For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Chapter 3 — General Regulations (18-29-301 et seq.)

Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026), Chicago, IL · 79 sections. Independent public-information project, not the official City of Chicago website.

  1. § 18-29-301.1 — Scope
  2. § 18-29-301.2 — System installation
  3. § 18-29-301.3 — Connections to drainage system
  4. § 18-29-301.4 — Connections to water supply
  5. § 18-29-301.5 — Pipe, tube and fitting sizes
  6. § 18-29-301.6 — Prohibited locations
  7. § 18-29-301.7 — Conflicts
  8. § 18-29-302.1 — Detrimental or dangerous materials
  9. § 18-29-302.2 — Industrial wastes
  10. § 18-29-303.1 — Identification
  11. § 18-29-303.2 — Installation of materials
  12. § 18-29-303.3 — Plastic pipe, fittings and components
  13. § 18-29-303.4 — Third-party certification
  14. § 18-29-303.5 — Cast-iron soil pipe, fittings and components
  15. § 18-29-304.1 — General
  16. § 18-29-304.2 — Strainer plates
  17. § 18-29-304.3 — Meter boxes
  18. § 18-29-304.4 — Openings for pipes
  19. § 18-29-305.1 — Protection against contact
  20. § 18-29-305.3 — Stress and strain
  21. § 18-29-305.5 — Pipes through or under footings or foundation walls
  22. § 18-29-305.6 — Freezing
  23. § 18-29-305.6.1 — Sewer depth
  24. § 18-29-305.6.2 — Water main depth
  25. § 18-29-305.7 — Waterproofing of openings
  26. § 18-29-305.8 — Protection against physical damage
  27. § 18-29-305.9 — Protection of components of plumbing system
  28. § 18-29-306.1 — Support of piping
  29. § 18-29-306.2 — Trenching and bedding
  30. § 18-29-306.2.1 — Overexcavation
  31. § 18-29-306.2.2 — Rock removal
  32. § 18-29-306.2.3 — Soft loadbearing materials
  33. § 18-29-306.3 — Backfilling
  34. § 18-29-306.4 — Tunneling
  35. § 18-29-307.1 — General
  36. § 18-29-307.2 — Cutting, notching or boring of holes
  37. § 18-29-307.3 — Penetrations of floor/ceiling assemblies and fire-resistance-rated assemblies
  38. § 18-29-307.4 — Protection of footings
  39. § 18-29-307.5 — Alterations to trusses
  40. § 18-29-307.6 — Piping material exposed within plenums
  41. § 18-29-308.1 — General
  42. § 18-29-308.2 — Piping seismic supports
  43. § 18-29-308.3 — Materials
  44. § 18-29-308.4 — Structural attachment
  45. § 18-29-308.5 — Interval of support
  46. § 18-29-308.6 — Sway bracing
  47. § 18-29-308.7 — Anchorage
  48. § 18-29-308.7.1 — Location
  49. § 18-29-308.8 — Expansion joint fittings
  50. § 18-29-308.8.1 — Vertical expansion
  51. § 18-29-308.9 — Stacks
  52. § 18-29-308.10 — Parallel water distribution systems
  53. § 18-29-308.11 — Thermal expansion tanks
  54. § 18-29-309.1 — General
  55. § 18-29-309.1.1 — Base flood elevation
  56. § 18-29-310.1 — Light and ventilation
  57. § 18-29-310.2 — Location of fixtures and compartments
  58. § 18-29-310.3 — Interior finish
  59. § 18-29-311.1 — General
  60. § 18-29-312.1 — Required tests
  61. § 18-29-312.2 — Drainage and vent water test
  62. § 18-29-312.2.1 — Building drain test
  63. § 18-29-312.5 — Water supply system test
  64. § 18-29-312.6 — Gravity sewer test
  65. § 18-29-312.7 — Forced sewer test
  66. § 18-29-312.8 — Storm drainage system test
  67. § 18-29-312.9 — Cross connection control device inspections
  68. § 18-29-313.1 — General
  69. § 18-29-314.1 — Fuel-burning appliances
  70. § 18-29-314.2 — Evaporators and cooling coils
  71. § 18-29-314.2.1 — Condensate disposal
  72. § 18-29-314.2.2 — Drain pipe materials and sizes
  73. § 18-29-314.2.3 — Auxiliary and secondary drain systems
  74. § 18-29-314.2.3.1 — Water-level monitoring devices
  75. § 18-29-314.2.3.2 — Appliance, equipment and insulation in pans
  76. § 18-29-314.2.4 — Traps
  77. § 18-29-314.2.4.1 — Ductless mini-split system traps
  78. § 18-29-314.2.5 — Drain line maintenance
  79. § 18-29-315.1 — Sealing of annular spaces
Chapter 3 — General Regulations (18-29-301 et seq.) | Chicago, IL | Corpus