§ 18-29-604.10.1.1 — Demand load
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 18-29-604.10.1.1
Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/90eaabdf-beb7-4685-9337-e0be165e7dc6
18-29-604.10.1.1 Demand load.
The water supply demand load in the distributing system shall be based upon the number, type, and probable simultaneous use of the fixtures to be supplied.
Ask a question about Chicago law
Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.
