Sec. 29.5-3.14. - Other protective measures.

Only a nonresidential building may be floodproofed (in lieu of elevation) provided that a professional engineer shall certify that the building has been structurally floodproofed below the flood protection elevation and the structure and attendant utility facilities are watertight and capable of resisting the effects of the base flood or 100-year frequency flood. The building design shall take into account flood velocities, duration, rate of rise, hydrostatic and hydrodynamic forces, the effects of buoyancy, and impacts from debris or ice. Floodproofing measures shall be operable without human intervention and without an outside source of electricity. Levees, berms, floodwalls and similar works are not considered floodproofing for the purposes of these regulations.

(C.B. No. 97-265, § 1, 10-7-97)