale, or wash in which waters flow either continuously or intermittently. Watershed is a region draining to a specific river, river system, or body of water. Wetlands is a lowland area such as a marsh, that is saturated with moisture, as defined in Sec. 404, Federal Water Pollution Control Act Amendments of 1987.
(C.B. No. 2008-156, § 2, 7-1-08)
Ask a question about Champaign law
Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.
