For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.01 — General requirements

Code of Ordinances of the Village of Palatine, Illinois (Codified through Ordinance No. O-113-26, enacted October 12, 2026. (Supp. No. 2, Update 2)) · Palatine Code of Ordinances, App. B, art. VIII, § 8.01

Corpus is an independent public-information project, not the official City of Palatine website. Stable reference: corpuslaw.us/code/f9a4a09d-24e5-44ff-a02a-73163c28ea50

8.01. - General requirements.

(a) [Standards.] The owner or subdivider shall install storm and sanitary sewers, water supply system, street grading and pavement, sidewalk, pedestrian ways, public utilities and street lighting in accordance with applicable ordinances of the village and with the 1964 Report and Master Plan for Sanitary Sewer Extensions, the 1964 Report and Master Plan for Storm Drainage, and the 1975 and 1981 Report and Master Plan for Water Supply and Distribution. (b) Soils investigations and physical tests. (1) If the proposed subdivision contains questionable soil, and in the opinion of the village engineer, soil investigators borings or other soil tests are necessary to determine the nature and extent of such questionable material, the subdivider, builder or land developer shall retain the services of a competent testing laboratory to perform the needed investigations. Such testing laboratory shall be subject to the approval of the village. (2) Copies of the completed reports compiled by the testing laboratory shall be filed with the village engineer. (c) Supervision. The design engineer engaged by the subdivider, builder or land developer shall be represented by his agent at the site of construction at all times when construction or required land improvements is in progress; failure to comply with this requirement shall constitute grounds for immediate stoppage of said construction by the administrator. (d) Inspection. (1) All required improvements, public and private, shall be inspected by the village engineer during the course of construction and at completion for compliance with this appendix and the approved plans and specifications. (2) Builders and developers are required to notify the department of engineering a minimum of forty-eight (48) hours prior to beginning any underground or surface improvements (sewer, water, paving, including parking lots, etc.) to arrange for the appropriate inspections.

Ask a question about Palatine law

Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.