For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-23-5 — DESIGN STANDARDS AND FEATURES

City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 4-23-5

Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/0262fad6-244b-4eb9-84b4-66e0af5166a1

4-23-5. - DESIGN STANDARDS AND FEATURES.

An erosion and sediment control plan for developments with site disturbance over five thousand (5,000) square feet must be submitted and approved prior to the issuance of the building permit. The plan must include the following features: (A) Standards and specifications for erosion and sediment control measures, which shall be in accordance with the Illinois Urban Manual (current edition) and other recognized best management practices (BMPs). (B) The runoff from disturbed areas shall not leave the site without first passing through sediment control measures or devices. This requirement shall apply to all phases of construction and shall include an ongoing process of implementation of measures and maintenance of those measures during both the construction season and any construction shutdown periods. (C) The condition of the construction site for winter shutdown shall be addressed early in the fall growing season so that slopes and other bare earth areas may be stabilized with temporary and/or permanent vegetative cover for proper erosion and sediment control. All open areas that are to remain idle throughout the winter shall receive temporary erosion control measures including temporary seeding, mulching and/or erosion control blanket prior to the end of the fall growing season. The areas to be worked beyond the end of the growing season must incorporate soil stabilization measures that do not rely on vegetative cover such as erosion control blanket and heavy mulching. (D) The perimeter sediment control measures shall be installed and functioning prior to soil disturbance. (E) The erosion and sediment control plan shall designate a series of practices which shall be implemented either at the direction of the applicant or the applicant's representative onsite or at the direction of the Public Works Director, should an inspection of the site indicate a deficiency in soil and sediment erosion control measures. At a minimum, the following measures shall be established: 1. Preconstruction photos of surrounding public right-of-way (streets, alleys, sidewalk, parkways, etc.); 2. Stabilized construction entrance and truck washout areas; 3. Sediment traps; 4. Inlet protection filters; 5. Silt fences; 6. Compaction control; 7. Temporary seeding; 8. Mulching; 9. Erosion control blankets; and 10. Dust control watering. (F) The permanent erosion control measures shall be initiated within seven (7) days following the completion of soil disturbing activities.

(Ord. No. 43-O-19, § 1, 5-13-2019)

Ask a question about Evanston law

Corpus searches the Evanston sections it holds and shows the ones that match, with their citations. Free, no sign-in.