4-23-8. - CONSTRUCTION PHASE REQUIREMENTS.
During construction, the following erosion and sediment control measures shall be undertaken: (A) If a stockpile is to remain in place for more than two (2) days, perimeter sediment controls shall be provided around the stock pile. The stockpile shall be covered with a tarp to prevent wind erosion. (B) Storm sewer inlets shall be protected with sediment trapping and/or filter control devices during construction. (C) Water pumped, or otherwise discharged, from the site during construction dewatering shall be filtered and a means provided to reduce erosion. (D) Graveled roads, access drives, parking areas of sufficient width and length and vehicle wash-down facilities shall be provided to prevent soil from being tracked onto public or private roadways or alleys. Any soil tracked onto a public or private roadway or alley shall be removed before the end of each workday or sooner as directed by the City. (E) All waste generated as a result of site development, including but not limited to, any building waste, concrete truck washout, chemicals, litter, sanitary waste, or any other waste shall be properly disposed of and shall be prevented from being transported off-site by either wind or water.
(Ord. No. 43-O-19, § 1, 5-13-2019)
Ask a question about Evanston law
Corpus searches the Evanston sections it holds and shows the ones that match, with their citations. Free, no sign-in.