§ 29.5-217 — Inspection and supervision

Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 29.5-217

Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/8545aedb-a7f9-48d7-a874-65e663d6a375

Sec. 29.5-217. - Inspection and supervision.

(a) All work for which a permit is required shall be subject to inspection by the City refusal to allow entry of City personnel to inspect for compliance with these regulations or interference with such inspection, shall be grounds for the issuance of a stop work order. (b) The contractor and/or their agents shall conduct a pre-construction meeting on-site with the erosion control inspector on each site which has an approved ESCP. (c) After commencing initial grading or land disturbing activities, the permittee shall obtain written inspection approvals by the erosion control inspector at the following stages in the development of the site, or of each subdivision thereof: (1) Upon completion of installation of perimeter erosion and sediment controls and prior to proceeding with any other land disturbance or grading. Other building or grading inspection approvals may not be authorized until initial approval is made by the erosion control inspector. (2) Upon completion of stripping, the stockpiling of topsoil, the construction of temporary erosion and sediment control facilities, disposal of all waste material, and preparation of the ground and completion of rough grading but prior to placing top soil, permanent drainage or other site development improvements and ground covers. (3) Upon completion of final stabilization including grading, permanent drainage and erosion control facilities including established ground covers and planting, and all other work of the permit. (d) The City Engineer may require additional inspections as may be deemed necessary. work shall not proceed beyond the stages outlined above until the erosion control inspector inspects the site and approves the work previously completed. Requests for inspections shall be made at least twenty-four (24) hours in advance (exclusive of Saturdays, Sundays, and holidays) of the time the inspection is desired. Upon request for inspections, the erosion control inspector shall perform the inspection within forty-eight (48) hours of request. The inspection to determine compliance with these regulations shall not normally include a new building which was completed and which has been secured, but shall include inspection of any area of the property where land disturbing activity is occurring, or is thought to be planned.

(C.B. No. 2008-156, § 2, 7-1-08)

Ask a question about Champaign law

Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.