§ 29.5-207 — Erosion and sediment control plan
Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 29.5-207
Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/9aad0ee1-8b7c-48b2-ae8b-1bd97c45976a
Sec. 29.5-207. - Erosion and sediment control plan.
Land disturbance activities that are in the Class 1 category require an erosion and sedimentation control plan prepared by a licensed professional engineer or a certified professional erosion control specialist and must be approved by the City Engineer. These plans shall be drawn to an appropriate scale and shall include sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed grading on water resources, and measures proposed to minimize soil erosion and off-site sedimentation. The following information shall be included in any ESCP: (1) A letter of transmittal, which includes a project narrative. (2) An attached vicinity map showing the location of the site in relationship to the surrounding area's watercourses, water bodies and other significant geographic features, roads and other significant structures. (3) An indication of the scale used and a north arrow. (4) The name, address, and telephone number of the owner and/or developer of the property where the land disturbing activity is proposed. (5) Suitable contours for the existing and proposed topography. (6) Type of soils present on the site, as defined by the "Soil Survey of Champaign County, Illinois", prepared by the United States Department of Agriculture Natural Resources Conservation Service. (7) The proposed grading or land disturbance activity including: the surface area involved, excess spoil material, use of borrow material, and specific limits of disturbance. (8) Location of washout facilities for concrete and asphalt materials indicated on the site plan. Provide details of proposed washout facilities. Washout facilities shall be designated by the permit holder before work begins and shall be located in an appropriate area where the waste resulting from the washout cannot enter sewer systems or local waterways. Waste from the washout facilities shall be disposed of in an approved manner according to State Laws. (9) A clear and definite delineation of any areas of vegetation or trees to be saved. (10) A clear and definite delineation of any wetlands, natural or artificial water storage detention areas, and drainage ditches on the site. (11) A clear and definite delineation of any one hundred (100) year floodplain on or near the site. (12) Storm drainage systems, including quantities of flow and site conditions around all points of surface water discharge from the site. (13) Erosion and sediment control provisions to minimize on-site erosion and prevent off-site sedimentation, including provisions to preserve topsoil and limit disturbance. Provisions shall be in accordance with the standards presented in the Manual of Practice. (14) Design details for both temporary and permanent erosion control structures. Details shall be in accordance with the standards presented in the Manual of Practice. (15) Details of temporary and permanent stabilization measures including a construction note on the plan stating: "Following initial soil disturbance or redisturbance, permanent or temporary stabilization shall be completed within seven (7) calendar days on all perimeter dikes, swales, ditches, perimeter slopes, and all slopes greater than 3 horizontal to 1 vertical (3:1); embankments of ponds, basins, and traps; and within fourteen (14) days on all other disturbed or graded areas. The requirements of this section do not apply to those areas which are shown on the plan and are currently being used for material storage or for those areas on which actual construction activities are currently being performed." (16) A chronological construction schedule and time frame including, as a minimum, the following activities: a. Clearing and grubbing for those areas necessary for installation of perimeter erosion control devices. b. Construction of perimeter erosion control devices. c. Remaining interior site clearing and grubbing. d. Installation of permanent and temporary stabilization measures. e. Road grading. f. Grading for the remainder of the site. g. Building, parking lot, and site construction. h. Final grading, landscaping or stabilization. i. Implementation and maintenance of final erosion control structures. j. Removal of temporary erosion control devices. (17) A statement on the plan noting that the contractor, developer, and owner shall request the erosion control inspector to inspect and approve work completed in accordance with the approved ESCP, and in accordance with the ordinance. (18) A description of, and specifications for, sediment retention structures. (19) A description of, and specifications for, surface runoff and erosion control devices. (20) A description of vegetative measures. (21) Proposed vegetative conditions of the site on the 15th of each month between and including the months of April through October. (22) The seal of a licensed professional engineer in the State of Illinois, if applicable.
(C.B. No. 2008-156, § 2, 7-1-08)
Ask a question about Champaign law
Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.
