§ 30-302 — Certification and maintenance
Code of Ordinances of the Village of Palatine, Illinois (Codified through Ordinance No. O-113-26, enacted October 12, 2026. (Supp. No. 2, Update 2)) · Palatine Code of Ordinances § 30-302
Corpus is an independent public-information project, not the official City of Palatine website. Stable reference: corpuslaw.us/code/1528153c-14d7-492c-ab68-80e90bfbf159
Sec. 30-302. - Certification and maintenance.
(a) It shall be the duty of the consumer at any premises on which backflow prevention devices are required by this article to ensure that the backflow protection devices are installed and have inspections, tests, maintenance and repairs made in accordance with the following schedule or more often where inspections indicate a need or are specified in manufacturer's instructions: ..... (1) Fixed proper air gap separations shall be inspected to document that a proper vertical distance is maintained between the discharge point of the service line and the flood level rim of the receptacle at the time of installation and at least annually thereafter. ..... (2) Reduced pressure principle backflow prevention devices shall be tested at the time of installation and at least annually or more frequently if recommended by the manufacturer, and required service performed prior to certification expiration. ..... (b) Each cross connection control device shall be tested at the consumer's expense at the time of installation and at least annually or more frequently, if recommended by the manufacturer. The inspection of mechanical devices must include physical testing in accordance with the manufacturer's instructions. ..... (c) Maintenance records shall be available for inspection by the agency or the public works director or designee at any time. ..... (d) Records of the annual inspection must be submitted to the public works director or designee within 15 days of the renewal date. ..... (e) Each cross connection control device shall have a tag attached listing the date of most recent test, name of CCCDI, and type and date of repairs. ..... (f) A maintenance log shall be maintained at the site of installation and include: ..... (1) Make, model and serial number of the backflow preventer and its location at the site; ..... (2) Date of each test; ..... (3) Name and approval number of the person performing the test; ..... (4) Type of test kit used and date of its most recent calibration; ..... (5) Test results and a brief statement indicating whether the results pass or fail the test; ..... (6) Repairs or servicing required; ..... (7) Repairs and date completed; ..... (8) Servicing performed and date completed. ..... (g) Whenever backflow prevention devices required by this article are found to be defective, they shall be repaired or replaced at the expense of the consumer within ten days of notification or sooner, if required by the public works director or designee. ..... (h) Backflow prevention devices shall not be bypassed, made inoperative, removed, or otherwise made ineffective without specific written authorization by the public works director. .....
(Code 1976, § 19-140; Ord. No. O-109-24, Exh. A(19-140), 11-18-2024)
Ask a question about Palatine law
Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
